Dry-Dock: USCG STA SAN FRANCISCO (45770) FY26 DD

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
70Z04026QSBPL0005
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
336611 Ship Building and Repairing

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Coast Guard Surface Forces Logistic Center is soliciting firm fixed-price quotations for drydock repairs and maintenance services to USCG Station San Francisco (vessel 45770) under solicitation number 70Z04026QSBPL0005. The Coast Guard seeks comprehensive ship repair services including fender system work, hose renewals, coating preservation, and structural repairs, with work to be performed at the contractor's facility. Qualified contractors must demonstrate current certifications including SSPC QP-1 or NACE Level 3 for coating work, JCP certification for accessing critical technology drawings, welding certifications, and drydock certifications per SFLC STD SPEC 8634B. Evaluation will employ a lowest-price technically acceptable approach, with evaluation factors including technical capability, past performance (requiring three completed CPARS projects or past performance questionnaires with "Satisfactory" or higher ratings), and price. The proposal deadline is March 26, 2026, at 2:00 PM EST (extended from the original March 18 deadline via Amendment A00002), with requests for clarification no longer accepted as of March 11, 2026, at 2:00 PM EST, and anticipated contract award on May 1, 2026.

This acquisition is a 100% set-aside for Women-Owned Small Businesses (WOSB) under NAICS code 336611 with a size standard of 1,350 employees, with no incumbent contractor identified. The performance period extends from July 8, 2026, to October 6, 2026 (a 90-calendar-day availability), with specific contract requirements including proof of $500,000 Ship Repairer's Liability and Comprehensive General Liability insurance plus Longshoremen's and Harbor Workers' Act coverage. Contractors located outside 320 nautical miles from San Francisco must include transportation costs, crane rental, per diem, and operating costs in their pricing. Quotations must be submitted electronically to Regina Elliott-Dougherty at Regina.ElliottDougherty@uscg.mil, proposals must remain valid for 190 days, and all amendments must be signed and submitted with proposals. Work will be performed at the contractor's facility, which must meet accessibility requirements including a minimum 7-foot water depth and 25-foot clearance.

Notice text

4 versions

Update #4 · Latest ·

USCG STA SAN FRANCISCO (45770) FY26 DRYDOCK REPAIRS

NOTE: ALL AMENDMENTS MUST BE SIGNED AND SENT IN WITH PROPSALS.

AMENDMENT:

A00003:

This amendment A00003 is to answer RFC questions for vessel 70Z04026QSBPL0005 USCG SAN FANCISCO (45770)

  1. D-031 Fendering System, Repair: Question: The Specs say to use the kit to repair the area noted in Table 1, but there is no Table 1 on the spec. Please let us know which section of the fender will be repaired and provide a picture if possible.

Answer: Though Table 1 is mentioned in paragraph 3.2 for repair, the Contractor should follow the overall Intent of the Work Item which states: 1.1 Intent.  This work item describes the requirements for the Contractor to repair areas in the fendering system at the COR’s discretion. This will be determined once the CG Representative (COR) is onsite with the Contractor on this work item. The Contractor is more than welcome to conduct a site visit of the vessel prior to submitting any documentation if they choose.2

2.D-032 Fender System, Renew: Question:  The specs are duplicative between D-004, D-020, D-031, and D-032. 

-Do you want us to include all the fender faying preservation on D-020 & D-032?

Answer: Work Item D-020 FENDER FAYING SURFACES, PRESERVE, 100 PERCENT is for the Contractor to preserve fender faying surfaces in its entirety to include all the miscellaneous parts associated within. As the intent states: 1.1 Intent.  This work item describes the requirements for the Contractor to preserve the fender faying surfaces to include fender strake, fender flat bar, and fender stops. This is for the entire fender faying system.

3.Do you want us to include removals and installations on both D-004 & D-032?

  • Answer: Given the fact that Work Item D-004 requires the Contractor to remove all the fenders to provide an adequate inspection, all fenders will have to be removed. Work Item D-032: Fender System, Renew calls out sections of the system to be renewed. Stating that, all fenders have to be removed and installed in accordance with Work Item D-004. Only three of those Fendering sections will be replaced with new fenders in accordance with Work Item D-032.

A00002:

AMENDMENT A00002 for 70Z04026QSBPL0005 for the USCG STA SAN FRANCISCO (45770) FY26 DD

This amendment is being issued to allow the USCG to respond to Request for Clarification received. As of 11 March 2026, 2:00pm EST, no more Request for Clarification will be accepted. An Amendment will be posted on 16 March 2026 in response to the Request for Clarification received.

As a result of the above the new closing date is scheduled for 26 MARCH 2026.

A000001

This amendment A00001 is to answer RFC questions for vessel USCG SAN FANCISCO (45770)

  1. QUESTION: Work Item D‑15, Standard Hose, Renew. The specification lists the Government‑Furnished Property as a parts kit: Hose Assembly NSN 4720‑01‑679‑1782 / P/N 45‑RB‑M‑505‑101. Please confirm what is included in this kit? Specifically, does it contain everything required to complete the hose renewal, or will the contractor need to purchase any additional materials or components to perform the work? 

ANSWER: All hoses necessary to complete the work associated with Work Item D-015: Standard Hoses, Renew are included in the kit. The kit contains the hoses (completely built) only! All other consumables if needed (i.e. petrolatum-based tape, chaffing gear) as outlined in the work item shall be procured by the Contractor.

  1. QUESTION: How do you want me to submit the bid, I do not see a boiler plate included with the documents. 

Answer: Please submit your proposal in accordance to Schedule of Supplies and Service and specification service according to SPE REV-0, 22 JANURARY 2026.

-------------------------

Combined Synopsis/ Solicitation 70Z04026QSBPL0005, Specification package Rev-0, dated

22 JANUARY 2026 Past Performance Questionnaire, Schedule of Supplies and Services, information is provided as a PDF file and available for download.

The Period of Performance POP is 08 JULY 2026 TO 06 OCTOBER 2026 

This availability is a Ninety (90) calendar day(s) availability

Update #3 ·

USCG STA SAN FRANCISCO (45770) FY26 DRYDOCK REPAIRS

NOTE: ALL AMENDMENTS MUST BE SIGNED AND SENT IN WITH PROPSALS.

AMENDMENT:

A000002:

AMENDMENT A00002 for 70Z04026QSBPL0005 for the USCG STA SAN FRANCISCO (45770) FY26 DD

This amendment is being issued to allow the USCG to respond to Request for Clarification received. As of 11 March 2026, 2:00pm EST, no more Request for Clarification will be accepted. An Amendment will be posted on 16 March 2026 in response to the Request for Clarification received.

As a result of the above the new closing date is scheduled for 26 MARCH 2026.

A000001

This amendment A00001 is to answer RFC questions for vessel USCG SAN FANCISCO (45770)

  1. QUESTION: Work Item D‑15, Standard Hose, Renew. The specification lists the Government‑Furnished Property as a parts kit: Hose Assembly NSN 4720‑01‑679‑1782 / P/N 45‑RB‑M‑505‑101. Please confirm what is included in this kit? Specifically, does it contain everything required to complete the hose renewal, or will the contractor need to purchase any additional materials or components to perform the work? 

ANSWER: All hoses necessary to complete the work associated with Work Item D-015: Standard Hoses, Renew are included in the kit. The kit contains the hoses (completely built) only! All other consumables if needed (i.e. petrolatum-based tape, chaffing gear) as outlined in the work item shall be procured by the Contractor.

  1. QUESTION: How do you want me to submit the bid, I do not see a boiler plate included with the documents. 

Answer: Please submit your proposal in accordance to Schedule of Supplies and Service and specification service according to SPE REV-0, 22 JANURARY 2026.

-------------------------

Combined Synopsis/ Solicitation 70Z04026QSBPL0005, Specification package Rev-0, dated

22 JANUARY 2026 Past Performance Questionnaire, Schedule of Supplies and Services, information is provided as a PDF file and available for download.

The Period of Performance POP is 08 JULY 2026 TO 06 OCTOBER 2026 

This availability is a Ninety (90) calendar day(s) availability

Update #2 ·

USCG STA SAN FRANCISCO (45770) FY26 DRYDOCK REPAIRS

AMENDMENT: 

This amendment is to answer RFC questions for vessel USCG SAN FANCISCO (45770)

  1. QUESTION: Work Item D‑15, Standard Hose, Renew. The specification lists the Government‑Furnished Property as a parts kit: Hose Assembly NSN 4720‑01‑679‑1782 / P/N 45‑RB‑M‑505‑101. Please confirm what is included in this kit? Specifically, does it contain everything required to complete the hose renewal, or will the contractor need to purchase any additional materials or components to perform the work? 

ANSWER: All hoses necessary to complete the work associated with Work Item D-015: Standard Hoses, Renew are included in the kit. The kit contains the hoses (completely built) only! All other consumables if needed (i.e. petrolatum-based tape, chaffing gear) as outlined in the work item shall be procured by the Contractor.

  1. QUESTION: How do you want me to submit the bid, I do not see a boiler plate included with the documents. 

Answer: Please submit your proposal in accordance to Schedule of Supplies and Service and specification service according to SPE REV-0, 22 JANURARY 2026.

-------------------------

Combined Synopsis/ Solicitation 70Z04026QSBPL0005, Specification package Rev-0, dated

22 JANUARY 2026 Past Performance Questionnaire, Schedule of Supplies and Services, information is provided as a PDF file and available for download.

The Period of Performance POP is 08 JULY 2026 TO 06 OCTOBER 2026 

This availability is a Ninety (90) calendar day(s) availability

Update #1 ·

USCG STA SAN FRANCISCO (45770) FY26 DRYDOCK REPAIRS

Combined Synopsis/ Solicitation 70Z04026QSBPL0005, Specification package Rev-0, dated

22 JANUARY 2026 Past Performance Questionnaire, Schedule of Supplies and Services, information is provided as a PDF file and available for download.

The Period of Performance POP is 08 JULY 2026 TO 06 OCTOBER 2026 

This availability is a Ninety (90) calendar day(s) availability

Files

File Type Posted
70Z04026QSBPL0005_3_US.pdf PDF
70Z04026QSBPL00050002_US.pdf PDF
70Z04026QSBPL0005_1_US.pdf PDF
45770 ADDITONAL CONTRACT REQUIREMENTS.pdf PDF
45770-Schedule of Supplies and Services.docx DOCX document
45770 PPQ.pdf PDF
CG 45770 FY26 SPEC.pdf PDF

Notice history

Notice Type Posted
Dry-Dock: USCG STA SAN FRANCISCO (45770) FY26 DD Award Award Notice
This notice Latest solicitation Solicitation
Dry-Dock: USCG STA SAN FRANCISCO (45770) FY26 DD Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
USCG STA SAN francisco (45667) FY27 DD repairs San Francisco, California 94130, United States · NAICS 336611 — Total Small Business
CGC barbara mabrity NAICS 336611 — Total Small Business
USCGC hammer (wlic 75302) USCG 68A barge (68014) drydock repairs FY2027 Jacksonville, Florida 32226, United States · NAICS 336611 — Total Small Business
CGC kukui drydock United States · NAICS 336611 — Total Small Business
Drydock repairs for the CGC anvil NAICS 336611 — Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors