Design-Build Construction of an Alternate Care Facility (ACF) at Miami Beach Convention Center in Florida

Awarded Limited / Sole Source Justification Posted

Solicitation number
W912EP20C0003
Agency
Set-aside
No set-aside

Opportunity facts

Contract number
W912EP20C0003 Federal contract award
Place of performance
Miami Fl Usa

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers published a Limited/Sole Source Justification Notice to approve a justification and approval for a sole source contract awarded to The Robins and Morton Group. The contract provided design-build construction services to design and construct an Alternate Care Facility at the Miami Beach Convention Center that could treat up to 450 COVID-19 patients, with an aggressive timeline of 14 days to complete the work. Citing unusual and compelling urgency under the Presidential Emergency Declaration for the COVID-19 pandemic, the agency required a single contractor that could quickly increase healthcare capacity, resulting in a contract value of $25,925,691.61 being awarded on April 6, 2020 to complete the critical work.

Notice text

DESCRIPTION OF ACTION: In support of Presidential National Emergency Declaration Concerning the Novel Coronavirus Disease (COVID-19) Outbreak, dated 13 March 2020, after-the-fact approval is requested for a Justification and Approval (J&A) for a two-phase design-build construction, firm fixed price (FFP) Letter Contract awarded to The Robins and Morton Group, 400 Shades Creek Parkway, Birmingham, AL 35209 (Robins and Morton), on an other than full and open competition/sole-source basis under circumstances of Unusual and Compelling Urgency. The action was awarded as an Undefinitized Contract Action (UCA) and will be definitized as an FFP “C-type” contract. The type of funds utilized are Federal Emergency Management Administration (FEMA) Disaster Relief funds. There were no options identified for the contract.

DESCRIPTION OF SUPPLIES/SERVICES: The purpose of this contract was to provide design-build construction services in accordance with the Presidential National Emergency Declaration. Work effort consisted of the design and construction of an Alternate Care Facility (ACF) at the Miami Beach Convention Center to treat acute and non-acute COVID patients with 450 treatment spaces, as well as nurses’ stations, etc. This work provided an ACF meeting basic healthcare functions with an emphasis on patient isolation, infection control, fire protection, and life safety. This Justification is for Design-Build Construction of an Alternate Care Facility (ACF) at Miami Beach Convention Center in Florida. This contract was awarded on 06 April 2020 with an aggressive schedule of completion in 14 days upon award of the UCA. The contract was completed on 20 April 2020 with a total definitized contract value of $25,925,691.61.

Awarded contract W912EP20C0003 to unknown vendor for unknown amount on 2020-04-06.

Files

File Type Posted
JA - MBCC (Redacted).pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors