Crawford Dam Removal
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 140P6426B0008
- Agency
- Midwest Region National Park Service, Department of the Interior
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KA Repair Or Alteration Of Dams
- Points of contact
-
- Christopher Bauer christopher_bauer@nps.gov (330) 468-2500
Notice details come from SAM.gov. Updated .
About this opportunity
The National Park Service (NPS) Midwest Region is conducting a market survey for the Crawford Dam Removal project at Zion National Park, Utah, seeking construction services for partial removal and disposal of an existing concrete dam and headgate structure along with associated infrastructure improvements. Interested contractors must be registered as small businesses under NAICS code 237990 (Other Heavy and Civil Engineering Construction) with a size standard of $45 million and should carefully evaluate their construction bonding capacities before responding. Key qualifications include firm registration in the System for Award Management (SAM), valid Small Business or other applicable SBA certifications (WOSB, EDWOSB, HUBZone, SDVOSB, ISBEE), and submission of a capability statement addressing bonding limits and company capabilities. This is a pre-solicitation market survey designed to inform the government's acquisition strategy; responses are voluntary with no formal solicitation or award commitment at this stage. All interested firms must submit their qualifications via email to christopher_bauer@nps.gov with the reference number in the subject line by 12:00 PM EST on March 18, 2026, and any future formal solicitation will be posted on SAM.gov.
The procurement carries no set-aside designation, and no incumbent contractors are identified in this preliminary market survey. The anticipated contract value ranges from $1 million to $5 million, with work scope including dam removal and disposal, approximately 300 feet of river regrading, new intake structure construction with fish screen installation, removal of approximately 275 feet of existing CMP pipe and concrete manhole, installation of approximately 285 feet of 18-inch ADS N-12 pipe, concrete turnout box removal, 12-inch flume reseating, 150 feet of boulder embankment rip rap construction, and optional installation of approximately 350 feet of smart ditch. The project encompasses all mobilization, labor, materials, and prime/subcontracting oversight necessary for completion. Contractor responses should include firm name, address, contact information, UEI number, size status, applicable certifications, and a comprehensive capability statement demonstrating bonding capacity and technical qualifications for this civil engineering construction initiative.
Notice text
SOURCES SOUGHT (MARKET SURVEY):
The National Park Service (NPS) is conducting a market survey to determine the interest and capability of contractors for a possible upcoming project. All costs associated with providing information in response to this market survey shall be the responsibility of the firm. Any information submitted is voluntary. The Contracting Officer will make an acquisition strategy determination based on the results of this market survey.
Prime contractors interested in working at Zion National Park, work will consist of:
The Work includes but is not limited to partial removal and disposal of an existing concrete dam and headgate structure comprised of concrete, rock, rebar, regrading of the North Fork Virgin River for a distance of approximately 300 feet, construction of a new intake structure including a fish screen, removal and disposal of approximately 275¿ of existing CMP pipe and concrete manhole, installation of approximately 285¿ of 18¿Ø ADS N-12 pipe (approximately 40¿ to be placed within 24¿Ø CMP pipe), removal of a concrete turnout box, reseating of an existing 12¿ flume, approximately 150 feet of boulder embankment rip rap and (Option 1) installation of approximately 350¿ of smart ditch.
The NAICS code for this project is 237990, Other Heavy and Civil Engineering Construction, with a small business size standard of $45M. The Magnitude of Construction anticipated is between $1M and $5M. Interested contractors should also consider their construction bonding capacities when responding.
Contractor must be registered as a small business under the listed socio-economic categories in SAM (System for Award Management) under NAICS code 237990 to be considered/confirmed.
Overview: This project will include all mobilization, work, labor, and materials to complete this work to include Prime/Subcontracting oversight as follows: The government anticipates that the work will include partial removal and disposal of an existing concrete dam and headgate structure comprised of concrete, rock, rebar, regrading of the North Fork Virgin River for a distance of approximately 300 feet, construction of a new intake structure including a fish screen, removal and disposal of approximately 275¿ of existing CMP pipe and concrete manhole, installation of approximately 285¿ of 18¿Ø ADS N-12 pipe (approximately 40¿ to be placed within 24¿Ø CMP pipe), removal of a concrete turnout box, reseating of an existing 12¿ flume, approximately 150 feet of boulder embankment rip rap and (Option 1) installation of approximately 350¿ of smart ditch. All specifications documents/drawings will be provided if/when the government proceeds with a formal solicitation.
Interested firms must submit the attached Market Research Sources Sought Survey.
This market research is being conducted to acquire additional information about potential contractors that may be interested in performing this work. This is not an invitation for bid (IFB) or request for proposal (RFP) and does not constitute any commitment by the Government to issue any solicitation. All interested firms must respond to future solicitation announcements separately from responses to this market survey. Any solicitation that may be issued will be posted on SAM.gov.
All responses must be submitted via email not later than 1200 EST, March 18, 2026. Email address: christopher_bauer@nps.gov. Include the reference number (140P6426B0008) in the subject line.
Attachments
| File | Type | Posted |
|---|---|---|
| MR_Sources_Sought_Survey_1.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| ZION- Crawford Dam Removal and Diversion | Award Notice | |
| ZION- Crawford Dam Removal and Diversion | Solicitation | |
| Crawford Dam Removal and Diversion - Zion NP | Pre-Solicitation | |
| Crawford Dam Removal | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity