Convert Steam to Hot Water Distribution, M-Plant, B. 1391

Closed Solicitation Posted

Solicitation number
W912DS-16-R-0017
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Thule Air Base GRL

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

:: Amendment 0002 to W912DS-16-R-0017 is hereby posted. ::

Update #4 ·

:: Amendment 0002 to W912DS-16-R-0017 is hereby posted. ::

Update #3 ·

:: Amendment 0001 to W912DS-16-R-0017 is hereby posted. ::

Update #2 ·

:: Solicitation Package for W912DS-16-R-0017 is hereby posted. ::

Update #1 ·

NOTE: THIS SOLICITATION AND AWARD IS RESTRICTED IN ACCORDANCE WITH 10 U.S.C. 2304(C)(4) INTERNATIONAL AGREEMENT, TO DANISH AND GREENLANDIC FIRMS ONLY.

 

The U.S. Army Corps of Engineers, New York District intends to issue a Request for Proposal (RFP), design-build solicitation package seeking to award a low-price, technically-acceptable, firm-fixed price contract, for the design and construction of the conversion of three existing steam producing exhaust gas boilers to a hot water distribution system. The scope includes switching out piping, installing new controls & monitoring systems, distribution pumps, installing a water treatment system and an associated pressure expansion tank.

The construction season is short at Thule Air Base. General Conditions at Thule Air Base are as follows: the location of Thule Air Base limits exterior work to the months of June through September, although work is sometimes possible in May or October. Additionally, Thule's location demands that all supplies & personnel must be shipped and/or transported, in or out, via air and/or sealift. Thule Air Base is not a commercial air/sea port and there is no other access. Shipping schedules are dictated by Defense contracts, and materials and labor are not available locally. The region is glaciated and the existing soil is generally permafrost, which exists from 1 to 6 feet below the surface and to a measured depth of 1,600 feet. Average winter temperature is 20-30 degrees F below zero while average summer temperature is 40-50 degrees F above zero. One annual military cargo sealift departs from Norfolk, Virginia to Thule AB, approximately 1 July. There are two sealifts that go from Copenhagen, Denmark to Thule AB, one in July & one in August. Airlifting any materials or equipment via military aircraft is very expensive and only on an emergency-need basis.

It is anticipated that the RFP will be issued on or about 4 Aug 2016 and the proposals will be due on or about 30 days later. The evaluation criteria will be as follows: Factor 1- Past Experience, Factor 2 - Past Performance and Factor 3 - Qualifications of the lead mechanical engineer.

The period of performance for this project is 420 calendar days from the Notice to Proceed date. The specifications will be posted electronically via the Federal Business Opportunity website at www.fbo.gov.

The magnitude of this construction is between $1 million and $5 million.

Proposals will be submitted to the U.S. Army Corps of Engineers, Contracting Division, Room 1843, 26 Federal Plaza, New York, New York 10278. All questions must be submitted in writing via email (Microsoft word format) to the Contract Specialist. The media selected for the issuance of this solicitation and amendments shall solely be at the discretion of the Government; accordingly, the media utilized for this project are the Internet. Paper copies of this solicitation, and amendments, if any, will not be available or issued. In accordance with DFARS 252.204-7007, all vendors who want access to the solicitation must be registered with System for Award Management (SAM), located at https://www.sam.gov/portal/public/SAM/ , and Federal Business Opportunity (FedBizOps), located at http://www.fbo.gov, in order to safeguard acquisition related information for all Federal Agencies. Interested parties may download and print the solicitation at no charge from the FedBizOps website http://www.fbo.gov. Some contractor tools are as follows:

1. Register to receive Notification and;
2. Subscribe to the Mailing List for specific solicitations at www.fedbizopps.gov or utilize the Vendor Notification Service in ASFI (https://acquisition.army.mil/asfi).

A hyperlink posted in FedBizOps will direct vendors for downloads for solicitations, plans, specifications and amendments. Check www.fbo.gov frequently for information and updates. Project specification files and drawings are portable document files (PDF).

The Office of the Under Secretary of Defense (Acquisition Technology & Logistics (OUSD{AT&L}) A Guide to Collection & Use of Past Performance Information dated 2003 and FAR Part 36 requires the collection and use of past performance information (PPI) in acquiring best-value goods and services. FAR Subpart 36.3 and DFARS Subpart 236.2 mandates the use of Construction Contractor Appraisal Support System (CCASS) by all DoD agencies for construction contracts greater than or equal to $650,000 or more than $10,000 if the contract was terminated for default. CCASS is a module of the Contractor Performance Assessment Reporting System (CPARS) and is located at http://www.cpars.csd.disa.mil.

Point of Contact is Alex Heinzel, Contract Specialist, U.S. Army Corps of Engineers, New York District, 26 Federal Plaza, Room 1843, New York, 10278-0090, Phone: 917-790-8087 or via email alexander.t.heinzel@usace.army.mil

 

Files

File Type Posted
W912DS-16-R-0017-0002.pdf PDF
Appendix_J_-_Installation_HAZMAT_Management_Plan.pdf PDF
Appendix_I_-_Slug_Mgmt_Plan.pdf PDF
Appendix_A_-_Active_Landfills.pdf PDF
Appendix_F_-_PPM_Plan.pdf PDF
Appendix_L_-_Affirmative_Proc_Plan.pdf PDF
Appendix_M_-_PCB_Repl_Plan.pdf PDF
Appendix_C_-_Natural_Resources_Management_Plan.pdf PDF
Appendix_D_-_HWM_Plan.pdf PDF
Appendix_P_-_FY17_Sealift_Rates.pdf PDF
Appendix_O_-_Lead_Paint_Mgmt_Plan.pdf PDF
01_10_10_-_Specs_-_Amendment__1.pdf PDF
Appendix_R_-_DBA_Waiver.pdf PDF
W912DS-16-R-0017-0001.pdf PDF
Appendix_H_-_Storm_Water_Mgmt_Plan.pdf PDF
Appendix_N_-_Asbestos_Mgmt_Plan.pdf PDF
Appendix_G_-_Solid_Waste_Mgmt_Plan.pdf PDF
App_AA_Drawings_Thule_Dist_Heating_-_Amendment_1.pdf PDF
Appendix_E_-_Spill_Prevention-Response_Plan.pdf PDF
Appendix_T_(add)_-_Additional_M-Plant_As-Builds.pdf PDF
Appendix_CC_-_Thule_M-Plant_-_Exsiting_Photos.pdf PDF
W912DS-16-R-0017.pdf PDF
Appendix_BB_-_Product_Data_Sheets_Smartline_HW_tank.pdf PDF
Appendix_DD_-_Thule_M-Plant_Site_Visit_Summary_Notes_(2016-08-08)_.pdf PDF
Appendices_A_through_S.pdf PDF
Package_1_-_M-Plant_Steam_to_Hot_Water_-_RFP_-_16_Aug_16.pdf PDF
Appendix_AA_-_Drawings_Thule_Dist_Heating.pdf PDF
Appendix_T_-_As-Build_Drawings.pdf PDF
Show all 28

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors