Diana E. Murphy US Courthouse Elevator & Escalator Modernization Project

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest special notice from .

Solicitation number
47PF0023R0074
Agency
Region 5 Public Buildings Service, General Services Administration
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2AA Repair Or Alteration Of Office Buildings
Place of performance
Minneapolis, Minnesota 55415, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The General Services Administration (GSA) is seeking qualified small businesses for a design-build project to modernize the vertical transportation systems, including 13 elevators and a pair of escalators, at the Diana E. Murphy U.S. Courthouse in Minneapolis, MN. The project, which is expected to be solicited in September 2023, will include design, engineering, construction, and other related services, with the aim of minimizing long-term operational and maintenance costs, ensuring safety compliance, and minimizing disruption to the building's occupants. The project is expected to cost between $10M and $15M.

List of products and services to be provided:

  1. Design, engineering, and construction services for elevator and escalator modernization.
  2. Replacement of solid state drives and existing motor generators.
  3. Installation of new microprocessor destination-based electronic controllers.
  4. Installation of door operators, wiring, safeties.
  5. Lighting and fan power reduction.
  6. Hoistway refurbishment including lighting, guide shoes, and roller guides.
  7. Installation of new machine room control systems, operating panels, feeder cables.
  8. Upgrade of elevator cab ceilings and lighting systems.
  9. Operational safety feature upgrades to comply with current building codes.
  10. Machine room piping and roof drain location modification if necessary due to new equipment.
  11. Installation of new sump pumps or drainage in elevator pits.
  12. Hazardous material abatement as necessary.
  13. Replacement/refurbishment of all parts of the escalator.
  14. Collaboration with all stakeholders to deliver a project that meets the expectations and needs of the team members and GSA’s requirements.
  15. Compliance with the P-100 (Facility Standards for Public Buildings) and all other applicable building codes and standards.
  16. Full commissioning and functional testing of all installed systems.

Notice text

The purpose of this Sources Sought notice is to determine the availability and capability of qualified Small Businesses, Government Certified 8(a) Businesses, Service Disabled Veteran Owned Small Businesses, Woman Owned Small Businesses, HUBZone Small Businesses, or Small Disadvantaged Businesses.

Responses to this notice will be used for informational and planning purposes only and shall not be construed as a solicitation or as an obligation or commitment by the Government. This notice is intended strictly for market research only.  Depending on market research and other influences, GSA anticipates issuing a Phase I solicitation for this project in September of 2023. 

This is not a request for offers or proposals. The Government does not intend to award a contract based on responses and the Government is not obligated to and will not pay for information received as a result of this announcement.

This procurement will be advertised under North American Industrial Classification System (NAICS) code 236220 – Commercial and Institutional Building Construction. The small business size standard for NAICS code 236220 is $45M in average annual receipts over the past three (3) years. 

Project Location:

Diana E. Murphy U.S. Courthouse

300 S. Fourth St.

Minneapolis, MN 55415

Project Description:

The General Services Administration (GSA) intends to modernize the vertical transportation systems in the Diana E. Murphy U.S. Courthouse including the pair of escalators and the 13 elevators. The planned project delivery method is Design-Build. The aged equipment is causing increased costs for repairs and replacement parts due to lack of availability.

Goals for the modernization include: minimizing long term operational and maintenance costs, compliance with safety standards and regulations,minimizing negative impacts to the agencies throughout the buildout, and completing the project within budget and schedule.

Scope Summary:

The design-build scope of work includes all labor and materials required to provide design, engineering, construction, and other related services necessary to modernize the existing passenger and freight elevators. 

The basic modernization scope items to include, but are not limited to the following:

  • Solid State drives to replace existing motor generators.
  • New microprocessor Destination based electronic controllers.
  • Door operators, wiring, safeties
  • Lighting and fan power reduction
  • Hoistway refurbishment including hoistway lighting, guide shoes and roller guides replaced.
  • New machine room control systems, operating panels, feeder cables
  • Elevator cab ceilings and lighting systems
  • Operational safety feature upgrades to comply with current building codes
  • Machine room piping and roof drain location modification if necessary due to new equipment
  • New sump pumps or drainage in elevator pits
  • Hazardous material abatement as necessary
  • Replacement/refurbishment of all parts of the escalator, while maintaining the exciting truss

The contractor should also have extensive experience with working in a fully occupied building.

Options may be presented when the Request for Proposal (RFP) is released. The Design Build contractor will be fully responsible for all design, construction, and value engineering exercises if necessary related to the project.   

Project Description & Approach:

The General Services Administration (GSA) intends to award a firm fixed-price, Design-Buildcontract for the Diana E. Murphy U.S. Courthouse Elevator & Escalator Modernization project pursuant to the Federal Acquisition Regulation (FAR) Best Value Design-Build Selection Procedures (FAR Subpart 15.3).

GSA envisions a highly collaborative Design-Build delivery approach for this project where the DB contractor works closely with all stakeholders to deliver a project that meets the expectations and needs of the team members and GSA’s requirements to deliver economical and operationally efficient elevators.

Federal energy goal compliance will be defined in the technical POR of the solicitation.  The project must comply with the P-100 (Facility Standards for Public Buildings) and all other applicable building codes and standards.

The Design-Builder will be selected through a best value/tradeoff selection process.  During the development period, from initial concept to final design, the DB will work in close consultation with GSA and various stakeholders to ensure that all of the goals are addressed and that best value practices are utilized.

There will be an informal partnering process throughout design and construction to promote successful project development and execution including a project kick-off meeting. All installed systems will be fully commissioned and functionally tested to ensure compliance with contract documents prior to acceptance by GSA.

Risks:

The modernization of the elevators will occur while the building is fully occupied, and the phasing of the work will need to allow for continued escalator and elevator use. Work is to have minimal to no adverse impact on tenant missions. 

Responses:

Interested small business vendors in the categories listed above shall submit their capability statement electronically, limited to 10 pages. The capability statement shall be sufficient in detail to allow the Government to determine the organization's qualifications to perform the work. The statement shall include: 

1)     a) Company name 

        b) Unique Entity Identifier

        c) Active SAM registration 

        d) Socioeconomic Status 

2) A statement describing the company's interest in performing the work.

3) Capabilities and experience with federal projects in design and construction of historic elevator upgrade/modernizations in the $10M - $15M range, utilizing the Design-Build Method.  Submitted references should highlight recent and relevant design-build elevator projects in fully occupied facilities within the past 10 years. Submitted projects must also demonstrate historic preservation experience.

4) Statement of capability to bond for a project in the $10M-$15M range.

5) Contact information, Point of contact name, Phone number, e-mail address and web address (if available).

Acknowledgment of receipt of responses will not be made, nor will respondents be notified of the Government’s evaluation of the information received.  Incomplete responses will not be considered in determining market availability. 

Responses to this Notice shall be reviewed by the Contracting Officer for the purpose of determining whether there exists reasonable interest and capability.  A determination not to complete the proposed procurement based upon responses to this Notice is solely within the discretion of the Government in response to this Notice will be for review purposes only.

THIS IS NOT A REQUEST FOR PROPOSALS.

Interested Offerors shall respond to the Sources Sought no later than 4:00 pm CST, July 24, 2023, via email to Jennifer Styzek at jennifer.styzek@gsa.gov.   Subject line of the email shall appear as follows: Murphy Elevator/Escalator DB Sources Sought Response.

Oral communications, telecommunications and faxed inquiries or comments are NOT acceptable as a response to this Notice. Only e-mail responses will be accepted.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Diana E. Murphy US Courthouse Elevator & Escalator Modernization Project Award Award Notice
Diana E. Murphy US Courthouse Elevator & Escalator Modernization Project Latest special notice Special Notice
Diana E. Murphy US Courthouse Elevator & Escalator Modernization Project Solicitation
Diana E. Murphy US Courthouse Elevator & Escalator Modernization Project Pre-Solicitation
Diana E. Murphy US Courthouse Elevator & Escalator Modernization Project This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity