DRAFT: B-21 N. ENV. Protection Shelters, Ellsworth AFB, South Dakota
Closed Special Notice Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W9128F24R0051
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
Notice details come from SAM.gov. Updated .
About this opportunity
This Special Notice from the Department of the Army Corps of Engineers Engineering District Omaha concerns the construction of B-21 North Environmental Protection Shelters at Ellsworth Air Force Base in South Dakota. The Corps seeks to provide covered storage facilities to protect the B-21 bombers during maintenance, repair, and overhaul activities.
The Notice establishes a March 21, 2024 deadline for contractors to submit proposals for the shelters' design and construction. All interested parties meeting standard federal contracting qualifications are eligible to participate. The project aims to complete the shelters by 2026 to support the 28th Bomb Wing's introduction of the B-21 Raider fleet. Contractors should review the full Notice for proposal requirements, site information, and other details regarding this opportunity to support the critical infrastructure needs of Ellsworth Air Force Base.
Notice text
2 versions
Update #2 · Latest ·
Solicitation Number: W9128F24R0051Draft Request for Proposal (RFP): The Government is seeking questions, comments, suggestions, and corrections to improve the draft solicitation for this procurement. Potential Offerors may exchange as much information about internal business practices or potential solutions to the Army on a confidential basis. The Draft RFP is not a formal solicitation; it is a mechanism for potential Offerors to comment on all aspects of the Draft RFP and identify unnecessary or inefficient requirements. Information Offerors need to prepare its proposal, however, will be disclosed to all potential Offerors at the earliest possible opportunity. All feedback provided by industry on this draft RFP shall be provided at no charge to the government. Offerors should not expect a Government response to feedback provided, instead any feedback will be reviewed and incorporated into the final RFP, at the Governments discretion. The Government emphasizes that this is not a request for competitive proposals. This is a Draft RFP announcement only. No evaluation letters and/or results will be issued to the respondents. Solicitation requests will not be acknowledged. USACE Omaha is not seeking or accepting unsolicited proposals, and USACE Omaha will not accept telephone inquiries. The final RFP may be different from the Draft RFP. Disclosure of the magnitude of construction, as prescribed in FAR 36.204 and DFARS 26.204, is between $25M and $100M. Project Period of Performance is 730 calendar days from construction NTP. DRAFT Evaluation Documents: In order to facilitate fruitful exchange with industry, draft solicitation documents are being provided for review: Draft contracting front end, Draft Source Selection Evaluation Criteria (00 22 00), Technical Specifications, and Technical Drawings. Attachments also include a questionnaire with more specific items related to the project. Please submit your responses to the draft RFP no later that 2:00PM (CST), 21 March 2024 to Scott Dwyer at Scott.Dwyer@usace.army.mil, and copy Shawn Adkins at Shawn.A.Adkins@usace.army.mil
Update #1 ·
B-21 N. ENV. Protection Shelters, Ellsworth AFB, South Dakota
Notice history
| Notice | Type | Posted |
|---|---|---|
| B-21 60 Row Environmental Protection Shelters - North | Award Notice | |
| B-21 60 Row Environmental Protection Shelters - North | Solicitation | |
| B-21 60 Row EPS - North, Ellsworth AFB, South Dakota | Pre-Solicitation | |
| B-21 60 Row EPS - North, Ellsworth AFB, South Dakota | Pre-Solicitation | |
| This notice | Special Notice |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business | |
| Ellsworth AFB COCESS | Air Combat Command | No set-aside | |
| PKA Relocatable Facility | Global Strike Command | Total Small Business | |
| F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah | ENDIST Sacramento | No set-aside | |
| B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback | ENDIST Fort Worth | No set-aside |