DRAFT SOLICITATION - Huachuca Training and Support Contract (HTASC)

Closed Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest pre-solicitation from .

Solicitation number
W900KK-17-R-0014
Agency
ACC Orlando Army Contracting Command, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
611430 Professional and Management Development Training
PSC
Not on record
Place of performance
Fort Huachuca, AZ, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks to award an indefinite delivery, indefinite quantity contract for training support services at various Army locations including Fort Huachuca, Davis Monthan Air Force Base, Goodfellow Air Force Base, and Corry Naval Station. The Department of the Army Materiel Command Contracting Command Orlando Contracting Center will acquire services including instruction support, training development, program management, and contractor manpower reporting. An updated performance work statement was made available for industry review in November 2016, with responses due. The final solicitation is scheduled for release in January 2017 and proposals will be evaluated based on technical and price factors. The target contract award date is March 2018.

There is no set-aside designation. The primary NAICS code is 611430 and PSC code is R425. The total contract ceiling amount is $785 million over a potential seven-year ordering period under indefinite delivery task orders. The minimum task order amount is unspecified. The incumbent is the Warfighter Field Operations Customer Support contractor. The period of performance is a one-year base period starting in March 2018 followed by up to seven one-year option periods extending to June 2025. The place of performance is Fort Huachuca in Arizona.

Notice text

11 versions

Update #11 · Latest ·

Added: Oct 17, 2016 10:44 am Modified: Jul 18, 2017 2:30 pmTrack Changes

UPDATE - 18 July 2017:

The Government has posted (to FBO.gov) the formal Pre-Solicitation Notice (IAW FAR 5.204) under HTASC number W900KK-17-R-0014.

UPDATE - 06 July 2017:

This update is provided to answer the questions received from industry relating to Draft Solicitation, Factor 2, Small Business Participation; see attachment to this Special Notice (HTASC_draftSolicitation_QA_REV1_06Jul17).

The Key PALT Milestones posted in the 26 April 2017 update (below) are still accurate.

UPDATE - 21 June 2017:

This update is provided to answer the questions received from industry regarding the Draft Solicitation; see attachment to this Special Notice (HTASC_draftSolicitation_QA_21Jun17).

The Key PALT Milestones posted in the 26 April 2017 update (below) are still accurate.

UPDATE - 22 May 2017:

This update serves as the DRAFT SOLICITATION for HTASC.

Potential offerors (and teammates) are encouraged to provide questions, comments, and suggestions relating to the Draft Solicitation and all attachments. Questions received will be consolidated, answered, and (if deemed valuable information for all interested parties) will be posted at a later date as an update to this Special Notice.  The Government will not disclose the identity of the potential offeror (or teammate) asking the questions.

Questions, comments, and suggestions ("responses") relating to the Draft Solicitation ARE DUE no later than: Wednesday, 07 JUNE 2017, 08:00AM EDT.

Please submit all responses to the following email inbox (the size limitation is 20MB) with email subject as "HTASC Draft Solicitation Response":

usarmy.orlando.peo-stri.mbx.htasc@mail.mil

Please mark submitted proprietary information/data accordingly.  Cover page (or within email, if applicable) of response shall include: Contractor name, address, point of contact information, DUNS, CAGE, and small business information, if applicable (including reference to NAICS 611430).


Even if your firm DOES NOT submit a "response" related to the Draft Solicitation, please answer the following question and submit to the email inbox; "responses" should also include an answer to the following question:

Do you intend to submit an offer (as the prime contractor) in response to a Final HTASC Solicitation?

THIS IS NOT A FORMAL SOLICITATION AND ALL DOCUMENTS PROVIDED BY THE GOVERNMENT ARE DRAFT.

The Key PALT milestones provided 26 April 2017 are still accurate.  We look forward to hearing from you and thank you for your interest and support of this upcoming acquisition.

UPDATE - 26 April 2017:

ACC-ORL received and accepted an actionable/finalized Requirements Package in April 2017; Procurement Administrative Lead Time (PALT) also began in April 2017. Key PALT milestones for HTASC:

Draft Solicitation expected: May 2017.
Final Solicitation expected: September 2017 (Final Solicitation issue date is dependent on Army Senior Services Manager and Army Senior Procurement Executive reviews).
Award expected: 3rd Quarter Government Fiscal Year 2018.

UPDATE - 16 March 2017:

Draft Acquisition Strategy: Single Award, Indefinite Delivery Indefinite Quantity (IDIQ) contract, based off of a Subjective Tradeoff source selection (see FAR 15.101-1 and DoD Source Selection Procedures section 1.3.1, specifically, 1.3.1.3), full and open competition (see FAR 6.1). Small Business participation requirement: 30%.

