Dale Hollow Cable Tray Replacement

Closed Pre-Solicitation Posted

Solicitation number
W912P519B0008
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Dale Hollow Power Plant 305 Powerhouse Road Celina, Tennessee 38551, United States

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

Added: Jun 04, 2019 7:22 am.

Update #5 ·

Added: May 23, 2019 11:21 am.

Update #4 ·

Amendment 1 is being issued to change the receipt date of vendor questions from 17 May 2019 at 1:00 p.m. Central Time to 7 May 2019 at 1:00 p.m. Central Time..

Update #3 ·

The U.S. Army Corps of Engineers (USACE), Nashville District, intends to issue an Invitation for Bid (IFB) solicitation for a firm fixed price construction contract to remove existing asbestos cable trays and install new metal cable trays in the powerhouse as well as under the roadway at Dale Hollow Dam. The estimated magnitude of this project is between $250,000 and $500,000.

The types of work and skill sets for this requirement are as follows:
a) Demolition; debris and rubbish removal (asbestos and metal);
b) Procurement and installation of new metal cable trays in accordance with NEMA VE1, American Welding Society, ASTM International, the National Association of Architectural Metal Manufacturers and any other relevant standards;
c) Placing existing cables into new metal cable trays;
d) Conduct survey (with licensed surveyor) to establish types of materials and amounts of materials required by the drawings and specifications;
e) Adhere to safety standards when handling hazardous materials and electrical cables;
e) Validate drawings and specifications, including measurements and materials;
f) Communicate with USACE personnel, notify USACE personnel of all revisions made to drawings, and provide final hard-copy drawings and soft-copy drawings (DGN or DWG format extensions) to USACE.


The solicitation and all of its associated documents (plans, specifications, etc.) will be made available on or about Monday, April 22, 2019.


An organized site visit is tentatively scheduled for Tuesday, April 30 2019 at 9:00 a.m. Central Time. Please see the solicitation for additional details as to the meeting place location and time for the site visit. Please note that only those persons who have submitted site visit request forms and been approved will be allowed to attend the site visit. Those persons who attend site visit will be responsible for bringing their own personal protection equipment (i.e. hard hats, safety shoes, safety vests, etc.).


Questions regarding this procurement must be submitted in writing via e-mail to Contract Specialist Kristal Jones at Kristal.R.Jones@usace.army.mil. Please make sure to include the solicitation number and project description in the subject line of the e-mail.

.

Update #2 ·

The U.S. Army Corps of Engineers (USACE), Nashville District, intends to issue an Invitation for Bid (IFB) solicitation for a firm fixed price construction contract to remove existing asbestos cable trays and install new metal cable trays in the powerhouse as well as under the roadway at Dale Hollow Dam. The estimated magnitude of this project is between $250,000 and $500,000.

The types of work and skill sets for this requirement are as follows:
a) Demolition; debris and rubbish removal (asbestos and metal);
b) Procurement and installation of new metal cable trays in accordance with NEMA VE1, American Welding Society, ASTM International, the National Association of Architectural Metal Manufacturers and any other relevant standards;
c) Placing existing cables into new metal cable trays;
d) Conduct survey (with licensed surveyor) to establish types of materials and amounts of materials required by the drawings and specifications;
e) Adhere to safety standards when handling hazardous materials and electrical cables;
e) Validate drawings and specifications, including measurements and materials;
f) Communicate with USACE personnel, notify USACE personnel of all revisions made to drawings, and provide final hard-copy drawings and soft-copy drawings (DGN or DWG format extensions) to USACE.


The solicitation and all of its associated documents (plans, specifications, etc.) will be made available on or about Monday, April 22, 2019.


An organized site visit is tentatively scheduled for Tuesday, April 2019 at 9:00 a.m. Central Time. Please see the solicitation for additional details as to the meeting place location and time for the site visit. Please note that only those persons who have submitted site visit request forms and been approved will be allowed to attend the site visit. Those persons who attend site visit will be responsible for bringing their own personal protection equipment (i.e. hard hats, safety shoes, safety vests, etc.).


Questions regarding this procurement must be submitted in writing via e-mail to Contract Specialist Kristal Jones at Kristal.R.Jones@usace.army.mil. Please make sure to include the solicitation number and project description in the subject line of the e-mail.

.

Update #1 ·

The U.S. Army Corps of Engineers (USACE), Nashville District, intends to issue an Invitation for Bid (IFB) solicitation for a firm fixed price construction contract to remove existing asbestos cable trays and install new metal cable trays in the powerhouse as well as under the roadway at Dale Hollow Dam. The estimated magnitude of this project is between $250,000 and $500,000.

The types of work and skill sets for this requirement are as follows:
a) Demolition; debris and rubbish removal (asbestos and metal);
b) Procurement and installation of new metal cable trays in accordance with NEMA VE1, American Welding Society, ASTM International, the National Association of Architectural Metal Manufacturers and any other relevant standards;
c) Placing existing cables into new metal cable trays;
d) Conduct survey (with licensed surveyor) to establish types of materials and amounts of materials required by the drawings and specifications;
e) Adhere to safety standards when handling hazardous materials and electrical cables;
e) Validate drawings and specifications, including measurements and materials;
f) Communicate with USACE personnel, notify USACE personnel of all revisions made to drawings, and provide final hard-copy drawings and soft-copy drawings (DGN or DWG format extensions) to USACE.


The solicitation and all of its associated documents (plans, specifications, etc.) will be made available on or about Monday, March 4, 2019.


An organized site visit is tentatively scheduled for Tuesday, March 12, 2019. Please see the solicitation for additional details as to the meeting place location and time for the site visit. Please note that only those persons who have submitted site visit request forms and been approved will be allowed to attend the site visit. Those persons who attend site visit will be responsible for bringing their own personal protection equipment (i.e. hard hats, safety shoes, safety vests, etc.).


Questions regarding this procurement must be submitted in writing via e-mail to Contract Specialist Kristal Jones at Kristal.R.Jones@usace.army.mil. Please make sure to include the solicitation number and project description in the subject line of the e-mail.

.

Files

File Type Posted
W912P519B0008_Bid_Abstract.pdf PDF
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_39.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_34.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_19.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_07.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_17.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_41.jpg JPG image
W912P519B000_Amedn3_Appendix_C_Revised_Plans__Page_1.pdf PDF
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_03.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_22.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_11.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_12.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_36.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_26.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_13.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_23.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_02.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_20.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_35.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_43.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_44.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_16.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_24.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_18.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_32.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_28.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_21.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_30.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_15.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_08.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_04.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_38.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_27.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_10.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_40.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_06.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_25.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_33.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_42.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_37.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_05.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_09.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_14.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_29.jpg JPG image
W912P519B0008_Amend3_Appendix_C_Revised_TSpecs_Page_31.jpg JPG image
W912P519B0008_Amend3_Revised_TSpecs.pdf PDF
19B0008_USACE_Site_Visit_SignIn.pdf PDF
19B0008_Vendors_SiteVisit_SignIn.pdf PDF
W912P519B00080003.pdf PDF
W912P519B00080002.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity