About this opportunity

The Department of the Interior, Bureau of Reclamation issued a Request for Information on June 30, 2026 soliciting contractor input on the Conconully Dam Safety of Dams Modification project in Washington, with responses due by July 29, 2026. This RFI is not a solicitation announcement and does not obligate payment for response costs. The Government seeks industry feedback to inform technical scoping prior to a future full solicitation expected in Fiscal Year 2027 or later.

The project addresses seismic vulnerability of the Conconully Dam through deep soil mixing treatment to approximately 60 feet depth across the downstream foundation and construction of a large downstream stability berm with engineered fill, filter, and drainage layers. Work includes substantial outlet works improvements: steel lining and grout encasement of existing systems, replacement of slide gates, outlet works extension via steel-lined concrete-encased conduit, new control valves, discharge channel, and demolition and replacement of control structures. The dam must remain operational throughout construction while maintaining irrigation deliveries of 20–100 cfs from April through October, and rock excavation and stabilization must occur without explosives.

The RFI addresses eight topics: construction feasibility for large rock excavation without blasting proximate to the dam, concurrent irrigation operations during outlet works construction, minimum flow maintenance in Salmon Creek, crew lodging availability in a remote location, potential Project Labor Agreement impacts, construction sequencing, major construction risks at 60 percent design completion, and shift or extended-hours feasibility given county noise ordinances (10:30 p.m. to 7:00 a.m. restrictions).

Responses must not exceed 15 pages and should be emailed to Contracting Officer Lance Fleming (Lance_Fleming@ios.doi.gov) and Contract Specialist Brock Palen (Brock_Palen@ios.doi.gov). An onsite Industry Day is planned for October 2026; details will be announced on SAM.gov. Monitor SAM.gov for the FY 2027 solicitation number under which the formal solicitation will be issued.

Notice text

Department of Interior, Bureau of Reclamation

Conconully Dam, WA Safety of Dams Modification

This announcement is a Request for Information (RFI) only. It should not be considered a solicitation announcement, synopsis, or any other type of pre-solicitation notice. Any cost accrued by an interested party in response to the RFI will not be paid by the Government. All dates in this announcement are subject to change.

This RFI is issued for the following:

1. Request industry input to aid Government designers in technical scoping for the development of a future requirement.
2. Provide advanced notice for a possible onsite Industry Day in October 2026.

Solicitation number 140R1026R0004 was generated to issue this RFI notice and a possible onsite Industry Day announcement later this year. If an onsite industry day is conducted, details will be announced on SAM.gov. Interested parties should take note that a future solicitation announcement or pre-solicitation notices will not be announced under this 140R1026R0004. However, industry day details may be announced under this number. Interested parties should continue to monitor the Government Wide Point of Entry (GPE) SAM.gov for announcements pertaining to this requirement until a Fiscal Year (FY) 2027 or subsequent FY solicitation number is announced on the GPE.

All responses or questions regarding this RFI must be sent via email to the Contracting Officer, Lance Fleming at Lance_Fleming@ios.doi.gov and the Contract Specialist, Brock Palen, at Brock_Palen@ios.doi.gov by 4:00PM Mountain Daylight Time (MDT) on Wednesday 7/29/2026. Any phone inquiries or other methods of communication will not be answered.

Attachments:
1. Project Overview Document
2. RFI Questions Document
3. 21-D-T001 Location and Vicinity Map

Files

Notice history

Notice Type Posted
Conconully Dam, WA, Safety of Dams Modification Latest pre-solicitation Pre-Solicitation
This notice Original Special Notice

Similar open opportunities

Opportunity Agency Set-aside Responses due
FY26 Clouter Creek Middle and Highway Cell Diking Charleston, SC 29403 · NAICS 237990 ENDIST Charleston Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors