Demolition and Installation of Holy Jim Concrete Crossing

Award Notice Posted

Solicitation number
12-9AB5-18-R-0016
Agency
Awarded
to DRP Construction Company
Set-aside
Total Small Business

Opportunity facts

Contract number
129AB518C0010 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Cleveland National Forest Trabuco Ranger District, California 92124, United States

Notice details come from SAM.gov. Updated .

Notice text

SYNOPSIS FOR RFQ #12-9AB5-18-R-0016

HOLY JIM CROSSING REPLACEMENTS FOR THE CLEVELAND NATIONAL FOREST, LOCATED IN TRABUCO RANGER DISTRICT


This project includes demolition and construction at two stream crossings in Holy Jim Canyon. The objective is to remove the low water crossings and provide replacement structures to allow stream flow within the existing roadway on Holy Jim Canyon Road (6S14) located on the Trabuco Ranger District (TRD) of the Cleveland National Forest. The upper site (Site #2) also includes breaching of 3 small mortar rock check dams. Additionally the project will include associated stream channel restoration work above and below each structure. The structures have been sized to accommodate both stream simulation and the design storm flows. The work to be done includes the procurement and installation of two 20 foot span by 16 foot wide prefabricated concrete bottomless arch culverts with head walls, wingwalls and associated buried rip rap along the culverts and wingwalls. The structure footings will be of cast in place reinforced concrete with stem walls. Additional fill material will be placed to raise the approach road to and from these structures and the asphalt paving will surface the approaches for a distance of 100' at each crossing.


This project provides for the equipment, labor, materials, and services necessary to perform all the work described in the above statement and in compliance with the terms, specifications, drawings and provisions.


A pre-bid tour will be conducted. The Contracting Officer Representative (COR) will provide the date and time of the site visit after the solicitation has been released.


The estimated contract time is 170 calendar days after receipt of Notice to Proceed (NTP). Estimated start work date is July 2, 2018.


The tentative issue date of the solicitation is April 11, 2018 with a closing date of approximately May 10, 2018.


This project is being issued 100% Total Small Business Set-Aside.


Price Magnitude: Between $250K - $400K


NAICS: 237310


PSC: Y1LB


Contracting Office Address:
602 S. Tippecanoe Ave
San Bernardino, CA 92408


Places of Performance:


2.) Parking area at intersection of Trabuco Creek Road and Holy Jim Road located approximately 4.6 miles up Trabuco Creek Road from the intersection with Trabuco Canyon Road (S19)., Orange County, Trabuco Ranger District


Note: Please wait until the solicitation is posted before asking technical questions regarding this requirement. Thank you!

Files

Show all 16

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors