Construction two projects within the 99TH RD’s A04 region
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W15QKN-24-R-5076
- Agency
- ACC Picatinny Army Contracting Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- Not on record
- PSC
- Z1AA Maintenance Of Office Buildings
- Place of performance
- Worcester, Massachusetts, United States
- Points of contact
-
- Jonathan Krakower jonathan.p.krakower.civ@army.mil (520) 687-5577
- Edward Sherwood edward.l.sherwood4.civ@army.mil (917) 790-8087
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Contracting Command - New Jersey has issued a Pre-Solicitation Notice for two new construction projects in support of the U.S. Army's 99th Readiness Division, located within the A04 Region. The first project, CSS 89275, requires the removal of an exterior orphaned chimney, excavation of an area with water intrusion, and sealing of cracks in roadways at the Lincoln W. Stoddard facility in Worcester, MA. The second project, CSS 89313, involves the installation of basement stair coverings at the same location to prevent water from entering the basement. Contractors must provide all necessary plant, labor, equipment, tools, materials, supervision, and transportation to complete the required work. The projects will be evaluated based on the contractor's ability to comply with federal regulations, maintain a safe worksite, coordinate with the facility, and properly dispose of any hazardous waste. The due date for responses is August 22, 2024.
This opportunity is not set-aside for any specific business type. The Pre-Solicitation Notice does not indicate any potential incumbents or current contractors. The notice also does not provide any details on the potential award value or budget range for these projects. The only numerical details given are the 60-calendar day period of performance for the chimney removal project and the 120-calendar day period of performance for the stair covering installation project.
Notice text
The U.S. Army Contracting Command – New Jersey has two (2) new construction requirements in support of the U.S. Army’s 99th Readiness Division. These projects are located within the 99th RD’s A04 Region.
CSS 89275 – Remove exterior orphaned chimney, excavate area along building where water intrusion is occurring and seal cracks in roadways at Lincoln W Stoddard located at 25 North Lake Ave, Worcester, MA(MA022).
- Description of Services: The Contractor shall provide all plant, labor, equipment, tools, materials, supervision, and transportation to accomplish the following work which consist of but is not limited to removal of dilapidated chimney to avoid potential collapse.
CSS 89313 – Install basement stair coverings at the Lincoln W. Stoddard USARC located at 25 North Lake Ave, Worcester, MA(MA022).
- Description of Services: The Contractor shall provide all plant, labor, equipment, tools, materials, supervision, and transportation to accomplish the following work which consist of but is not limited to have dry and clear of debris in 2 stairwells preventing water from entering the basement.
Attachments
| File | Type | Posted |
|---|---|---|
| MA022-WORCESTER-A4-CSS 89275-SOW-Remove ChimneyV2 (DRAFT).docx | DOCX document | |
| MA022-Worcester-A4-CSS 89313-SOW-Basement Stair CoveringsV2 (DRAFT).docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| CSS 89275 and CSS 89313 | Award Notice | |
| CSS 89275 and CSS 89313 | Solicitation | |
| Construction two projects within the 99TH RD’s A04 region | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity