CG 45770 FY26 SPEC.pdf

PDF 2 MB Posted

Attached to
Dry-Dock: USCG STA SAN FRANCISCO (45770) FY26 DD
Solicitation number
70Z04026QSBPL0005
Issued by

View the file

Other files

File Type Posted
70Z04026QSBPL0005_3_US.pdf PDF
70Z04026QSBPL00050002_US.pdf PDF
70Z04026QSBPL0005_1_US.pdf PDF
45770 ADDITONAL CONTRACT REQUIREMENTS.pdf PDF
45770 PPQ.pdf PDF
45770-Schedule of Supplies and Services.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCG 45770 (RB-M 45)

SPECIFICATION FOR DRYDOCK REPAIRS

FY2026

Developed By: Tim Tolliver

(Rev-0, 22 January 2026)

USCG 45770 (RB-M-45) DRYDOCK AVAILABILITY FY2026

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................... vii Consolidated List of Critical Inspection Items ............................................................................................. xi Principal Characteristics ............................................................................................................................. xii General Requirements WORK ITEM 1: General Welding, Provide WORK ITEM 2: Ultrasonic Testing (UT) (100) Shots, Perform WORK ITEM 3: Hull Plating (U/W Body), Inspect WORK ITEM 4: Fendering System, Inspect WORK ITEM 5: Accessible Spaces, Inspect WORK ITEM 6: Diesel Fuel Tank, Clean and Inspect WORK ITEM 7: Mast, Inspect WORK ITEM 8: Main Diesel Engine(s) and Reduction Gear(s), Remove and Install WORK ITEM 9: Main Diesel Engine(s) To MEPS Generator(s) And Jet Drive(s), Align WORK ITEM 10: Water Jet-Inspect, Perform Service WORK ITEM 11: Jet Drive Anodes, Renew WORK ITEM 12: Sea Strainer, Renew WORK ITEM 13: Engine Exhaust Piping, Inspect WORK ITEM 14: Electrical Isolation, Perform, MEPS WORK ITEM 15: Standard Hoses, Renew WORK ITEM 16: Various Piping, Inspect WORK ITEM 17: MDE SW Valves, Overhaul WORK ITEM 18: Sea Valves, Renew WORK ITEM 19: Diesel Tanks, Refuel WORK ITEM 20: Fender Faying Surfaces, Preserve, 100 percent WORK ITEM 21: Water Jet Drive, Preserve WORK ITEM 22: U/W Body, Preserve (100%) WORK ITEM 23: Exterior and Interior Non-Skid Pads, Renew WORK ITEM 24: Interior Hull Insulation, Renew WORK ITEM 25: Marine Chemist Services, Provide WORK ITEM 26: Drydock WORK ITEM 27: Temporary Services, Provide WORK ITEM 28: Sea Trial Performance, Support, Provide WORK ITEM 29: Lazarette Bilge, Preserve WORK ITEM 30: Tow Reel, Anchor Reel - Preserve WORK ITEM 31: Fendering System, Repair WORK ITEM 32: Fender System, Renew WORK ITEM 33: Main Diesel Engine Oil Pan Gasket, Renew WORK ITEM 34: Window(s), Renew iii (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 45 RB-M 084-002, Rev -, Docking Plan

Coast Guard Drawing 45 RB-M 084-002, Rev –, Docking Plan

Coast Guard Drawing 45 RB-M 084-005, Rev -, Main Diesel Engine Mounting for 45FT RB-M

Coast Guard Drawing 45 RB-M 110-001, Rev -, Hull Structure

Coast Guard Drawing 45 RB-M 110-002, Rev -, Hull Structure Module A

Coast Guard Drawing 45 RB-M 110-003, Rev -, Hull Structure Module B

Coast Guard Drawing 45 RB-M 114-001, Rev -, Fendering Arrangement

Coast Guard Drawing 45 RB-M 170-002, Rev B, Folding Mast

Coast Guard Drawing 45 RB-M 182-001, Rev -, Propulsion System Foundations

Coast Guard Drawing 45 RB-M 185-001, Rev A, Auxiliary System Foundations

Coast Guard Drawing 45 RBM 201-001, Rev B, Main Engine Arrangement

Coast Guard Drawing 45 RB-M 201-001, Rev B, Main Engine Arrangement

Coast Guard Drawing 45 RBM 247-002, Rev -, Water Jet Propulsor Arrangement

Coast Guard Drawing 45 RB-M 247-002, Rev -, Water Jet Propulsor Arrangement

Coast Guard Drawing 45 RB-M 252-002, Rev A, Propulsion Control System

Coast Guard Drawing 45 RB-M 256-002, Rev -, Cooling System Propulsion

Coast Guard Drawing 45 RB-M 256-101, Rev -, Cooling System HVAC

Coast Guard Drawing 45 RB-M 259-002, Rev -, Exhaust System

Coast Guard Drawing 45 RB-M 261-001, Rev -, Fuel Supply System Schematic

Coast Guard Drawing 45 RB-M 261-002, Rev -, Fuel Supply System

Coast Guard Drawing 45 RB-M 261-004, Rev -, Fuel Supply System Tubes

Coast Guard Drawing 45 RB-M 261-005, Rev -, Fuel Supply System - Pipe Assemblies

Coast Guard Drawing 45 RB-M 261-100, Rev -, Fuel Fill and Vent Schematic

Coast Guard Drawing 45 RB-M 261-101, Rev -, Fuel Fill and Vent Arrangement

Coast Guard Drawing 45 RB-M 262-002, Rev -, Lube Oil FLOCS System

Coast Guard Drawing 45 RB-M 311-001, Rev -, APU System Block Schematic

Coast Guard Drawing 45 RB-M 311-004, Rev A, APU Generator Drive System

Coast Guard Drawing 45 RBM 311-004, Rev A, APU Generator Drive System

Coast Guard Drawing 45 RB-M 320-001, Rev E, DC Power Distribution System Schematic v (Rev-0)

Coast Guard Drawing 45 RB-M 330-002, Rev B, Lighting System Schematic

Coast Guard Drawing 45 RB-M 406-001, Rev A, Grounding and Bonding Schematic

Coast Guard Drawing 45 RB-M 423-001, Rev B, Electronic Navigation System Schematic

Coast Guard Drawing 45 RB-M 439-002, Rev -, C.C.T.V. System

Coast Guard Drawing 45 RB-M 441-001, Rev G, Radio System Schematic

Coast Guard Drawing 45 RB-M 505-001, Rev A, Hose and Hose Assemblies

Coast Guard Drawing 45 RB-M 581-001, Rev A, Anchoring Handling and Stowage System

Coast Guard Drawing 45 RB-M 582-002, Rev -, Mooring and Towing System

Coast Guard Drawing 45 RB-M 601-001, Rev D, General Arrangement

Coast Guard Drawing 45 RB-M 622-002, Rev -, Machinery Space Removable Deck Plate

Coast Guard Drawing 45 RB-M 625-002, Rev -, Window and Fixed Portlight

Coast Guard Drawing 45 RB-M 631-001, Rev A, Painting Layout

Coast Guard Drawing 45 RB-M 633-002, Rev -, Cathodic Protection Sacrificial Anode

Coast Guard Drawing 45 RB-M 634-002, Rev -, Deck Covering

Coast Guard Drawing 45 RB-M 635-002, Rev C, Insulation Details

Coast Guard Drawing FL-85-002, Rev D, GFE Boat Hot Work Diagrams

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual

Coast Guard Technical Publication (TP) 4698, SWBS 241, Dec 2013, Marine Transmission Manual

Coast Guard Technical Publication (TP) 4993, SWBS 634, Oct 2011, Nonskid Pads, Peel and Stick Catalog

Coast Guard Technical Publication (TP) 5716, SWBS 163, Apr 2014, Seawater Cooling System Duplex Strainer - Model RBM-203976

Coast Guard Technical Publication (TP) 5718, April 2014, Manufacture’s Instruction Book, SWBS 167, Section A, Doors, Hatches and Windows

Coast Guard Technical Publication (TP) 5727, SWBS 233, Jun 2015, Main Diesel Engine (MDE) – Series 60- General Overhaul

Coast Guard Technical Publication (TP) 5737, SWBS 247, Jun 2014, Water Jet – Model FF375S

Fire Prevention and Response

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems

Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures vi (Rev-0)

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2022, Drydocking

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2022, Temporary Services

OTHER REFERENCES

1), 2015, Solvent Cleaning

2), 2004, Mechanical Tool Cleaning

45 RB-M Water Jet Disassembly / Assembly Procedures

American Society of Mechanical Engineers (ASME) B16.34, 2025, Valves-Flanged, Threaded, and Welding End

ASTM International (ASTM) D4138, Rev A, 2007 (R 2017), Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means

ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates

ASTM International (ASTM) F992, 2022, Standard Specification for Valve Label Plates

Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2022, Occupational Safety and Health Standards for Shipyard Employment

Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2019 Edition, Pressure Testing of Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2022 Edition, Butterfly Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service

Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2019 Edition, Bronze Gate, Globe, Angle and Check Valves

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

Rolls-Royce Kamewa Water Jet Assembly Drawing 376 000 49

Standard Practice for Commercial Packaging, ASTM D-3951, Rev-18, Mar 2018.

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2015, Solvent Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 2 (SSPC-SP

The Society for Protective Coatings (SSPC), 2015 (E 2017), Paint Application Specification No. 2 (PA- 2), Procedure for Determining Conformance to Dry Coating Thickness Requirements

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-WJ-2/NACE WJ-2, 2012 Water Jet Cleaning of Metals-Very Thorough Cleaning vii (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

6 N Gasket (Manhole Cover) NSN: 5330-01-134-1986

PN: 3560BN

4 ea. 16.98

8 N Isolator, Engine Mount NSN: 2990016309011 or

PN: 23525490

8 ea. 342.09

8 N Filter Element, Fluid NSN: 4330015403412 or

PN: 01030

4 ea. 30.64

8 N Filter Element, Fluid NSN: 2910010228183 or

PN: 23530707

2 ea. 11.34

10 N Stainless Steel Ball Joint NSN: 3040016152117 or

PN: 59915K483

10 ea. 12.26

10 N Stainless Steel Threaded Rod

NSN: 5306016152224 or

PN: 93250A140

1 ea. 10.67

10 N Bearing Bushing NSN: 3120014555212 or

PN: 10106911

4 ea. 9.80

10 N Bearing Bushing NSN: 3120580006242 or

PN: 36M05101

4 ea. 49.00

10 N **Socket Head Screw NSN: 5305016171580 or

PN: 91210050

16 ea. 2.71

10 N **Bolt Kit NSN: 2815016171688 or

PN: 93112085A

2 ea. 15.64

10 N **Key NSN: 5315016166360 or

PN: 10100824

3 ea. 28.14

10 N Seal NSN: 5330580006238 or

PN: 10118902

2 ea. 4.35

10 N Bushing NSN: 3120580006239 or

PN: 10105511

2 ea. 48.19

10 N Bearing Bushing NSN: 3120014555272 or

PN: 10105111

4 ea. 35.33

10 N **Bolt Kit NSN: 2815016171974 or

PN: 93112080F

2 ea. 6.13

10 N **Bolt Kit NSN: 5340016167191 or

PN: 93112065K

12 ea. 13.07

10 N Bearing Unit NSN: 3110016166342 or

PN: 37506201

2 ea. 614.35

10 N Bushing NSN: 3120580006240 or

PN: 10106011

4 ea. 47.21

10 N **Set Screw NSN: 5305016020672 or

PN: 91608012

6 ea. 0.58

10 N **Bolt Kit NSN: 5305016173161 or

PN: 93112090K

10 ea. 12.56

10 N O-ring NSN: 5331580006241 or

PN: 10202606

6 ea. 14.56 viii (Rev-0)

10 N **Mechanical Sealing NSN: 4320580006403 or

PN: 10203870

2 ea. 1052.97

10 N Bolt Kit NSN: 5306016164058 or

PN: 93310030E

6 ea. 1.92

10 N O-ring NSN: 5331016020679 or

PN: 10202631

2 ea. 4.39

10 N O-ring NSN: 5331016020680 or

PN: 10202625

4 ea. 15.15

10 N Sealing NSN: 5365016233174 or

PN: 41018801

2 ea. 8.87

10 N O-ring NSN: 5331016200368 or

PN: 10202611

2 ea. 5.21

10 N Seal Lip NSN: 4730016204613 or

PN: 10202590

4 ea. 39.47

10 N Sealing NSN: 5330016163186 or

PN: 45002010

2 ea. 535.93

10 N **Lock Nut NSN: 5310016162982 or

PN: 10202908

2 ea. 16.63

10 N Lock Washer NSN: 5310016232756 or

PN: 10203008

2 ea. 2.34

10 N **Ring Nut NSN: 5310016164016 or

PN: 10202912

2 ea. 32.60

10 N Seal NSN: 5330016243735 or

PN: 10202540R

6 ea. 19.68

10 N **Screw NSN: 5305016162955 or

PN: 93305025

8 ea. 0.28

10 N **Washer NSN: 5310016162966 or

PN: 912505

8 ea. 0.06

10 N Gasket NSN: 5330016232867 or

PN: 37527805

2 ea. 63.43

10 N Bushing NSN: 5365016202680 or

PN: 10108416

8 ea. 15.91

10 N **Bolt Kit NSN: 5305016242899 or

PN: 93110060A

4 ea. 12.91

10 N **Bolt Kit NSN: 5305016242922 or

PN: 99110040G

14 ea. 6.60

10 N Bushing NSN: 3120014555268 or

PN: 10106902

8 ea. 7.90

10 N Gasket NSN: 5330016163014 or

PN: 10108901

2 ea. 5.65

10 N **Bolt Kit NSN: 5305016231019 or

PN: 93110090A

4 ea. 5.05

10 N Lock Washer NSN: 5310016232699 or

PN: 10203012

2 ea. 5.62

10 N O-ring NSN: 5331016242120 or

PN: 10202603

2 ea. 3.89

10 N **Screw, Countersunk NSN: 5305016309734 or

PN: 99106016

8 ea. 5.65

10 N Seal/Gasket NSN: 1040016337691 or 2 ea. 57.64 ix (Rev-0)

PN: 45011611

10 N Woodruff Key NSN: 5315016172999 or

PN: 10100823

2 ea. 19.09

10 N Washer, Sealing NSN: 5310016452084 or

PN: 8755000050

24 ea. 0.06

10 N Screw, Connection NSN: 5305016476396 or

PN: 91212045L

16 ea. 6.45

11 N Anode, Inspection Hatch (Port & Stbd) (Anode, Corrosion Preventive)

NSN: 5342-58-000-3759 or

PN: 10108231

2 ea. 71.89

11 N Transom Anode (Anode, Corrosion Preventive)

NSN: 5342-01-602-0658 or

PN: 10108230

4 ea. 234.75

11 N Tunnel Anode (Anode, Corrosion Preventive)

NSN: 5342-01-602-0668 or

PN: 10108220

4 ea. 40.25

11 N Impeller Housing/Bucket/Interceptor Anode (Anode, Corrosion

Preventive)

NSN: 5342-25-146-5438 or

PN: 10107701

10 ea. 16.22

11 N Guide Vane Chamber Anode (Anode, Corrosion

Preventive)

NSN: 5342-01-602-0669 or

PN: 37517411

2 ea. 207.27

11 N Anode, Anode Hatch (Anode, Corrosion

Preventive)

NSN: 5342-25-146-5439 or

PN: 10108210

2 ea. 60.15

11 N Screw Connection (Screw, Cap, Socket Head)

NSN: 5305-01-602-2100 or

PN: 93310025H

4 ea. 4.53

11 N Screw Connection NSN: 5305-01-627-5854 or

PN: 93308025H

14 ea. 1.00

11 N Screw Connection (Screw, Cap, Socket Head)

NSN:5305-01-602-2105 or

PN: 91206020E

8 ea. 1.47

11 N Screw Connection (Bolt Assembly, Clamp)

NSN: 5340-01-624-3271 or

PN: 93308025E

8 ea. .73

11 N O-ring NSN: 5331-01-602-0670 or

PN: 10202639

2 ea. 15.46

11 N Screw Connection NSN: 5305-01-624-0905 or

PN: 93310016E

8 ea. 1.17

11 N Screw Connection (Bolt Blank)

NSN: 5306-01-630-9800 or

PN: 93312030E

2 ea. 2.09

11 N Screw Connection NSN: 5305-01-620-4602 or

PN: 91212025E

8 ea. 1.41

11 N O-ring NSN: 5331-22-607-8691 or

PN: 10202626

2 ea. 9.26

11 N Tube Extension NSN: 4730-01-621-0708 or

PN: 37610802

2 ea. 120.22

11 N Tube Clamp (Clamp, Hose) NSN: 4730-01-620-0951 or

PN: 10217881

2 ea. 16.13

11 N Screw Connection (Screw, Cap, Socket Head)

NSN: 5305-01-602-2101 or

PN: 93310030H

2 ea. 3.40

11 N Connecting Cable NSN: 6145-01-620-3663 or 4 ea. 19.00 x (Rev-0)

PN: 10234301

11 N Screw Connection NSN: 5305-01-617-6732 or

PN: 93306016E

8 ea. 0.35

11 N Anode, Corrosion Preventive

NSN: 5340-01-589-9440 or

PN: 51125

2 ea. 82.13

11 N Anode, Corrosion Preventive

NSN: 5340-01-589-9425 or

PN: 89287

2 ea. 26.86

13 N Mount Vibration Isolator (Mount Resilient General

Purpose)

NSN: 5340-01-645-0607 or

PN: RB1-200

4 ea. 20.76

13 N Mount, Vibration Snubbing Washer (Washer Flat)

NSN: 5310-01-626-2423 or

PN: 148099-1

4 ea. 1 .90

13 N Gasket (Exhaust Flange Outlet)

NSN: 5330-01-303-5437 or

PN: 23501147

2 ea. 17.24

15 N Parts Kit, Hose Assembly NSN: 4720-01-679-1782 or

P/N: 45-RB-M-505-101

1 ea. $16,520.00

18 N Raw Water Sys De-Icing Valve, Ball, 1-inch NPT

316 SS

NSN: 4820-01-600-0385 or

PN: V210FP-16

2 ea. 70.39

18 N AC Supply/Discharge Ball Valve, Ball 3/4-inch NPT

316 SS

NSN: 4820-01-600-0389 or

PN: V210FP-12

3 ea. 50.89

18 N AC Overboard Check Valve High-Flow SS

Check Valve 3/4-inch NPT Female

NSN: 4820-01-599-7249 or

PN: 46635K65

1 ea. 97.27

23 N 45 FT RBM Whole Kit Contents of kit include box

1 through box 8. (Round and square hatches not included) (Tread, Nonmetallic, Nonskid)

NSN: 7220-01-615-5012 or

P/N: 2040-00-NIB-0707

1 kt. 6,733.18

23 N Non-Skid 45 FT RBM - Round and Square Hatches

- (Not included in main kit)

(Non-Skid Kit #9)

NSN: 2040-01-633-4911 or

P/N: 2040-00-NIB-0707J

1 kt. 139.47

31 N Repair Kit, Fender NSN: 2090-01-589-9430 or

PN: RBM-SRK

1 ea. 411.82

32 N Fender, Marine (PC# 13) (3 Port and 3 Starboard)

NSN: 2040-01-612-5132 or

PN: 205064

2 ea. 1,160.00

32 N Fender, Marine (PC# 15) NSN: 2040-01-612-5215 or

PN: 207579

1 ea. 1,723.00

33 N Gasket NSN: 5330-01-481-6087 or

PN: 23522279

2 ea. 48.52

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xi (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item

Title

2 Ultrasonic Testing (UT) (100) Shots, Perform

4 Fendering System, Inspect

5 Accessible Spaces, Inspect

9 Main Diesel Engine(s) To MEPS Generator(s) And Jet Drive(s), Align

10 Water Jet-Inspect, Perform Service

13 Engine Exhaust Piping, Inspect

20 Fender Faying Surfaces, Preserve, 100 percent

21 Water Jet Drive, Preserve

22 U/W Body, Preserve (100%)

29 Lazarette Bilge, Preserve xii (Rev-0)

PRINCIPAL CHARACTERISTICS

45' RB-M

PHYSICAL

Length overall 44 feet, 10.5 inches Unfixed height 20 feet 9 inches Beam, maximum 14 feet, 7.75 inches Full load draft 3 feet, 4 inches Full load displacement 36,500 pounds Max sustained speed 42.5 knots Range 250 nautical miles at 30 knots Mission limits 8 foot seas / 30 knot winds Survivability limits 12 foot seas / 50 knot winds

HULL

Hull manufacturer Marinette Marine Corp.

5086 (GRADE) Aluminum Hin- 2009

MACHINERY

Type 6, cylinder diesel engine Number of units 2, MTU's 60 series 825 hp Propulsion type 2, Rolls-royce water-jet

TANKS

1 (Rev-0)

00000_0725_FLT

REC_00000_FLT_Boats @ Commercial Facility (0121)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting boat repairs performed at a commercial contractor’s facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Fire Prevention and Response

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for Shipyard Employment

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

2 (Rev-0)

3. REQUIREMENTS

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

NOTE

NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents.

Contractors can apply to NAVSEA headquarters directly for copies.

3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.

3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.

3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).

3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.

3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.

Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:

ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.

ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.

3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.

For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).

3 (Rev-0)

3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;

for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:

SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.

SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5-inch diameter circle defining the spot.

3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

NOTE

NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Strenx 900 are considered the same as those for welding HY-130.

3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 Contractor operated (non USCG) facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.

3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;

ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous

4 (Rev-0)

Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.

3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).

3.6.1 Coast Guard turn-over preparation. The Contractor must be aware that, upon arrival, after haul out, and prior to departing the Contractor’s facility, the Coast Guard crew must be allowed to accomplish various tasks in preparation for the turn-over of the boat to the Contractor. The following conditions apply to this paragraph:

3.6.1.1 The Coast Guard requires a maximum of three days at the beginning of the contract, and three days at the end to accomplish various tasks.

3.6.1.2 The Contractor may commence/continue work during these time frames.

3.6.1.3 Coast Guard personnel will remove the transducers after initial haul-out and reinstall prior to re-floating the vessel.

3.6.1.4 The Unit will contact the servicing ESD or ESU to setup removal/installation of the transducer if Unit personnel are unable to accomplish this task.

3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications will appear here.

3.7.1 SFLC Standard Specification 5550: Replace paragraph 3.11.3 to state, “Material supporting imminent work shall be brought on the cutter and stored where the work is being performed. Material that appreciably contributes to fire load shall be removed at the end of each work shift when personnel are not present. Trash, debris, and packaging materials shall be promptly removed from the vessel at the end of each work shift and not allowed to accumulate.” Advance the paragraph numbering of the Fire Prevention and Safety Inspection form to 3.11.4.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

5 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE / TIME

NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME

6 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

VESSEL NAME HULL #

WORK ITEM

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

7 (Rev-0)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

VESSEL NAME HULL # WORK ITEM

LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/AMPP No. 2

SSPC-SP WJ-2/AMPP WJ-2

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS

PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS

DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE /

TIME

8 (Rev-0)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/AMPP No. 2

SSPC-SP WJ-2/AMPP WJ-2

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA

RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO

SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):

Mean Reading (mils)

9 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

VESSEL NAME HULL # WORK ITEM

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

10 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

VESSEL NAME HULL #

WORK ITEM

COATING MFG PRODUCT NAME

BATC

H #

INDUCTI

ON TIME

COATING SYSTEM

SEQUENCE

(PRIMER/TOUCHUP/3RD

COAT, ETC.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.

SPOT 1 2 3 4 5

AVERAGE

VALUE

*BASE METAL READING

(BMR)

*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

APPLICATION METHOD (AIRLESS,

CONVENTIONAL SPRAY, ROLLED)

AVERAGE DFT

11 (Rev-0)

4.2 Tank and Void Assessment form.

12 (Rev-0)

13 (Rev-0)

07400_AKP_0925_BOAT_FLT

WORK ITEM 1: General Welding, Provide

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to provide general welding as identified in Table 1 (Welding).

TABLE 1 – WELDING

ITEM DESCRIPTION LOCATION APPROXIMATE

SQFT.

PHOTO ID

Perform Clad Welding Pilothouse Deck at COR’s Discretion 25 Square Inches N/A

Perform Clad Welding Underneath P/S Strainers in the Bilge 16 Square Feet N/A

Repair Bitt Caps Bent Line Handling/Mooring Bitts 02 Each in Total Photos # 1 & # 2

Perform Sand & Polish All Line Handling/Mooring Bitts 10 Each in Total Example Photo # 3

Clean/Resurface/Inspect Engineroom Hatch Hinges 08 Each in Total Example Photo # 4

Detail and Clean Threads Main Diesel Engine Mounts 08 in Total Example Photo # 5

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing FL-85-002, Rev D, GFE Boat Hot Work Diagrams

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

14 (Rev-0)

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

None.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Requirement. The Contractor must provide general welding, including but not limited to, fabrication, brazing, inspection, plate renewal, crack repair, overlay, and associated processes on Coast Guard vessels and equipment in accordance with Coast Guard Drawing FL-85-002 and SFLC Std Spec 0740.

3.3 Bidding. The Contractor must ensure for bidding purposes this specification will be broke down by the following:

One linear foot of welding/brazing.

Four square inches of clad/overlay welding.

One hour of fabrication.

One square foot of plate renewal.

TABLE 2 – PLATE TYPE

STEEL PLATE ALUMINUM PLATE

THICKNESS WEIGHT

PER SQFT.

TYPE/GRADE THICKNESS WEIGHT

PER SQFT

TYPE/ALLOY

3/16 (.1875) 7.66 lb 1/4 (.250) 10.21 lb 1/4 (.250) 3.53 lb 5/16 (.3125) 12.76 lb 5/16 (.3125) 4.41 lb 3/8 (.375) 15.31 lb 3/8 (.375) 5.29 lb 1/2 (.500) 20.42 lb 1/2 (.500) 7.06 lb

3.4 Touch-up preservation, general. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)

15 (Rev-0)

4. NOTES

This section is not applicable to this work item.

Photo #1

Photo #2

16 (Rev-0)

Photo #3

Photo #4

Photo #5

17 (Rev-0)

10000_AKP_0925_45RBM

WORK ITEM 2: Ultrasonic Testing (UT) (100) Shots, Perform

1. Scope

1.1 Intent. This work item describes the requirements for the Contractor to take 100 UT shots.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):

3.3 Reporting

3.1.2 Tech Rep.

None.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

18 (Rev-0)

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2 UT measurement. The Contractor must perform a total of 100 UT measurements in accordance with SFLC Std Spec 0000 and SFLC Std Spec 0740.

3.2.1 Standard measurements. The Contractor must take 70 standard thickness measurements for the designated locations numbered 1 thru 70 between the boot top and keel, (Refer to Figure 1 and Figure 2).

3.2.1.1 The Contractor must record each measured metal thickness in the Standard Underwater (U/W) Body Test Results Report, (Refer to Table 1 and Table 2).

3.2.1.2 The Contractor must calculate each percent loss.

3.2.1.3 The Contractor must record each percent loss in the Standard U/W Body Test Results Report.

3.2.2 Additional measurements. The Contractor must take 30 additional thickness measurements at locations designated by the Coast Guard inspector and numbered 1A through 30A between the boot top and keel, (Refer to Figure 1 and Figure 2).

3.2.2.1 The Contractor must record each measured metal thickness in the Additional U/W Body Test Results Report, (Refer to Table 3).

3.2.2.2 The Contractor must calculate each percent loss.

3.2.2.3 The Contractor must record each percent loss in the Additional U/W Body Test Results Report.

3.2.3 Minimum thickness. The Contractor must record the minimum thickness found for each designated hull section. (A, B, and C) in the Underwater Hull Body Minimum Thickness Test Results Report, (Refer to Table 4).

3.3 Reporting. The Contractor must submit a CIR to include a marked up drawing of Figure 1 and 2 and the completed tables.

4.1 Coast Guard Personnel. The Coast Guard inspector will witness all readings.

19 (Rev-0)

FIGURE 1. BOTTOM SHELL PLATING EXPANDED

20 (Rev-0)

FIGURE 2. STERN SECTION SHELL PLATING

TABLE 1 - STANDARD U/W BODY TEST RESULTS REPORT

DATE: ____________________________

*CALCULATING PERCENT LOSS = 100- (UT READING / DESIGN THICKNESS X 100)

21 (Rev-0)

22 (Rev-0)

TABLE 2 - STANDARD U/W BODY TEST RESULTS REPORT (STERN)

*CALCULATING PERCENT LOSS = 100- (UT READING / DESIGN THICKNESS X 100)

LOCATION

AREA

DESIGN

THICKNESS

MINIMUM

ALLOWABLE THICKNESS

UT

READINGS

*PERCENT LOSS

STERN SECTION “C”

61 .250 .187 62 .250 .187 63 .250 .187

STERN SECTION “B”

64 .250 .187 65 .250 .187 66 .250 .187 67 .250 .187

STERN SECTION “A”

68 .250 .187 69 .250 .187 70 .250 .187

23 (Rev-0)

TABLE 3 - ADDITIONAL U/W BODY TEST RESULTS REPORT

*CALCULATING PERCENT LOSS = 100- (UT READING / DESIGN THICKNESS X 100)

