Cooling Tower Condenser Pump
Closed Pre-Solicitation Posted
- Solicitation number
- FA302225Q0311
- Agency
-
Air Education and Training Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- Columbus, Mississippi 39705, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Air Education and Training Command is seeking a contractor to replace a cooling tower condenser pump at Columbus Air Force Base in Mississippi. The project requires a comprehensive service involving removal of an existing non-functioning centrifugal pump and installation of a new Bell & Gossett Series HSC3 pump with specific performance specifications. The contractor must provide all necessary labor, materials, equipment, and transportation to complete the work according to the detailed Statement of Work and project requirements. This is currently a Sources Sought pre-solicitation notice, meaning no immediate contract will be awarded, but the government is assessing potential contractor capabilities. The opportunity is posted with a response deadline of June 10, 2025, and falls under the Plumbing, Heating, and Air-Conditioning Contractors NAICS category (238220).
The contract opportunity is set aside exclusively for small businesses and categorized under the Product Service Code J043 for maintenance and repair of pumps and compressors. The project has a defined 30-day period of performance and requires comprehensive system testing, pressure and leak assessments, and submission of final documentation including operations and maintenance manuals. While no specific award value is mentioned, the scope involves replacing a critical infrastructure component at Building 268 of the air base. The contractor will be responsible for ensuring proper pipe and connection alignment, conducting system tests, and complying with all safety and environmental regulations. The government will retain and salvage the existing pump's motor prior to the new installation, indicating a strategic approach to equipment management.
Notice text
The contractor must provide all labor, material, equipment, and transportation required to place a condenser pump circulating condenser water from the cooling towers supporting building 268 of Columbus AFB, MS. Perform all work according to the Statement of Work (SOW), the Project Image Document, and all related AF requirements and other codes and references.
This is a Sources Sought. No contract will be awarded off this post.
Files
| File | Type | Posted |
|---|---|---|
| ATT 1 - Statement of Work.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WPAFB 3rd Air Stream/ B18 | ENDIST Louisville | No set-aside | |
| Troubleshoot & Repair of Portable Chillers Service Requirement | Air Education and Training Command | Total Small Business | |
| Pump, cooling system, EN | Land and Maritime | Total Small Business | |
| Cooling Water System Repair and Reliability Project | ENDIST Omaha | No set-aside | |
| Repair Mechanical Systems IDIQ (FY 27-32) | AFLCMC Wright Patterson AFB | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity