Construction Services for the Franklin D. Roosevelt Presidential Library and Museum Building Renovation Phase 2, Hyde Park, NY 12538
Award Notice Posted
- Solicitation number
- NAMA-11-SEM-0001
- Awarded
- to Consigli Construction NY, LLC
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- NAMA-BF-12-M-0002 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- Franklin D. Roosevelt Presidential Library and Museum 4079 Albany Post Road . Hyde Park, New York 12538, United States
Notice details come from SAM.gov. Updated .
Notice text
The National Archives and Records Administration (NARA) announce intent to issue a Request for Proposal (RFP) in a negotiated procurement for Construction Services for the Franklin D. Roosevelt Presidential Library and Museum Building Renovation - Phase 2, Hyde Park, NY 12538.
This procurement utilizes a "best value" source selection process to enable NARA to select from among high quality contractors for this procurement. Experience, Past Performance, Key Personnel, Management Plan & Schedule are factors considered with price in determining which contractor is selected for the project.
The Contract is for a renovation of approximately 40, 000 square feet in the existing Library and Museum and Visitor Center buildings. This project includes but not limited to (1) Demolition; (2) Architectural; (3) Civil; (4) Structural; (5) Mechanical; (6) Electrical; (7) Fire Protection; and (8) Security; as indicated on the drawings.
The intent is to AWARD a GeneralConstruction Contract.
The construction is in an existing Library and Visitor Center and surrounding site. The entire site and buildings will be occupied and must remain operational during the work. Contractor must plan and schedule work to maintain full services to all occupied areas.
Estimated construction cost range for the Base is $7,000,000 to $10,000,000 dollars.
Contractor must provide all management, supervision, labor, materials, supplies, and equipment (except as otherwise provided), and must plan, schedule, coordinate and assure effective performance of all construction to meet NARA requirements. The Contractor will perform the construction in accordance with the design specifications, drawings, and the provisions of the contract. One construction contract will be awarded based on Technical Evaluation Factors and Price specified in the RFP. Competitive Source Selection procedures will be used in accordance with FAR 15. The contract will be firm fixed price. The tradeoff process is the method that will be used to evaluate price and other factors specified in the Solicitation, with the goals and objectives being to select the proposal that offers the best value to the Government in terms of performance, quality and pricing.
The Technical Evaluation Factors are: EXPERIENCE (40%). The offeror must demonstrate its experience as a Contractor responsible for the construction of at least four (4) similar projects, within the past fifteen (15) years. Similar project is defined as a project that is comparable in nature, type and complexity to the project in this solicitation, and meets all three (3) of the following characteristic: (a) construction was a renovation (preferred Historic, National Register OR eligible structure) that included demolition, civil, mechanical, electrical, fire protection, security and architectural systems; (b) the project was not less that 20,000 gross square feet OR the construction cost at award was not less than $5,000,000 dollars; (c) Project was performed on an occupied building or site. PAST PERFORMANCE (20%) The offeror must have satisfactory performance as a Contractor responsible for the substantially complete construction of at least two (2) similar projects, within the past five (5) years. KEY PERSONNEL (15%) The offeror must identify the individuals and their experience proposed for the following positions: Project Manager, General Superintendent, and Quality Control Supervisor. MANAGEMENT PLAN & SCHEDULE (20%) Offeror shall provide contract duration at the completion of which all work must be substantially complete as determined by the Contracting Officer. Specified duration must be based on a project schedule that demonstrates the project can be completed within the specified duration. Under no circumstances can the total project exceed 540 days (18 months). SUBCONTACTING PLAN (5%) .
Technical evaluation factors when combined are equal to price. The NAICS number is 236220 and the Small Business Size standard is $33.5 million. To facilitate offer preparation and government review, an RFP will be available for issuance on or about 06/03/2011 and will be Due on or about 08/05/2011.
The Technical Proposal shall respond to the following evaluation factors as noted above: Experience, Past Performance, Key Personnel, Management Plan & Schedule.
The Pricing Proposal shall respond to the Section A SF1442, Section B Pricing, Reps and Certs, and the Subcontracting Plan (if applicable).
The RFP Volume I, Uniform Contract Format Sections A through M, andthe RFP Volume II, Project Manual (Technical Specifications and Drawings) will be issued by Electronic files uploaded to this website.
This is the pre-solicitation notice, not the RFP.
Files
| File | Type | Posted |
|---|---|---|
| FDR Phase 2 Solicitation Amendment 2.zip | ZIP file | |
| Amendment02 SF30.xls | XLS spreadsheet | |
| NARA FDR Document Download Instructions-Rev 110630.pdf | ||
| FDR Phase 2 Solicitation Amendment 1.zip | ZIP file | |
| FDR_Ph_2_Q A_110715.pdf | ||
| Amendment01 SF30.xls | XLS spreadsheet | |
| Phase 2 Drawings Vol 1 | — | |
| NARA FDR Document Download Instructions.pdf | ||
| Phase 2 Specifications Zip.zip | ZIP file | |
| Reference Materials Zip.zip | ZIP file | |
| Phase 2 Drawings Vol 4 | — | |
| Phase 2 RFP Sections A-M.zip | ZIP file | |
| Phase 2 Drawings Vol 3 | — | |
| Phase 2 Drawings Vol 2 | — |
Show all 14
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity