Correct Campus Safety Deficiencies

Award Notice Posted

Solicitation number
36C26226C0247
Agency
Awarded
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Contract number
36C26226C0247-36C26226C0247
NAICS code
541330 Engineering Services
PSC
C1DA Architect And Engineering- Construction: Hospitals And Infirmaries
Place of performance
Albuquerque, New Mexico 87108, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Veterans Health Administration awarded a contract to SPUR DESIGN, LLC on August 18, 2026, for correction of campus safety deficiencies at Building 41 of the New Mexico VA Healthcare System in Albuquerque, New Mexico, with a contract value of $145,184.

The work addresses fire-safety and life-safety code deficiencies in the interstitial floor levels of Building 41, a six-story structure with basement built in 1986. Deficiencies identified include architectural and fire protection issues, inaccessible Fire Department Connections on Buildings 41 and 49, and the need for a new post indicator valve near relocated FDCs. The forecasted period of performance is 240 days. The award was made under the Service-Disabled Veteran-Owned Small Business set-aside. Contract number 36C26226C0247.

Notice text

A safety deficiencies assessment of Building 41 on the campus of the New Mexico VA Healthcare System (NMVAHCS) located in Albuquerque, New Mexico was performed by the design team. The assessment was focused on the Interstitial Floor Levels for the Fire-Safety and Life Safety items which no longer meet code requirements. The evaluation of deficiencies was based on current code requirements effective at the time of the assessment. Evaluations were performed in the field by the design team with the assistance of the project COR, Derrick Chee, and a Representative of the Facility Safety Office.
Building 41 was built in 1986 and consists of 6 floors above grade and a basement. The Basement and floors 1 through 5 each have interstitial Walk-on Decks above. The basement structure is a concrete slab on grade, and the suspended floors and roof are a composite system with concrete filled metal deck on structural steel beams with steel shear studs. The Interstitial Walk-on Deck system is a lightweight concrete slab on metal deck supported by steel purlins suspended from structural floor or roof above by steel rods.
The assessment determined that there were architectural deficiencies, fire protection deficiencies, that existing Fire Department Connections (FDCs) on Buildings 41 & 49 were inaccessible, and that a new post indicator valve (PIV) should be added near the relocated FDCs. The forecasted duration of the project is 240 days.  Completion of expired C-Period Services.

Awarded contract 36C26226C0247 to SPUR DESIGN, LLC for 145184.00 on 2026-08-18.