Demolition, Removal, and Remediation
Closed Solicitation Posted
- Solicitation number
- 6913G626Q300044
- Agency
-
Immediate Office of the Secretary of Transportation
Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238910 Site Preparation Contractors
- PSC
- F999 Other Environmental Services
- Place of performance
- Glens Falls, New York 12801, United States
- Points of contact
-
- Roland Regan roland.regan@dot.gov (617) 494-3185
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Transportation's Volpe National Transportation Systems Center, on behalf of the Federal Aviation Administration, seeks demolition, removal, and restoration services at a VOR facility in Glens Falls, New York, with quotations due August 4, 2026 at 1:00 PM Eastern Time. This is a women-owned small business set-aside under NAICS 238910.
Place of performance is Glens Falls, New York. Work is limited to 8:00 a.m. to 4:30 p.m., Monday through Friday, excluding weekends and government holidays unless approved by the Contracting Officer's Representative. The period of performance runs from award through September 30, 2026.
The scope requires submission of a draft Demolition, Removal, and Restoration Work Plan within 10 business days after a kickoff meeting, followed by a final plan five business days after government review. The Work Plan must address technical approach, schedule, site safety and health precautions, risk management, and permit requirements. Contractors must perform demolition and removal of on-site structures while managing asbestos-containing materials in floor tile, mastic, black roofing material, and fire door insulation, and lead-based paint on vent hoods and antennas. Site restoration includes compacting fill material to 95 percent and re-grading. A closeout memo with waste manifests, disposal documentation, laboratory results, and before/after photographs is due 10 business days after demobilization or 5 business days after receiving disposal paperwork. All contractor travel costs are included in the fixed price. Contractors must obtain required permits and submit copies as appendices to the Work Plan.
Award will be made on best-value basis evaluating pricing and cost buildup, schedule, and a two-page technical narrative demonstrating understanding and competence, in descending order of importance. CLIN 00100 will be fully funded at award. Questions are due July 28, 2026 at 3:00 PM Eastern Time. The Service Contract Act Wage Determination 2015-4151, Revision 31 (effective May 13, 2026) applies, with prevailing wage rates for Warren and Washington Counties, New York, ranging from $13.07 to $55.11 per hour, plus mandatory fringe benefits including health and welfare contributions and paid leave.
Notice text
The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey report for the facility scheduled for demolition.
The Work Plan shall describe methods and procedures for dismantling, demolishing, and/or removing structures and equipment designated for disposal, and restoration of the site listed in Section 1.1. Site-specific information is detailed in Section 5.0 Proposed Scope of Work subsections B, C and D in the individual site survey report. The Work Plan shall also identify additional material sampling including sampling methods, analysis and quality control as may be required for waste characterization for all sites, if necessary. Disposal methods must be detailed for including the identification of all disposal facilities where waste and/or debris is to be shipped. In addition the work plan shall also identify any required permits needed to perform the work and the contractor shall be responsible for obtaining those permits as required. Copies of the permits shall be attached to the work plan as an appendix.
Additional components of the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a Risk Management Plan that identifies major risks and hazards on the site and discusses ways to minimize these risks. The contractor should expect a 5 business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments.
See SOW for details.