LOCATION AREA DESIGN

THICKNESS

MINIMUM

ALLOWED

THICKNESS

UT READING *PERCENT LOSS

PORT SIDE AREAS “A, B, C”

1A .250 .187 2A .250 .187 3A .250 .187 4A .250 .187 5A .250 .187 6A .250 .187 7A .250 .187 8A .250 .187 9A .250 .187

10A .250 .187 11A .250 .187 12A .250 .187

STARBOARD SIDE AREAS “A, B, C”

13A .250 .187 14A .250 .187 15A .250 .187 16A .250 .187 17A .250 .187 19A .250 .187 20A .250 .187 21A .250 .187 22A .250 .187 23A .250 .187 24A .250 .187

STERN AREAS “A, B, C”

25A .250 .187 26A .250 .187 27A .250 .187 28A .250 .187 29A .250 .187 30A .250 .187

24 (Rev-0)

TABLE 4 - UNDERWATER HULL BODY MINIMUM THICKNESS TEST RESULTS REPORT

DATE: ______________________

LOCATIONS MIN. THICKNESS FOUND DESIGN

THICKNESS

MINIMUM

ALLOWED

THICKNESS

AT 25%

LOSS

MINIMUM

ALLOWED

THICKNESS

AT 50%

LOSS

(A) (B) (C)

Port Hull: Boot Top to Keel

.250 .187 .125

STBD Hull: Boot Top to Keel

Stern Hull: Boot Top to Keel

Comments:

25 (Rev-0)

11000_AKP_0925_45RBM

WORK ITEM 3: Hull Plating (U/W Body), Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect/survey the vessel’s Under Water (U/W) hull plating, including U/W appendages and coating system.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 45 RB-M 084-002, Rev -, Docking Plan

Coast Guard Drawing 45 RB-M 110-001, Rev -, Hull Structure

Coast Guard Drawing 45 RB-M 631-001, Rev A, Painting Layout

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

OTHER REFERENCES

ASTM International (ASTM) D4138, Rev A, 2007 (R 2017), Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means

The Society for Protective Coatings (SSPC), 2015 (E 2017), Paint Application Specification No.

2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

3.1.2 Tech Rep.

26 (Rev-0)

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Inspection. The Contractor must accompany the Underwater Hull Inspection Board (UWHIB) in the performance of the below inspection tasks, as applicable, using Coast Guard Drawings 45 RB-M 084- 002, 45 RB-M 110-001, 45 RB-M 631-001, and SFLC Std Spec 0000 as guidance. The Contractor must provide the following, to facilitate the UWHIB in assessing the condition of the designated U/W hull components and systems:

A hull repair supervisor and a marker.

Temporary staging and other necessary equipment, as applicable, for ensuring safe access to all areas of the U/W hull.

NOTES

1. The COR will convene the UWHIB as soon as possible after the vessel has been dry-docked and before any work (except U/W hull cleaning/wash down) is performed on the U/W hull and appendages.

2. Some of the components and/or systems addressed in this work item may not be applicable to all vessel classes.

3.2.1 Hull plating.

3.2.1.1 The Contractor must inspect the condition of the hull plating (including thruster tunnel plating, as applicable), for the presence of marine growth, deformation, and any evidence of major corrosion or electrolytic action.

3.2.1.2 The Contractor must inspect the hull and keel areas, report on the condition of butt-welded seams, doubler plates, lap seams, and for any signs of damaged plating or unusual waviness in the plating.

3.2.2 Sea chests and all other cooling system intake components. The Contractor must inspect all sea chests, tunnels, hull openings, and grates for general appearance, loose, damaged, or missing grates, loose or missing fasteners, condition of sea strainers and lockwire on bolts, marine growth on grating slots, and any obstructions in the openings that might prevent proper suction and discharge of water.

3.2.3 Water jet drive. The Contractor must inspect the water jet drive assembly for signs of corrosion, pitting, erosion, fouling, cracks, dings, and nicks. Inspect all linkages for any missing fasteners, physical damage, pitting, or other conditions effecting usage.

3.2.4 Transducers. The Contractor must check general condition of the transducers for cuts, cracks, corrosion, and surface defects around the openings. Check transducer securing nuts for tightness and inspect cables for chafing and other damage.

3.2.6 Zinc anodes.

27 (Rev-0)

3.2.6.1 The Contractor must remove all marine growth and oxide coating from all hull, rudder, shaft…