Note - Acquisition Strategy approved locally (final approval pending higher headquarters' review in accordance with regulation and policy).


UPDATE - 13 March 2017:

Expected Timelines:

ACC-ORL receipt of Finalized Requirements Package changed from 2QFY17 (end of January) to 2QFY17 (end of March).
Draft Solicitation changed from 2QFY17 (March) to 3QFY17 (April).
No change to Final Solicitation: 3QFY17 (June).
No change to Customer Target Award: 2QFY18 (March).

UPDATE - 19 December 2016:

Expected Timelines:

ACC-ORL receipt of Finalized Requirements Package changed from 1QFY17 (mid December) to 2QFY17 (end of January).
Draft Solicitation changed from 2QFY17 (January) to 2QFY17 (March).
Final Solicitation changed from 3QFY17 (May) to 3QFY17 (June).
No change to Customer Target Award: 2QFY18 (March).

UPDATE - 07 December 2016:

A Sources Sought Notice (SSN) has been posted under the HTASC Solicitation reference number W900KK-17-R-0014.  This Special Notice will continue to be used for general information relating to HTASC.

ORIGINAL:

For all communication, please email the HTASC mailbox: usarmy.orlando.peo-stri.mbx.htasc@mail.mil

Expected timelines:

In November 2016, the Government intends to post an updated, draft Performance Work Statement (PWS) for industry review/questions/comments.
Draft Solicitation changed from 1QFY17 (October) to 2QFY17 (January).
Final Solicitation changed from 2QFY17 (March) to 3QFY17 (May).
Customer Target Award changed from 2QFY18 (January) to 2QFY18 (March).

NOTE: THIS NOTICE IS ASSOCIATED WITH PREVIOUS NOTICES:

W900KK-17-R-0014 - SOURCES SOUGHT
W900KK-16-R-0023 - SOURCES SOUGHT
W900KKHTASC - SPECIAL NOTICE/REQUEST FOR INFORMATION

Update #10 ·

Added: Oct 17, 2016 10:44 am Modified: Jul 06, 2017 6:46 pmTrack Changes

UPDATE - 06 July 2017:

This update is provided to answer the questions received from industry relating to Draft Solicitation, Factor 2, Small Business Participation; see attachment to this Special Notice (HTASC_draftSolicitation_QA_REV1_06Jul17).

The Key PALT Milestones posted in the 26 April 2017 update (below) are still accurate.

UPDATE - 21 June 2017:

This update is provided to answer the questions received from industry regarding the Draft Solicitation; see attachment to this Special Notice (HTASC_draftSolicitation_QA_21Jun17).

The Key PALT Milestones posted in the 26 April 2017 update (below) are still accurate.

UPDATE - 22 May 2017:

This update serves as the DRAFT SOLICITATION for HTASC.

Potential offerors (and teammates) are encouraged to provide questions, comments, and suggestions relating to the Draft Solicitation and all attachments. Questions received will be consolidated, answered, and (if deemed valuable information for all interested parties) will be posted at a later date as an update to this Special Notice.  The Government will not disclose the identity of the potential offeror (or teammate) asking the questions.

Questions, comments, and suggestions ("responses") relating to the Draft Solicitation ARE DUE no later than: Wednesday, 07 JUNE 2017, 08:00AM EDT.

Please submit all responses to the following email inbox (the size limitation is 20MB) with email subject as "HTASC Draft Solicitation Response":

usarmy.orlando.peo-stri.mbx.htasc@mail.mil

Please mark submitted proprietary information/data accordingly.  Cover page (or within email, if applicable) of response shall include: Contractor name, address, point of contact information, DUNS, CAGE, and small business information, if applicable (including reference to NAICS 611430).


Even if your firm DOES NOT submit a "response" related to the Draft Solicitation, please answer the following question and submit to the email inbox; "responses" should also include an answer to the following question:

Do you intend to submit an offer (as the prime contractor) in response to a Final HTASC Solicitation?

THIS IS NOT A FORMAL SOLICITATION AND ALL DOCUMENTS PROVIDED BY THE GOVERNMENT ARE DRAFT.

The Key PALT milestones provided 26 April 2017 are still accurate.  We look forward to hearing from you and thank you for your interest and support of this upcoming acquisition.

UPDATE - 26 April 2017:

ACC-ORL received and accepted an actionable/finalized Requirements Package in April 2017; Procurement Administrative Lead Time (PALT) also began in April 2017. Key PALT milestones for HTASC:

Draft Solicitation expected: May 2017.
Final Solicitation expected: September 2017 (Final Solicitation issue date is dependent on Army Senior Services Manager and Army Senior Procurement Executive reviews).
Award expected: 3rd Quarter Government Fiscal Year 2018.

UPDATE - 16 March 2017:

Draft Acquisition Strategy: Single Award, Indefinite Delivery Indefinite Quantity (IDIQ) contract, based off of a Subjective Tradeoff source selection (see FAR 15.101-1 and DoD Source Selection Procedures section 1.3.1, specifically, 1.3.1.3), full and open competition (see FAR 6.1). Small Business participation requirement: 30%.

Note - Acquisition Strategy approved locally (final approval pending higher headquarters' review in accordance with regulation and policy).


UPDATE - 13 March 2017:

Expected Timelines:

ACC-ORL receipt of Finalized Requirements Package changed from 2QFY17 (end of January) to 2QFY17 (end of March).
Draft Solicitation changed from 2QFY17 (March) to 3QFY17 (April).
No change to Final Solicitation: 3QFY17 (June).
No change to Customer Target Award: 2QFY18 (March).

UPDATE - 19 December 2016:

Expected Timelines:

ACC-ORL receipt of Finalized Requirements Package changed from 1QFY17 (mid December) to 2QFY17 (end of January).
Draft Solicitation changed from 2QFY17 (January) to 2QFY17 (March).
Final Solicitation changed from 3QFY17 (May) to 3QFY17 (June).
No change to Customer Target Award: 2QFY18 (March).

UPDATE - 07 December 2016:

A Sources Sought Notice (SSN) has been posted under the HTASC Solicitation reference number W900KK-17-R-0014.  This Special Notice will continue to be used for general information relating to HTASC.

ORIGINAL:

For all communication, please email the HTASC mailbox: usarmy.orlando.peo-stri.mbx.htasc@mail.mil

Expected timelines:

In November 2016, the Government intends to post an updated, draft Performance Work Statement (PWS) for industry review/questions/comments.
Draft Solicitation changed from 1QFY17 (October) to 2QFY17 (January).
Final Solicitation changed from 2QFY17 (March) to 3QFY17 (May).
Customer Target Award changed from 2QFY18 (January) to 2QFY18 (March).

NOTE: THIS NOTICE IS ASSOCIATED WITH PREVIOUS NOTICES:

W900KK-17-R-0014 - SOURCES SOUGHT
W900KK-16-R-0023 - SOURCES SOUGHT
W900KKHTASC - SPECIAL NOTICE/REQUEST FOR INFORMATION

Update #9 ·

Added: Oct 17, 2016 10:44 am Modified: Jun 21, 2017 4:33 pmTrack Changes

UPDATE - 21 June 2017:

This update is provided to answer the questions received from industry regarding the Draft Solicitation; see attachment to this Special Notice (HTASC_draftSolicitation_QA_21Jun17).

The Key PALT Milestones posted in the 26 April 2017 update (below) are still accurate.

UPDATE - 22 May 2017:

This update serves as the DRAFT SOLICITATION for HTASC.

Potential offerors (and teammates) are encouraged to provide questions, comments, and suggestions relating to the Draft Solicitation and all attachments. Questions received will be consolidated, answered, and (if deemed valuable information for all interested parties) will be posted at a later date as an update to this Special Notice.  The Government will not disclose the identity of the potential offeror (or teammate) asking the questions.

Questions, comments, and suggestions ("responses") relating to the Draft Solicitation ARE DUE no later than: Wednesday, 07 JUNE 2017, 08:00AM EDT.

Please submit all responses to the following email inbox (the size limitation is 20MB) with email subject as "HTASC Draft Solicitation Response":

usarmy.orlando.peo-stri.mbx.htasc@mail.mil

Please mark submitted proprietary information/data accordingly.  Cover page (or within email, if applicable) of response shall include: Contractor name, address, point of contact information, DUNS, CAGE, and small business information, if applicable (including reference to NAICS 611430).


Even if your firm DOES NOT submit a "response" related to the Draft Solicitation, please answer the following question and submit to the email inbox; "responses" should also include an answer to the following question:

Do you intend to submit an offer (as the prime contractor) in response to a Final HTASC Solicitation?

THIS IS NOT A FORMAL SOLICITATION AND ALL DOCUMENTS PROVIDED BY THE GOVERNMENT ARE DRAFT.

The Key PALT milestones provided 26 April 2017 are still accurate.  We look forward to hearing from you and thank you for your interest and support of this upcoming acquisition.

UPDATE - 26 April 2017:

ACC-ORL received and accepted an actionable/finalized Requirements Package in April 2017; Procurement Administrative Lead Time (PALT) also began in April 2017. Key PALT milestones for HTASC:

Draft Solicitation expected: May 2017.
Final Solicitation expected: September 2017 (Final Solicitation issue date is dependent on Army Senior Services Manager and Army Senior Procurement Executive reviews).
Award expected: 3rd Quarter Government Fiscal Year 2018.

UPDATE - 16 March 2017:

Draft Acquisition Strategy: Single Award, Indefinite Delivery Indefinite Quantity (IDIQ) contract, based off of a Subjective Tradeoff source selection (see FAR 15.101-1 and DoD Source Selection Procedures section 1.3.1, specifically, 1.3.1.3), full and open competition (see FAR 6.1). Small Business participation requirement: 30%.

Note - Acquisition Strategy approved locally (final approval pending higher headquarters' review in accordance with regulation and policy).


UPDATE - 13 March 2017:

Expected Timelines:

ACC-ORL receipt of Finalized Requirements Package changed from 2QFY17 (end of January) to 2QFY17 (end of March).
Draft Solicitation changed from 2QFY17 (March) to 3QFY17 (April).
No change to Final Solicitation: 3QFY17 (June).
No change to Customer Target Award: 2QFY18 (March).

UPDATE - 19 December 2016:

Expected Timelines:

ACC-ORL receipt of Finalized Requirements Package changed from 1QFY17 (mid December) to 2QFY17 (end of January).
Draft Solicitation changed from 2QFY17 (January) to 2QFY17 (March).
Final Solicitation changed from 3QFY17 (May) to 3QFY17 (June).
No change to Customer Target Award: 2QFY18 (March).

UPDATE - 07 December 2016:

A Sources Sought Notice (SSN) has been posted under the HTASC Solicitation reference number W900KK-17-R-0014.  This Special Notice will continue to be used for general information relating to HTASC.

ORIGINAL:

For all communication, please email the HTASC mailbox: usarmy.orlando.peo-stri.mbx.htasc@mail.mil

Expected timelines:

In November 2016, the Government intends to post an updated, draft Performance Work Statement (PWS) for industry review/questions/comments.
Draft Solicitation changed from 1QFY17 (October) to 2QFY17 (January).
Final Solicitation changed from 2QFY17 (March) to 3QFY17 (May).
Customer Target Award changed from 2QFY18 (January) to 2QFY18 (March).

NOTE: THIS NOTICE IS ASSOCIATED WITH PREVIOUS NOTICES:

W900KK-17-R-0014 - SOURCES SOUGHT
W900KK-16-R-0023 - SOURCES SOUGHT
W900KKHTASC - SPECIAL NOTICE/REQUEST FOR INFORMATION

Update #8 ·

Added: Oct 17, 2016 10:44 am Modified: May 22, 2017 4:32 pmTrack Changes

UPDATE - 22 May 2017:

This update serves as the DRAFT SOLICITATION for HTASC.

Potential offerors (and teammates) are encouraged to provide questions, comments, and suggestions relating to the Draft Solicitation and all attachments. Questions received will be consolidated, answered, and (if deemed valuable information for all interested parties) will be posted at a later date as an update to this Special Notice.  The Government will not disclose the identity of the potential offeror (or teammate) asking the questions.

Questions, comments, and suggestions ("responses") relating to the Draft Solicitation ARE DUE no later than: Wednesday, 07 JUNE 2017, 08:00AM EDT.

Please submit all responses to the following email inbox (the size limitation is 20MB) with email subject as "HTASC Draft Solicitation Response":

usarmy.orlando.peo-stri.mbx.htasc@mail.mil

Please mark submitted proprietary information/data accordingly.  Cover page (or within email, if applicable) of response shall include: Contractor name, address, point of contact information, DUNS, CAGE, and small business information, if applicable (including reference to NAICS 611430).


Even if your firm DOES NOT submit a "response" related to the Draft Solicitation, please answer the following question and submit to the email inbox; "responses" should also include an answer to the following question:

Do you intend to submit an offer (as the prime contractor) in response to a Final HTASC Solicitation?

THIS IS NOT A FORMAL SOLICITATION AND ALL DOCUMENTS PROVIDED BY THE GOVERNMENT ARE DRAFT.

The Key PALT milestones provided 26 April 2017 are still accurate.  We look forward to hearing from you and thank you for your interest and support of this upcoming acquisition.

UPDATE - 26 April 2017:

ACC-ORL received and accepted an actionable/finalized Requirements Package in April 2017; Procurement Administrative Lead Time (PALT) also began in April 2017. Key PALT milestones for HTASC:

Draft Solicitation expected: May 2017.
Final Solicitation expected: September 2017 (Final Solicitation issue date is dependent on Army Senior Services Manager and Army Senior Procurement Executive reviews).
Award expected: 3rd Quarter Government Fiscal Year 2018.

UPDATE - 16 March 2017:

Draft Acquisition Strategy: Single Award, Indefinite Delivery Indefinite Quantity (IDIQ) contract, based off of a Subjective Tradeoff source selection (see FAR 15.101-1 and DoD Source Selection Procedures section 1.3.1, specifically, 1.3.1.3), full and open competition (see FAR 6.1). Small Business participation requirement: 30%.

Note - Acquisition Strategy approved locally (final approval pending higher headquarters' review in accordance with regulation and policy).


UPDATE - 13 March 2017:

Expected Timelines:

ACC-ORL receipt of Finalized Requirements Package changed from 2QFY17 (end of January) to 2QFY17 (end of March).
Draft Solicitation changed from 2QFY17 (March) to 3QFY17 (April).
No change to Final Solicitation: 3QFY17 (June).
No change to Customer Target Award: 2QFY18 (March).

UPDATE - 19 December 2016:

Expected Timelines:

ACC-ORL receipt of Finalized Requirements Package changed from 1QFY17 (mid December) to 2QFY17 (end of January).
Draft Solicitation changed from 2QFY17 (January) to 2QFY17 (March).
Final Solicitation changed from 3QFY17 (May) to 3QFY17 (June).
No change to Customer Target Award: 2QFY18 (March).

UPDATE - 07 December 2016:

A Sources Sought Notice (SSN) has been posted under the HTASC Solicitation reference number W900KK-17-R-0014.  This Special Notice will continue to be used for general information relating to HTASC.

ORIGINAL:

For all communication, please email the HTASC mailbox: usarmy.orlando.peo-stri.mbx.htasc@mail.mil

Expected timelines:

In November 2016, the Government intends to post an updated, draft Performance Work Statement (PWS) for industry review/questions/comments.
Draft Solicitation changed from 1QFY17 (October) to 2QFY17 (January).
Final Solicitation changed from 2QFY17 (March) to 3QFY17 (May).
Customer Target Award changed from 2QFY18 (January) to 2QFY18 (March).

NOTE: THIS NOTICE IS ASSOCIATED WITH PREVIOUS NOTICES:

W900KK-17-R-0014 - SOURCES SOUGHT
W900KK-16-R-0023 - SOURCES SOUGHT
W900KKHTASC - SPECIAL NOTICE/REQUEST FOR INFORMATION

Update #7 ·

Added: Oct 17, 2016 10:44 am Modified: Apr 26, 2017 10:08 amTrack Changes

UPDATE - 26 April 2017:

ACC-ORL received and accepted an actionable/finalized Requirements Package in April 2017; Procurement Administrative Lead Time (PALT) also began in April 2017. Key PALT milestones for HTASC:

Draft Solicitation expected: May 2017.
Final Solicitation expected: September 2017 (Final Solicitation issue date is dependent on Army Senior Services Manager and Army Senior Procurement Executive reviews).
Award expected: 3rd Quarter Government Fiscal Year 2018.

UPDATE - 16 March 2017:

Draft Acquisition Strategy: Single Award, Indefinite Delivery Indefinite Quantity (IDIQ) contract, based off of a Subjective Tradeoff source selection (see FAR 15.101-1 and DoD Source Selection Procedures section 1.3.1, specifically, 1.3.1.3), full and open competition (see FAR 6.1). Small Business participation requirement: 30%.

Note - Acquisition Strategy approved locally (final approval pending higher headquarters' review in accordance with regulation and policy).


UPDATE - 13 March 2017:

Expected Timelines:

ACC-ORL receipt of Finalized Requirements Package changed from 2QFY17 (end of January) to 2QFY17 (end of March).
Draft Solicitation changed from 2QFY17 (March) to 3QFY17 (April).
No change to Final Solicitation: 3QFY17 (June).
No change to Customer Target Award: 2QFY18 (March).

UPDATE - 19 December 2016:

Expected Timelines:

ACC-ORL receipt of Finalized Requirements Package changed from 1QFY17 (mid December) to 2QFY17 (end of January).
Draft Solicitation changed from 2QFY17 (January) to 2QFY17 (March).
Final Solicitation changed from 3QFY17 (May) to 3QFY17 (June).
No change to Customer Target Award: 2QFY18 (March).

UPDATE - 07 December 2016:

A Sources Sought Notice (SSN) has been posted under the HTASC Solicitation reference number W900KK-17-R-0014.  This Special Notice will continue to be used for general information relating to HTASC.

ORIGINAL:

For all communication, please email the HTASC mailbox: usarmy.orlando.peo-stri.mbx.htasc@mail.mil

Expected timelines:

In November 2016, the Government intends to post an updated, draft Performance Work Statement (PWS) for industry review/questions/comments.
Draft Solicitation changed from 1QFY17 (October) to 2QFY17 (January).
Final Solicitation changed from 2QFY17 (March) to 3QFY17 (May).
Customer Target Award changed from 2QFY18 (January) to 2QFY18 (March).

NOTE: THIS NOTICE IS ASSOCIATED WITH PREVIOUS NOTICES:

W900KK-17-R-0014 - SOURCES SOUGHT
W900KK-16-R-0023 - SOURCES SOUGHT
W900KKHTASC - SPECIAL NOTICE/REQUEST FOR INFORMATION

Update #6 ·

Added: Oct 17, 2016 10:44 am Modified: Mar 24, 2017 11:13 amTrack Changes

UPDATE - 16 March 2017:

Draft Acquisition Strategy: Single Award, Indefinite Delivery Indefinite Quantity (IDIQ) contract, based off of a Subjective Tradeoff source selection (see FAR 15.101-1 and DoD Source Selection Procedures section 1.3.1, specifically, 1.3.1.3), full and open competition (see FAR 6.1). Small Business participation requirement: 30%.

Note - Acquisition Strategy approved locally (final approval pending higher headquarters' review in accordance with regulation and policy).


UPDATE - 13 March 2017:

Expected Timelines:

ACC-ORL receipt of Finalized Requirements Package changed from 2QFY17 (end of January) to 2QFY17 (end of March).
Draft Solicitation changed from 2QFY17 (March) to 3QFY17 (April).
No change to Final Solicitation: 3QFY17 (June).
No change to Customer Target Award: 2QFY18 (March).

UPDATE - 19 December 2016:

Expected Timelines:

ACC-ORL receipt of Finalized Requirements Package changed from 1QFY17 (mid December) to 2QFY17 (end of January).
Draft Solicitation changed from 2QFY17 (January) to 2QFY17 (March).
Final Solicitation changed from 3QFY17 (May) to 3QFY17 (June).
No change to Customer Target Award: 2QFY18 (March).

UPDATE - 07 December 2016:

A Sources Sought Notice (SSN) has been posted under the HTASC Solicitation reference number W900KK-17-R-0014.  This Special Notice will continue to be used for general information relating to HTASC.

ORIGINAL:

For all communication, please email the HTASC mailbox: usarmy.orlando.peo-stri.mbx.htasc@mail.mil

Expected timelines:

In November 2016, the Government intends to post an updated, draft Performance Work Statement (PWS) for industry review/questions/comments.
Draft Solicitation changed from 1QFY17 (October) to 2QFY17 (January).
Final Solicitation changed from 2QFY17 (March) to 3QFY17 (May).
Customer Target Award changed from 2QFY18 (January) to 2QFY18 (March).

NOTE: THIS NOTICE IS ASSOCIATED WITH PREVIOUS NOTICES:

W900KK-17-R-0014 - SOURCES SOUGHT
W900KK-16-R-0023 - SOURCES SOUGHT
W900KKHTASC - SPECIAL NOTICE/REQUEST FOR INFORMATION

Update #5 ·

Added: Oct 17, 2016 10:44 am Modified: Mar 16, 2017 3:41 pmTrack Changes

UPDATE - 16 March 2017:

Draft Acquisition Strategy: Single Award, Indefinite Delivery Indefinite Quantity (IDIQ) contract, based off of a Subjective Tradeoff source selection (see FAR 15.101-1 and DoD Source Selection Procedures section 1.3.1, specifically, 1.3.1.3), full and open competition (see FAR 6.1). Small Business participation requirement: 30%.

Note - Acquisition Strategy approved locally (final approval pending higher headquarters' review in accordance with regulation and policy).


UPDATE - 13 March 2017:

Expected Timelines:

ACC-ORL receipt of Finalized Requirements Package changed from 2QFY17 (end of January) to 2QFY17 (end of March).
Draft Solicitation changed from 2QFY17 (March) to 3QFY17 (April).
No change to Final Solicitation: 3QFY17 (June).
No change to Customer Target Award: 2QFY18 (March).

UPDATE - 19 December 2016:

Expected Timelines:

ACC-ORL receipt of Finalized Requirements Package changed from 1QFY17 (mid December) to 2QFY17 (end of January).
Draft Solicitation changed from 2QFY17 (January) to 2QFY17 (March).
Final Solicitation changed from 3QFY17 (May) to 3QFY17 (June).
No change to Customer Target Award: 2QFY18 (March).

UPDATE - 07 December 2016:

A Sources Sought Notice (SSN) has been posted under the HTASC Solicitation reference number W900KK-17-R-0014.  This Special Notice will continue to be used for general information relating to HTASC.

ORIGINAL:

For all communication, please email the HTASC mailbox: usarmy.orlando.peo-stri.mbx.htasc@mail.mil

Expected timelines:

In November 2016, the Government intends to post an updated, draft Performance Work Statement (PWS) for industry review/questions/comments.
Draft Solicitation changed from 1QFY17 (October) to 2QFY17 (January).
Final Solicitation changed from 2QFY17 (March) to 3QFY17 (May).
Customer Target Award changed from 2QFY18 (January) to 2QFY18 (March).

NOTE: THIS NOTICE IS ASSOCIATED WITH PREVIOUS NOTICES:

W900KK-16-R-0023 - SOURCES SOUGHT
W900KKHTASC - SPECIAL NOTICE/REQUEST FOR INFORMATION

Update #4 ·

Added: Oct 17, 2016 10:44 am Modified: Mar 13, 2017 12:10 pmTrack Changes UPDATE - 13 March 2017:

Expected Timelines:

ACC-ORL receipt of Finalized Requirements Package changed from 2QFY17 (end of January) to 2QFY17 (end of March).
Draft Solicitation changed from 2QFY17 (March) to 3QFY17 (April).
No change to Final Solicitation: 3QFY17 (June).
No change to Customer Target Award: 2QFY18 (March).

UPDATE - 19 December 2016:

Expected Timelines:

ACC-ORL receipt of Finalized Requirements Package changed from 1QFY17 (mid December) to 2QFY17 (end of January).
Draft Solicitation changed from 2QFY17 (January) to 2QFY17 (March).
Final Solicitation changed from 3QFY17 (May) to 3QFY17 (June).
No change to Customer Target Award: 2QFY18 (March).

UPDATE - 07 December 2016:

A Sources Sought Notice (SSN) has been posted under the HTASC Solicitation reference number W900KK-17-R-0014.  This Special Notice will continue to be used for general information relating to HTASC.

ORIGINAL:

For all communication, please email the HTASC mailbox: usarmy.orlando.peo-stri.mbx.htasc@mail.mil

Expected timelines:

In November 2016, the Government intends to post an updated, draft Performance Work Statement (PWS) for industry review/questions/comments.
Draft Solicitation changed from 1QFY17 (October) to 2QFY17 (January).
Final Solicitation changed from 2QFY17 (March) to 3QFY17 (May).
Customer Target Award changed from 2QFY18 (January) to 2QFY18 (March).

NOTE: THIS NOTICE IS ASSOCIATED WITH PREVIOUS NOTICES:

W900KK-16-R-0023 - SOURCES SOUGHT
W900KKHTASC - SPECIAL NOTICE/REQUEST FOR INFORMATION

Update #3 ·

Added: Oct 17, 2016 10:44 am Modified: Dec 19, 2016 9:44 amTrack Changes UPDATE - 19 December 2016:

Expected Timelines:

ACC-ORL receipt of Finalized Requirements Package changed from 1QFY17 (mid December) to 2QFY17 (end of January).
Draft Solicitation changed from 2QFY17 (January) to 2QFY17 (March).
Final Solicitation changed from 3QFY17 (May) to 3QFY17 (June).
No change to Customer Target Award: 2QFY18 (March).

UPDATE - 07 December 2016:

A Sources Sought Notice (SSN) has been posted under the HTASC Solicitation reference number W900KK-17-R-0014.  This Special Notice will continue to be used for general information relating to HTASC.

ORIGINAL:

For all communication, please email the HTASC mailbox: usarmy.orlando.peo-stri.mbx.htasc@mail.mil

Expected timelines:

In November 2016, the Government intends to post an updated, draft Performance Work Statement (PWS) for industry review/questions/comments.
Draft Solicitation changed from 1QFY17 (October) to 2QFY17 (January).
Final Solicitation changed from 2QFY17 (March) to 3QFY17 (May).
Customer Target Award changed from 2QFY18 (January) to 2QFY18 (March).

NOTE: THIS NOTICE IS ASSOCIATED WITH PREVIOUS NOTICES:

W900KK-16-R-0023 - SOURCES SOUGHT
W900KKHTASC - SPECIAL NOTICE/REQUEST FOR INFORMATION

Update #2 ·

Added: Oct 17, 2016 10:44 am Modified: Dec 07, 2016 4:22 pmTrack Changes UPDATE - 07 December 2016:

A Sources Sought Notice (SSN) has been posted under the HTASC Solicitation reference number W900KK-17-R-0014.  This Special Notice will continue to be used for general information relating to HTASC.

ORIGINAL:

For all communication, please email the HTASC mailbox: usarmy.orlando.peo-stri.mbx.htasc@mail.mil

Expected timelines:

In November 2016, the Government intends to post an updated, draft Performance Work Statement (PWS) for industry review/questions/comments.
Draft Solicitation changed from 1QFY17 (October) to 2QFY17 (January).
Final Solicitation changed from 2QFY17 (March) to 3QFY17 (May).
Customer Target Award changed from 2QFY18 (January) to 2QFY18 (March).

NOTE: THIS NOTICE IS ASSOCIATED WITH PREVIOUS NOTICES:

W900KK-16-R-0023 - SOURCES SOUGHT
W900KKHTASC - SPECIAL NOTICE/REQUEST FOR INFORMATION

Update #1 ·

Added: Oct 17, 2016 10:44 am For all communication, please email the HTASC mailbox: usarmy.orlando.peo-stri.mbx.htasc@mail.mil

Expected timelines:

In November 2016, the Government intends to post an updated, draft Performance Work Statement (PWS) for industry review/questions/comments.
Draft Solicitation changed from 1QFY17 (October) to 2QFY17 (January).
Final Solicitation changed from 2QFY17 (March) to 3QFY17 (May).
Customer Target Award changed from 2QFY18 (January) to 2QFY18 (March).

NOTE: THIS NOTICE IS ASSOCIATED WITH PREVIOUS NOTICES:

W900KK-16-R-0023 - SOURCES SOUGHT
W900KKHTASC - SPECIAL NOTICE/REQUEST FOR INFORMATION

Attachments

Files attached to this notice, newest first
File Type Posted
HTASC_draftSolicitation_QA_REV1_06Jul17.docx DOCX document
HTASC_draftSolicitation_QA_21Jun17.docx DOCX document
HTASC_DSol_SecJ_ExhA_BLibrary_111thNCOA.zip ZIP file
HTASC_DSol_SecJ_ExhA_BLibrary_TDS.zip ZIP file
HTASC_draftSolicitation.docx DOCX document
HTASC_DSol_SecJ_ExhA_BLibrary_NSTID.zip ZIP file
HTASC_DSol_SecJ_Att07_CostPriceWorkbook.xlsx XLSX spreadsheet
HTASC_DSol_SecJ_Att03_DD254.pdf PDF
HTASC_DSol_SecJ_Att06_TO0001_SOOandPRS.docx DOCX document
HTASC_DSol_SecJ_ExhA_BLibrary_1_100th.zip ZIP file
HTASC_DSol_SecJ_Att02_SolClarificationForm.doc DOC document
HTASC_DSol_SecJ_ExhA_BLibrary_CDRLsSomeTOs.zip ZIP file
HTASC_DSol_SecJ_Att08_SBPartForm.xlsx XLSX spreadsheet
HTASC_DSol_SecJ_Att01_IDIQ_PWS.docx DOCX document
HTASC_DSol_SecJ_Att05_TO0001.docx DOCX document
HTASC_DSol_SecJ_ExhA_BLibrary_HTJCOE.zip ZIP file
HTASC_DSol_SecJ_ExhA_BLibrary_TableOfContents.xlsx XLSX spreadsheet
HTASC_DSol_SecJ_Att04_SF1408PAS.pdf PDF
HTASC_DSol_SecJ_ExhA_BLibrary_TCC.zip ZIP file
HTASC_DSol_SectionJ_ExhA_BLibrary_Basic.zip ZIP file
Show all 20

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Huachuca Training and Support Contract (HTASC) Award Award Notice
Huachuca Training and Support Contract (HTASC) December 2016 Sources Sought Notice (SSN) Latest pre-solicitation Pre-Solicitation
DRAFT SOLICITATION - Huachuca Training and Support Contract (HTASC) This notice · Original Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity