Construction of fort greely communications center, fort greely, alaska (FTG233)
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W911KB21R0004
- Agency
-
ENDIST Alaska
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Fort Greely AK 99731 USA
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Engineering District Alaska seeks to award a firm fixed-price design-build contract for the construction of a communications center at Fort Greely, Alaska. The project includes constructing an 11,500 square foot facility with electromagnetic pulse protection, seismic and nuclear/biological/chemical survivability features. Additional work includes installing communications duct banks connecting the facility to missile fields and other critical infrastructure. Proposals are due by November 13, 2020 and will be evaluated on specialized experience, past performance, project schedule, technical approach, organization, small business participation, and price. The anticipated notice to proceed date is March 15, 2021 with a required completion date of September 30, 2022.
The solicitation has no set-aside designations. The primary NAICS code is 237990 and PSC code is S206. The estimated value is between $25-100 million. Work will be performed at Fort Greely, Alaska 99731 and includes fully designing and constructing the facility along with extensive site work by the specified completion date.
Notice text
10 versions
Update #10 · Latest ·
This is a Full and Open Request for Proposal (RFP) for a Design-Bid-Build Construction of a Communications Center at Fort Greely, Alaska. The procurement will be conducted using single phase source selection tradeoff process described in FAR 15.101-1. The award will be based on the best overall value to the Government considering the non-price factors described in the RFP and price. The Government will evaluate proposals in accordance with the evaluation rating systems outlined in the selection procedures of the RFP. Any resulting contract will be firm fixed price. The anticipated Notice to Proceed date is 15 March 2021 with a construction completion date no later than 30 September 2022.
The Fort Greely Communications Center will provide a new communications capability to provide the Warfighter with a redundant capability at the Missile Defense Integration & Operations Center (MDIOC) utilizing communications which are separate and independent of the existing Readiness and Control Building (RCB). This fully designed facility includes High Altitude Electromagnetic Pulse (HEMP), Electromagnetic Interference (EMI), Nuclear Biological and Chemical Contamination Survivability (NBCCS), ballistic protection and seismic Risk Category V features. This project also includes an extensive amount of site work to include the installation of communications duct banks throughout the Missile Defense Complex (MDC) which interface with the Missile Fields and Readiness and Control Building. There will be several power and communication interfaces with existing mission critical facilities within the MDC.
Potential offerors are advised that the Request for Proposal is available for download via the Beta SAM website; however due to the large size of the files for the Plans and Specifications, Offerors are required to provide the name, e-mail address, and phone number of their selected point of contact (POC) to the Contract Specialist, Melissa Lynn via e-mail at: melissa.k.lynn@usace.army.mil, phone number: 907 753-2894 in order to have their name added for access to the Plans and Specifications uploaded to the DOD Safe site. The deadline for submission of POC information to request the Plans, Drawings and Specifications is 07 October 2020 by 2:00PM Alaska Time. Offerors who have responded by the deadline with POC information will be provided the RFP specifications and drawings via the DOD Safe Website starting on the release date of the solicitation. All notifications of changes to this solicitation shall be made through the internet only (Beta SAM). It is the offeror’s responsibility to check for any posted changes to this solicitation.
Request to attend the Site Visit must be submitted to the RFP POCs in accordance with Section 00 21 00, paragraph 1.8 in the Amendment 01, posted 06 OCT 2020.
VIRTUAL PRE-PROPOSAL MEETING, 14 OCTOBER 2020 at 0800 AKST (SLIDES ATTACHED)
JOIN MICROSOFT TEAMS MEETING -
https://teams.microsoft.com/l/meetup-join/19:meeting_NjIwZWRmNmEtZjA5NS00OTM3LTk1NDUtOWQ4Mjg2NDE2MWUx@thread.v2/0?context={"Tid":"7a53b4fc-e87d-4c46-9972-0570ac271b27","Oid":"9c9adc41-9889-4d37-b4b0-ffd76d8a7083"}
+1 913-278-0791 United States, Kansas City (Toll)
Conference ID: 579 582 649#
POC - MELISSA LYNN (907)753-2894, melissa.k.lynn@usace.army.mil OR JASON WILSON (719)721-1906, jason.f.wilson@usace.army.mil
AMENDMENT #03 - POSTED 20 OCTOBER 2020
AMENDMENT #04 - POSTED 27 OCTOBER 2020
AMENDMENT #05 - POSTED 02 NOVEMBER 2020
AMENDMENT #06 - POSTED 03 NOVEMBER 2020
AMENDMENT #07 - POSTED 05 NOVEMBER 2020
AMENDMENT #08 - POSTED 09 NOVEMBER 2020
Update #9 ·
This is a Full and Open Request for Proposal (RFP) for a Design-Bid-Build Construction of a Communications Center at Fort Greely, Alaska. The procurement will be conducted using single phase source selection tradeoff process described in FAR 15.101-1. The award will be based on the best overall value to the Government considering the non-price factors described in the RFP and price. The Government will evaluate proposals in accordance with the evaluation rating systems outlined in the selection procedures of the RFP. Any resulting contract will be firm fixed price. The anticipated Notice to Proceed date is 15 March 2021 with a construction completion date no later than 30 September 2022.
The Fort Greely Communications Center will provide a new communications capability to provide the Warfighter with a redundant capability at the Missile Defense Integration & Operations Center (MDIOC) utilizing communications which are separate and independent of the existing Readiness and Control Building (RCB). This fully designed facility includes High Altitude Electromagnetic Pulse (HEMP), Electromagnetic Interference (EMI), Nuclear Biological and Chemical Contamination Survivability (NBCCS), ballistic protection and seismic Risk Category V features. This project also includes an extensive amount of site work to include the installation of communications duct banks throughout the Missile Defense Complex (MDC) which interface with the Missile Fields and Readiness and Control Building. There will be several power and communication interfaces with existing mission critical facilities within the MDC.
Potential offerors are advised that the Request for Proposal is available for download via the Beta SAM website; however due to the large size of the files for the Plans and Specifications, Offerors are required to provide the name, e-mail address, and phone number of their selected point of contact (POC) to the Contract Specialist, Melissa Lynn via e-mail at: melissa.k.lynn@usace.army.mil, phone number: 907 753-2894 in order to have their name added for access to the Plans and Specifications uploaded to the DOD Safe site. The deadline for submission of POC information to request the Plans, Drawings and Specifications is 07 October 2020 by 2:00PM Alaska Time. Offerors who have responded by the deadline with POC information will be provided the RFP specifications and drawings via the DOD Safe Website starting on the release date of the solicitation. All notifications of changes to this solicitation shall be made through the internet only (Beta SAM). It is the offeror’s responsibility to check for any posted changes to this solicitation.
Request to attend the Site Visit must be submitted to the RFP POCs in accordance with Section 00 21 00, paragraph 1.8 in the Amendment 01, posted 06 OCT 2020.
VIRTUAL PRE-PROPOSAL MEETING, 14 OCTOBER 2020 at 0800 AKST (SLIDES ATTACHED)
JOIN MICROSOFT TEAMS MEETING -
https://teams.microsoft.com/l/meetup-join/19:meeting_NjIwZWRmNmEtZjA5NS00OTM3LTk1NDUtOWQ4Mjg2NDE2MWUx@thread.v2/0?context={"Tid":"7a53b4fc-e87d-4c46-9972-0570ac271b27","Oid":"9c9adc41-9889-4d37-b4b0-ffd76d8a7083"}
+1 913-278-0791 United States, Kansas City (Toll)
Conference ID: 579 582 649#
POC - MELISSA LYNN (907)753-2894, melissa.k.lynn@usace.army.mil OR JASON WILSON (719)721-1906, jason.f.wilson@usace.army.mil
AMENDMENT #03 - POSTED 20 OCTOBER 2020
AMENDMENT #04 - POSTED 27 OCTOBER 2020
AMENDMENT #05 - POSTED 02 NOVEMBER 2020
AMENDMENT #06 - POSTED 03 NOVEMBER 2020
AMENDMENT #07 - POSTED 05 NOVEMBER 2020
Update #8 ·
This is a Full and Open Request for Proposal (RFP) for a Design-Bid-Build Construction of a Communications Center at Fort Greely, Alaska. The procurement will be conducted using single phase source selection tradeoff process described in FAR 15.101-1. The award will be based on the best overall value to the Government considering the non-price factors described in the RFP and price. The Government will evaluate proposals in accordance with the evaluation rating systems outlined in the selection procedures of the RFP. Any resulting contract will be firm fixed price. The anticipated Notice to Proceed date is 15 March 2021 with a construction completion date no later than 30 September 2022.
The Fort Greely Communications Center will provide a new communications capability to provide the Warfighter with a redundant capability at the Missile Defense Integration & Operations Center (MDIOC) utilizing communications which are separate and independent of the existing Readiness and Control Building (RCB). This fully designed facility includes High Altitude Electromagnetic Pulse (HEMP), Electromagnetic Interference (EMI), Nuclear Biological and Chemical Contamination Survivability (NBCCS), ballistic protection and seismic Risk Category V features. This project also includes an extensive amount of site work to include the installation of communications duct banks throughout the Missile Defense Complex (MDC) which interface with the Missile Fields and Readiness and Control Building. There will be several power and communication interfaces with existing mission critical facilities within the MDC.
Potential offerors are advised that the Request for Proposal is available for download via the Beta SAM website; however due to the large size of the files for the Plans and Specifications, Offerors are required to provide the name, e-mail address, and phone number of their selected point of contact (POC) to the Contract Specialist, Melissa Lynn via e-mail at: melissa.k.lynn@usace.army.mil, phone number: 907 753-2894 in order to have their name added for access to the Plans and Specifications uploaded to the DOD Safe site. The deadline for submission of POC information to request the Plans, Drawings and Specifications is 07 October 2020 by 2:00PM Alaska Time. Offerors who have responded by the deadline with POC information will be provided the RFP specifications and drawings via the DOD Safe Website starting on the release date of the solicitation. All notifications of changes to this solicitation shall be made through the internet only (Beta SAM). It is the offeror’s responsibility to check for any posted changes to this solicitation.
Request to attend the Site Visit must be submitted to the RFP POCs in accordance with Section 00 21 00, paragraph 1.8 in the Amendment 01, posted 06 OCT 2020.
VIRTUAL PRE-PROPOSAL MEETING, 14 OCTOBER 2020 at 0800 AKST (SLIDES ATTACHED)
JOIN MICROSOFT TEAMS MEETING -
https://teams.microsoft.com/l/meetup-join/19:meeting_NjIwZWRmNmEtZjA5NS00OTM3LTk1NDUtOWQ4Mjg2NDE2MWUx@thread.v2/0?context={"Tid":"7a53b4fc-e87d-4c46-9972-0570ac271b27","Oid":"9c9adc41-9889-4d37-b4b0-ffd76d8a7083"}
+1 913-278-0791 United States, Kansas City (Toll)
Conference ID: 579 582 649#
POC - MELISSA LYNN (907)753-2894, melissa.k.lynn@usace.army.mil OR JASON WILSON (719)721-1906, jason.f.wilson@usace.army.mil
AMENDMENT #03 - POSTED 20 OCTOBER 2020
AMENDMENT #04 - POSTED 27 OCTOBER 2020
AMENDMENT #05 - POSTED 02 NOVEMBER 2020
AMENDMENT #06 - POSTED 03 NOVEMBER 2020
Update #7 ·
This is a Full and Open Request for Proposal (RFP) for a Design-Bid-Build Construction of a Communications Center at Fort Greely, Alaska. The procurement will be conducted using single phase source selection tradeoff process described in FAR 15.101-1. The award will be based on the best overall value to the Government considering the non-price factors described in the RFP and price. The Government will evaluate proposals in accordance with the evaluation rating systems outlined in the selection procedures of the RFP. Any resulting contract will be firm fixed price. The anticipated Notice to Proceed date is 15 March 2021 with a construction completion date no later than 30 September 2022.
The Fort Greely Communications Center will provide a new communications capability to provide the Warfighter with a redundant capability at the Missile Defense Integration & Operations Center (MDIOC) utilizing communications which are separate and independent of the existing Readiness and Control Building (RCB). This fully designed facility includes High Altitude Electromagnetic Pulse (HEMP), Electromagnetic Interference (EMI), Nuclear Biological and Chemical Contamination Survivability (NBCCS), ballistic protection and seismic Risk Category V features. This project also includes an extensive amount of site work to include the installation of communications duct banks throughout the Missile Defense Complex (MDC) which interface with the Missile Fields and Readiness and Control Building. There will be several power and communication interfaces with existing mission critical facilities within the MDC.
Potential offerors are advised that the Request for Proposal is available for download via the Beta SAM website; however due to the large size of the files for the Plans and Specifications, Offerors are required to provide the name, e-mail address, and phone number of their selected point of contact (POC) to the Contract Specialist, Melissa Lynn via e-mail at: melissa.k.lynn@usace.army.mil, phone number: 907 753-2894 in order to have their name added for access to the Plans and Specifications uploaded to the DOD Safe site. The deadline for submission of POC information to request the Plans, Drawings and Specifications is 07 October 2020 by 2:00PM Alaska Time. Offerors who have responded by the deadline with POC information will be provided the RFP specifications and drawings via the DOD Safe Website starting on the release date of the solicitation. All notifications of changes to this solicitation shall be made through the internet only (Beta SAM). It is the offeror’s responsibility to check for any posted changes to this solicitation.
Request to attend the Site Visit must be submitted to the RFP POCs in accordance with Section 00 21 00, paragraph 1.8 in the Amendment 01, posted 06 OCT 2020.
VIRTUAL PRE-PROPOSAL MEETING, 14 OCTOBER 2020 at 0800 AKST (SLIDES ATTACHED)
JOIN MICROSOFT TEAMS MEETING -
https://teams.microsoft.com/l/meetup-join/19:meeting_NjIwZWRmNmEtZjA5NS00OTM3LTk1NDUtOWQ4Mjg2NDE2MWUx@thread.v2/0?context={"Tid":"7a53b4fc-e87d-4c46-9972-0570ac271b27","Oid":"9c9adc41-9889-4d37-b4b0-ffd76d8a7083"}
+1 913-278-0791 United States, Kansas City (Toll)
Conference ID: 579 582 649#
POC - MELISSA LYNN (907)753-2894, melissa.k.lynn@usace.army.mil OR JASON WILSON (719)721-1906, jason.f.wilson@usace.army.mil
AMENDMENT #03 - POSTED 20 OCTOBER 2020
AMENDMENT #04 - POSTED 27 OCTOBER 2020
AMENDMENT #05 - POSTED 02 NOVEMBER 2020
Update #6 ·
This is a Full and Open Request for Proposal (RFP) for a Design-Bid-Build Construction of a Communications Center at Fort Greely, Alaska. The procurement will be conducted using single phase source selection tradeoff process described in FAR 15.101-1. The award will be based on the best overall value to the Government considering the non-price factors described in the RFP and price. The Government will evaluate proposals in accordance with the evaluation rating systems outlined in the selection procedures of the RFP. Any resulting contract will be firm fixed price. The anticipated Notice to Proceed date is 15 March 2021 with a construction completion date no later than 30 September 2022.
The Fort Greely Communications Center will provide a new communications capability to provide the Warfighter with a redundant capability at the Missile Defense Integration & Operations Center (MDIOC) utilizing communications which are separate and independent of the existing Readiness and Control Building (RCB). This fully designed facility includes High Altitude Electromagnetic Pulse (HEMP), Electromagnetic Interference (EMI), Nuclear Biological and Chemical Contamination Survivability (NBCCS), ballistic protection and seismic Risk Category V features. This project also includes an extensive amount of site work to include the installation of communications duct banks throughout the Missile Defense Complex (MDC) which interface with the Missile Fields and Readiness and Control Building. There will be several power and communication interfaces with existing mission critical facilities within the MDC.
Potential offerors are advised that the Request for Proposal is available for download via the Beta SAM website; however due to the large size of the files for the Plans and Specifications, Offerors are required to provide the name, e-mail address, and phone number of their selected point of contact (POC) to the Contract Specialist, Melissa Lynn via e-mail at: melissa.k.lynn@usace.army.mil, phone number: 907 753-2894 in order to have their name added for access to the Plans and Specifications uploaded to the DOD Safe site. The deadline for submission of POC information to request the Plans, Drawings and Specifications is 07 October 2020 by 2:00PM Alaska Time. Offerors who have responded by the deadline with POC information will be provided the RFP specifications and drawings via the DOD Safe Website starting on the release date of the solicitation. All notifications of changes to this solicitation shall be made through the internet only (Beta SAM). It is the offeror’s responsibility to check for any posted changes to this solicitation.
Request to attend the Site Visit must be submitted to the RFP POCs in accordance with Section 00 21 00, paragraph 1.8 in the Amendment 01, posted 06 OCT 2020.
VIRTUAL PRE-PROPOSAL MEETING, 14 OCTOBER 2020 at 0800 AKST (SLIDES ATTACHED)
JOIN MICROSOFT TEAMS MEETING -
https://teams.microsoft.com/l/meetup-join/19:meeting_NjIwZWRmNmEtZjA5NS00OTM3LTk1NDUtOWQ4Mjg2NDE2MWUx@thread.v2/0?context={"Tid":"7a53b4fc-e87d-4c46-9972-0570ac271b27","Oid":"9c9adc41-9889-4d37-b4b0-ffd76d8a7083"}
+1 913-278-0791 United States, Kansas City (Toll)
Conference ID: 579 582 649#
POC - MELISSA LYNN (907)753-2894, melissa.k.lynn@usace.army.mil OR JASON WILSON (719)721-1906, jason.f.wilson@usace.army.mil
AMENDMENT #03 - POSTED 20 OCTOBER 2020
AMENDMENT #04 - POSTED 27 OCTOBER 2020
Update #5 ·
This is a Full and Open Request for Proposal (RFP) for a Design-Bid-Build Construction of a Communications Center at Fort Greely, Alaska. The procurement will be conducted using single phase source selection tradeoff process described in FAR 15.101-1. The award will be based on the best overall value to the Government considering the non-price factors described in the RFP and price. The Government will evaluate proposals in accordance with the evaluation rating systems outlined in the selection procedures of the RFP. Any resulting contract will be firm fixed price. The anticipated Notice to Proceed date is 15 March 2021 with a construction completion date no later than 30 September 2022.
The Fort Greely Communications Center will provide a new communications capability to provide the Warfighter with a redundant capability at the Missile Defense Integration & Operations Center (MDIOC) utilizing communications which are separate and independent of the existing Readiness and Control Building (RCB). This fully designed facility includes High Altitude Electromagnetic Pulse (HEMP), Electromagnetic Interference (EMI), Nuclear Biological and Chemical Contamination Survivability (NBCCS), ballistic protection and seismic Risk Category V features. This project also includes an extensive amount of site work to include the installation of communications duct banks throughout the Missile Defense Complex (MDC) which interface with the Missile Fields and Readiness and Control Building. There will be several power and communication interfaces with existing mission critical facilities within the MDC.
Potential offerors are advised that the Request for Proposal is available for download via the Beta SAM website; however due to the large size of the files for the Plans and Specifications, Offerors are required to provide the name, e-mail address, and phone number of their selected point of contact (POC) to the Contract Specialist, Melissa Lynn via e-mail at: melissa.k.lynn@usace.army.mil, phone number: 907 753-2894 in order to have their name added for access to the Plans and Specifications uploaded to the DOD Safe site. The deadline for submission of POC information to request the Plans, Drawings and Specifications is 07 October 2020 by 2:00PM Alaska Time. Offerors who have responded by the deadline with POC information will be provided the RFP specifications and drawings via the DOD Safe Website starting on the release date of the solicitation. All notifications of changes to this solicitation shall be made through the internet only (Beta SAM). It is the offeror’s responsibility to check for any posted changes to this solicitation.
Request to attend the Site Visit must be submitted to the RFP POCs in accordance with Section 00 21 00, paragraph 1.8 in the Amendment 01, posted 06 OCT 2020.
VIRTUAL PRE-PROPOSAL MEETING, 14 OCTOBER 2020 at 0800 AKST (SLIDES ATTACHED)
JOIN MICROSOFT TEAMS MEETING -
https://teams.microsoft.com/l/meetup-join/19:meeting_NjIwZWRmNmEtZjA5NS00OTM3LTk1NDUtOWQ4Mjg2NDE2MWUx@thread.v2/0?context={"Tid":"7a53b4fc-e87d-4c46-9972-0570ac271b27","Oid":"9c9adc41-9889-4d37-b4b0-ffd76d8a7083"}
+1 913-278-0791 United States, Kansas City (Toll)
Conference ID: 579 582 649#
POC - MELISSA LYNN (907)753-2894, melissa.k.lynn@usace.army.mil OR JASON WILSON (719)721-1906, jason.f.wilson@usace.army.mil
AMENDMENT #03 - POSTED 20 OCTOBER 2020
Update #4 ·
This is a Full and Open Request for Proposal (RFP) for a Design-Bid-Build Construction of a Communications Center at Fort Greely, Alaska. The procurement will be conducted using single phase source selection tradeoff process described in FAR 15.101-1. The award will be based on the best overall value to the Government considering the non-price factors described in the RFP and price. The Government will evaluate proposals in accordance with the evaluation rating systems outlined in the selection procedures of the RFP. Any resulting contract will be firm fixed price. The anticipated Notice to Proceed date is 15 March 2021 with a construction completion date no later than 30 September 2022.
The Fort Greely Communications Center will provide a new communications capability to provide the Warfighter with a redundant capability at the Missile Defense Integration & Operations Center (MDIOC) utilizing communications which are separate and independent of the existing Readiness and Control Building (RCB). This fully designed facility includes High Altitude Electromagnetic Pulse (HEMP), Electromagnetic Interference (EMI), Nuclear Biological and Chemical Contamination Survivability (NBCCS), ballistic protection and seismic Risk Category V features. This project also includes an extensive amount of site work to include the installation of communications duct banks throughout the Missile Defense Complex (MDC) which interface with the Missile Fields and Readiness and Control Building. There will be several power and communication interfaces with existing mission critical facilities within the MDC.
Potential offerors are advised that the Request for Proposal is available for download via the Beta SAM website; however due to the large size of the files for the Plans and Specifications, Offerors are required to provide the name, e-mail address, and phone number of their selected point of contact (POC) to the Contract Specialist, Melissa Lynn via e-mail at: melissa.k.lynn@usace.army.mil, phone number: 907 753-2894 in order to have their name added for access to the Plans and Specifications uploaded to the DOD Safe site. The deadline for submission of POC information to request the Plans, Drawings and Specifications is 07 October 2020 by 2:00PM Alaska Time. Offerors who have responded by the deadline with POC information will be provided the RFP specifications and drawings via the DOD Safe Website starting on the release date of the solicitation. All notifications of changes to this solicitation shall be made through the internet only (Beta SAM). It is the offeror’s responsibility to check for any posted changes to this solicitation.
Request to attend the Site Visit must be submitted to the RFP POCs in accordance with Section 00 21 00, paragraph 1.8 in the Amendment 01, posted 06 OCT 2020.
VIRTUAL PRE-PROPOSAL MEETING, 14 OCTOBER 2020 at 0800 AKST (SLIDES ATTACHED)
JOIN MICROSOFT TEAMS MEETING -
https://teams.microsoft.com/l/meetup-join/19:meeting_NjIwZWRmNmEtZjA5NS00OTM3LTk1NDUtOWQ4Mjg2NDE2MWUx@thread.v2/0?context={"Tid":"7a53b4fc-e87d-4c46-9972-0570ac271b27","Oid":"9c9adc41-9889-4d37-b4b0-ffd76d8a7083"}
+1 913-278-0791 United States, Kansas City (Toll)
Conference ID: 579 582 649#
POC - MELISSA LYNN (907)753-2894, melissa.k.lynn@usace.army.mil OR JASON WILSON (719)721-1906, jason.f.wilson@usace.army.mil
Update #3 ·
This is a Full and Open Request for Proposal (RFP) for a Design-Bid-Build Construction of a Communications Center at Fort Greely, Alaska. The procurement will be conducted using single phase source selection tradeoff process described in FAR 15.101-1. The award will be based on the best overall value to the Government considering the non-price factors described in the RFP and price. The Government will evaluate proposals in accordance with the evaluation rating systems outlined in the selection procedures of the RFP. Any resulting contract will be firm fixed price. The anticipated Notice to Proceed date is 15 March 2021 with a construction completion date no later than 30 September 2022.
The Fort Greely Communications Center will provide a new communications capability to provide the Warfighter with a redundant capability at the Missile Defense Integration & Operations Center (MDIOC) utilizing communications which are separate and independent of the existing Readiness and Control Building (RCB). This fully designed facility includes High Altitude Electromagnetic Pulse (HEMP), Electromagnetic Interference (EMI), Nuclear Biological and Chemical Contamination Survivability (NBCCS), ballistic protection and seismic Risk Category V features. This project also includes an extensive amount of site work to include the installation of communications duct banks throughout the Missile Defense Complex (MDC) which interface with the Missile Fields and Readiness and Control Building. There will be several power and communication interfaces with existing mission critical facilities within the MDC.
Potential offerors are advised that the Request for Proposal is available for download via the Beta SAM website; however due to the large size of the files for the Plans and Specifications, Offerors are required to provide the name, e-mail address, and phone number of their selected point of contact (POC) to the Contract Specialist, Melissa Lynn via e-mail at: melissa.k.lynn@usace.army.mil, phone number: 907 753-2894 in order to have their name added for access to the Plans and Specifications uploaded to the DOD Safe site. The deadline for submission of POC information to request the Plans, Drawings and Specifications is 07 October 2020 by 2:00PM Alaska Time. Offerors who have responded by the deadline with POC information will be provided the RFP specifications and drawings via the DOD Safe Website starting on the release date of the solicitation. All notifications of changes to this solicitation shall be made through the internet only (Beta SAM). It is the offeror’s responsibility to check for any posted changes to this solicitation.
Request to attend the Site Visit must be submitted to the RFP POCs in accordance with Section 00 21 00, paragraph 1.8 in the Amendment 01, posted 06 OCT 2020.
VIRTUAL PRE-PROPOSAL MEETING, 14 OCTOBER 2020 at 0800 AKST
JOIN MICROSOFT TEAMS MEETING -
https://teams.microsoft.com/l/meetup-join/19:meeting_NjIwZWRmNmEtZjA5NS00OTM3LTk1NDUtOWQ4Mjg2NDE2MWUx@thread.v2/0?context={"Tid":"7a53b4fc-e87d-4c46-9972-0570ac271b27","Oid":"9c9adc41-9889-4d37-b4b0-ffd76d8a7083"}
+1 913-278-0791 United States, Kansas City (Toll)
Conference ID: 579 582 649#
POC - MELISSA LYNN (907)753-2894, melissa.k.lynn@usace.army.mil OR JASON WILSON (719)721-1906, jason.f.wilson@usace.army.mil
Update #2 ·
This is a Full and Open Request for Proposal (RFP) for a Design-Bid-Build Construction of a Communications Center at Fort Greely, Alaska. The procurement will be conducted using single phase source selection tradeoff process described in FAR 15.101-1. The award will be based on the best overall value to the Government considering the non-price factors described in the RFP and price. The Government will evaluate proposals in accordance with the evaluation rating systems outlined in the selection procedures of the RFP. Any resulting contract will be firm fixed price. The anticipated Notice to Proceed date is 15 March 2021 with a construction completion date no later than 30 September 2022.
The Fort Greely Communications Center will provide a new communications capability to provide the Warfighter with a redundant capability at the Missile Defense Integration & Operations Center (MDIOC) utilizing communications which are separate and independent of the existing Readiness and Control Building (RCB). This fully designed facility includes High Altitude Electromagnetic Pulse (HEMP), Electromagnetic Interference (EMI), Nuclear Biological and Chemical Contamination Survivability (NBCCS), ballistic protection and seismic Risk Category V features. This project also includes an extensive amount of site work to include the installation of communications duct banks throughout the Missile Defense Complex (MDC) which interface with the Missile Fields and Readiness and Control Building. There will be several power and communication interfaces with existing mission critical facilities within the MDC.
Potential offerors are advised that the Request for Proposal is available for download via the Beta SAM website; however due to the large size of the files for the Plans and Specifications, Offerors are required to provide the name, e-mail address, and phone number of their selected point of contact (POC) to the Contract Specialist, Melissa Lynn via e-mail at: melissa.k.lynn@usace.army.mil, phone number: 907 753-2894 in order to have their name added for access to the Plans and Specifications uploaded to the DOD Safe site. The deadline for submission of POC information to request the Plans, Drawings and Specifications is 07 October 2020 by 2:00PM Alaska Time. Offerors who have responded by the deadline with POC information will be provided the RFP specifications and drawings via the DOD Safe Website starting on the release date of the solicitation. All notifications of changes to this solicitation shall be made through the internet only (Beta SAM). It is the offeror’s responsibility to check for any posted changes to this solicitation.
Request to attend the Site Visit must be submitted to the RFP POCs in accordance with Section 00 21 00, paragraph 1.8 in the Amendment 01, posted 06 OCT 2020.
Update #1 ·
This is a Full and Open Request for Proposal (RFP) for a Design-Bid-Build Construction of a Communications Center at Fort Greely, Alaska. The procurement will be conducted using single phase source selection tradeoff process described in FAR 15.101-1. The award will be based on the best overall value to the Government considering the non-price factors described in the RFP and price. The Government will evaluate proposals in accordance with the evaluation rating systems outlined in the selection procedures of the RFP. Any resulting contract will be firm fixed price. The anticipated Notice to Proceed date is 15 March 2021 with a construction completion date no later than 30 September 2022.
The Fort Greely Communications Center will provide a new communications capability to provide the Warfighter with a redundant capability at the Missile Defense Integration & Operations Center (MDIOC) utilizing communications which are separate and independent of the existing Readiness and Control Building (RCB). This fully designed facility includes High Altitude Electromagnetic Pulse (HEMP), Electromagnetic Interference (EMI), Nuclear Biological and Chemical Contamination Survivability (NBCCS), ballistic protection and seismic Risk Category V features. This project also includes an extensive amount of site work to include the installation of communications duct banks throughout the Missile Defense Complex (MDC) which interface with the Missile Fields and Readiness and Control Building. There will be several power and communication interfaces with existing mission critical facilities within the MDC.
Potential offerors are advised that the Request for Proposal is available for download via the Beta SAM website; however due to the large size of the files for the Plans and Specifications, Offerors are required to provide the name, e-mail address, and phone number of their selected point of contact (POC) to the Contract Specialist, Melissa Lynn via e-mail at: melissa.k.lynn@usace.army.mil, phone number: 907 753-2894 in order to have their name added for access to the Plans and Specifications uploaded to the DOD Safe site. The deadline for submission of POC information to request the Plans, Drawings and Specifications is 07 October 2020 by 2:00PM Alaska Time. Offerors who have responded by the deadline with POC information will be provided the RFP specifications and drawings via the DOD Safe Website starting on the release date of the solicitation. All notifications of changes to this solicitation shall be made through the internet only (Beta SAM). It is the offeror’s responsibility to check for any posted changes to this solicitation.
Files
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| Construction of fort greely communications center, fort greely, alaska (FTG233) | Award Notice | |
| This notice | Solicitation | |
| Construction of fort greely communications center, fort greely, alaska (FTG233) | Pre-Solicitation | |
| Fort greely communications center (FTG233) | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| FTG247 Replace UPS at IDT1, Fort Greely, Alaska | ENDIST Alaska | Total Small Business |