Design-Build NM ERFO 207(1), Catwalk Trail

Award Notice Posted

Solicitation number
DTFH68-15-R-00001
Agency
Awarded
to AUI Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH6815C00040 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Gila National Forest Catron County, New Mexico 88061, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

The Response date has been changed from Oct 30, 2014 to Oct 31, 2014 to match the official response date listed in the RFQ.

This is not a Request for Proposals (RFP).  Project Plans and Specifications are not yet available.  This Design-Build project will be tentatively advertised on October 1, 2014 on an unrestricted (full and open) basis.  Official RFP documents will be available at that time.  A government-led site visit will be announced with the RFP.  The announcement will include the site visit date, time and location.  The site visit will be non-mandatory but prospective proposers are strongly encouraged to attend.

The Catwalk Trail Reconstruction project is located in Catron County, New Mexico, within the Gila National Forest. This project will provide spot repairs along two hiking trails, as well as replace pedestrian bridge structures damaged in a 2013 flood event.

Design-build has been selected as the procurement method for this project due to the extreme access and weather conditions at the project site, accelerated construction timeline necessitated by the monsoon season and flash flood threat, and design and fitting requirements of major pedestrian structures.

The major work elements include debris removal, trail restoration, construction of a suspended Catwalk Trail bridge section, and various pedestrian bridges. The majority of work will take place in a confined slot canyon with limited access to equipment and personnel. Construction within the canyon must be substantially complete before the monsoon season (June 30), only providing a construction weather window of approximately 3 months. The Catwalk Trail bridge section consists of a pedestrian bridge suspended or supported along the irregular cliff face of the slot canyon, requiring detailed measurements and shop drawings for a proper fit.

The proposed project is for spot repairs and reconstruction at damaged sites, at an estimated cost between $3M and $5M. The primary scopes of work include debris removal, trail restoration, construction of Catwalk Trail bridge structure and overlooks, and construction of various pedestrian bridges. Significant quantities include:

Trail Restoraiton 3000 LNFT
Catwalk Bridge Trail Structure 600 LNFT
Pedestrian Bridges 3 EACH

The Response date has been changed from Oct 30, 2014 to Oct 31, 2014 to match the official response date listed in the RFQ.

This solicitation is being advertised on a full and open (unrestricted) basis.  This is a two-phase Design-Build procurement.  As such, Phase One is the Request for Qualifications (RFQ) and no final design package is available.  The RFQ attachment contains all applicable information.  Any questions must be submitted electronically as indicated in the attached RFQ.

Update #3 ·

This is not a Request for Proposals (RFP).  Project Plans and Specifications are not yet available.  This Design-Build project will be tentatively advertised on October 1, 2014 on an unrestricted (full and open) basis.  Official RFP documents will be available at that time.  A government-led site visit will be announced with the RFP.  The announcement will include the site visit date, time and location.  The site visit will be non-mandatory but prospective proposers are strongly encouraged to attend.

The Catwalk Trail Reconstruction project is located in Catron County, New Mexico, within the Gila National Forest. This project will provide spot repairs along two hiking trails, as well as replace pedestrian bridge structures damaged in a 2013 flood event.

Design-build has been selected as the procurement method for this project due to the extreme access and weather conditions at the project site, accelerated construction timeline necessitated by the monsoon season and flash flood threat, and design and fitting requirements of major pedestrian structures.

The major work elements include debris removal, trail restoration, construction of a suspended Catwalk Trail bridge section, and various pedestrian bridges. The majority of work will take place in a confined slot canyon with limited access to equipment and personnel. Construction within the canyon must be substantially complete before the monsoon season (June 30), only providing a construction weather window of approximately 3 months. The Catwalk Trail bridge section consists of a pedestrian bridge suspended or supported along the irregular cliff face of the slot canyon, requiring detailed measurements and shop drawings for a proper fit.

The proposed project is for spot repairs and reconstruction at damaged sites, at an estimated cost between $3M and $5M. The primary scopes of work include debris removal, trail restoration, construction of Catwalk Trail bridge structure and overlooks, and construction of various pedestrian bridges. Significant quantities include:

Trail Restoraiton 3000 LNFT
Catwalk Bridge Trail Structure 600 LNFT
Pedestrian Bridges 3 EACH

Update #2 ·

This solicitation is being advertised on a full and open (unrestricted) basis.  This is a two-phase Design-Build procurement.  As such, Phase One is the Request for Qualifications (RFQ) and no final design package is available.  The RFQ attachment contains all applicable information.  Any questions must be submitted electronically as indicated in the attached RFQ.

Update #1 ·

This is not a Request for Proposals (RFP).  Project Plans and Specifications are not yet available.  This Design-Build project will be tentatively advertised on October 1, 2014 on an unrestricted (full and open) basis.  Official RFP documents will be available at that time.  A government-led site visit will be announced with the RFP.  The announcement will include the site visit date, time and location.  The site visit will be non-mandatory but prospective proposers are strongly encouraged to attend.

The Catwalk Trail Reconstruction project is located in Catron County, New Mexico, within the Gila National Forest. This project will provide spot repairs along two hiking trails, as well as replace pedestrian bridge structures damaged in a 2013 flood event.

Design-build has been selected as the procurement method for this project due to the extreme access and weather conditions at the project site, accelerated construction timeline necessitated by the monsoon season and flash flood threat, and design and fitting requirements of major pedestrian structures.

The major work elements include debris removal, trail restoration, construction of a suspended Catwalk Trail bridge section, and various pedestrian bridges. The majority of work will take place in a confined slot canyon with limited access to equipment and personnel. Construction within the canyon must be substantially complete before the monsoon season (June 30), only providing a construction weather window of approximately 3 months. The Catwalk Trail bridge section consists of a pedestrian bridge suspended or supported along the irregular cliff face of the slot canyon, requiring detailed measurements and shop drawings for a proper fit.

The proposed project is for spot repairs and reconstruction at damaged sites, at an estimated cost between $1M and $3M. The primary scopes of work include debris removal, trail restoration, construction of Catwalk Trail bridge structure and overlooks, and construction of various pedestrian bridges. Significant quantities include:

Trail Restoraiton 3000 LNFT
Catwalk Bridge Trail Structure 600 LNFT
Pedestrian Bridges 3 EACH

Files

File Type Posted
10_16_Site_Visit_Sign_In_Sheet.pdf PDF
DTFH68-15-R-00001_RFQ.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors