W911KB21R0004_AM05_02NOV20.pdf

PDF 7 MB Posted

Attached to
CONSTRUCTION OF FORT GREELY COMMUNICATIONS CENTER, FORT GREELY, ALASKA (FTG233)
Solicitation number
W911KB21R0004
Issued by

About this file

This Request for Proposal (RFP) solicits design-build construction services for a Fort Greely Communications Center in Alaska. Key details include:

  • The project involves construction of an 11,500 square foot communications facility to provide redundant capabilities for the Missile Defense Integration and Operations Center. The facility requires HEMP, EMI, NBCCS, ballistic, and seismic protection.

  • The RFP will utilize a single-phase source selection process based on best value. Proposals are due by November 13, 2020 and award is anticipated by March 15, 2021.

  • The scope also includes installation of communications duct banks throughout the Missile Defense Complex interfacing with missile fields and other facilities. Construction must consider subarctic climate conditions and working in semi-isolated areas.

  • Evaluation criteria cover specialized experience, past performance, project schedule, technical approach, organization, small business participation, and price. The RFP provides submission requirements and rating methodologies for each criterion.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

FTG233 CONSTRUCTION OF COMMUNICATIONS CENTER, FORT GREELY, AK

a. This amendment provides various changes to the solicitation as indicated on the continuation page(s) of this document.

b. Proposal due date remains unchanged as a result of this amendment. Proposal due 1400 AKST, 13 November 2020.

c. You are required to return a signed copy of this amendment as acknow ledgement, and part of your proposal submission.

d. All other terms and conditions of this solicitation remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Oct-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB21R0004

X 9B. DATED (SEE ITEM 11)

28-Sep-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Oct-2020

CODE

U.S. ARMY ENGINEER DISTRICT, AK

CEPOA-CT (W911KB)

PO BOX 6898

JBER AK 99506-0898

W911KB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

X 1

W911KB21R0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

DIV 00

Section 00 22 11 - Revised paragraphs 4.1.1 and 4.2.1

Inclusion of Site Visit Roster, 22 October 2020

DIV 01

List of Revised Documents

- Specs, 27 October 2020, attached

- Drawings, 27 October 2020, attached

Proposal due date remains 1400 AKST, 13 November 2020

All other terms and conditions remain the same..

(End of Summary of Changes)

FTG233

DIVISION 00- AM#01, AM#03, AM#04, AM#05

TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 11 00 SF1442

00 11 01 PROPOSAL SCHEDULE

00 21 00 INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS - AM#01, AM#03

00 22 11 PROPOSAL SUBMISSION REQUIREMENTS EVALUATION CRITERIA AND BASIS

OF AWARD ONE STEP – BEST VALUE – AM#01, AM#03, AM#05

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 72 00 CONTRACT CLAUSES

00 73 00.00 29 SPECIAL CONTRACT REQUIREMENTS

00 73 46 WAGE DETERMINATIONS

DIVISION 00

FRONT END

PS- 1

PROPOSAL SCHEDULE

Fort Greely Communications Center

Fort Greely, Alaska

BASE ITEMS

Item

No.

Description Estimated

Quantity

Unit Unit Price Amount

0001 Construct Fort Greely

Communications Center and all other features that are not described or identified in other CLIN’s, complete.

1 Job $_________ $_________

0002 Construct and install server room rack seismic framing as outlined on drawings S-401 & S-535, complete.

1 Job $_________ $_________

0003 Procure and install CBRN filter elements as outlined on drawings

MH401 & MH702, complete.

1 Job $_________ $_________

0004 Procure Electronic Security System equipment, complete. 1 Job $_________ $_________

0005 Procure and install all Mission fiber as shown on drawings TS601 and

TS610 through TS616, complete.

1 Job $_________ $_________

0006 Procure and install Temporary

Construction Free Zone as shown on drawing C-030 & C-031, complete.

1 Job $_________ $_________

Total of Base Items 0001 -0006 $_________

PS- 2

OPTIONAL ITEMS

Item No. Description Estimated

Quantity

Unit Unit Price Amount

0007 (OPTION 1) Remove, Sample, and Stockpile 50

Cubic Yards of Contaminated

Soil, including construction of Holding Cells, complete *

50 CY $_________ $_________

0008 (OPTION 2) Repair EMHS

Hatches as outlined on drawing ES551, complete

2 Ea $_________ $_________

0009 (OPTION 3) Replace EMHS hatches as outlined on drawing ES551, complete

2 Ea $_________ $_________

0010 (OPTION 4) Install concrete cap over comm ductbanks in lieu of concrete encased ductbanks as outlined on drawing TS301, sections D1 and D8 and Note 3, complete.

Ductbanks impacted by this option are shown on drawings TS109, TS110, TS111, TS114, TS118, TS122, TS124, TS128, TS133, TS134, TS143, TS144 and TS145.

1 Job $_________ $_________

**AM#04**

(OPTION 5) Provide additional 1 year Project

Extended Warranty to include all items constructed and installed under this contract’s

SOW. This warranty will conform to specification sections 00 72 00 & contract clause 52.246-21 "Warranty of Construction".

1 Yr $_________ $_________

Total of Optional Items 0007 thru 0011 $_________

TOTALS

Total of Base and Optional Items 0001 thru 0011

The Contracting Officer may exercise Option 1 with written notice to the Contractor prior to the end of contract completion.

The Contracting Officer may exercise Options 2-5..AM#04… with written notice to the Contractor within 180 days from receipt of the NTP.

PS- 3

* Shall be the cost for work identified in Specs Section 02 61 13 “Excavation and handling of Contaminated

Material” and Section 01 57 20.01 29 “Environmental Protection”, Appendix A “Handling/Management of

Contaminated Soil,” that is additional to the requirements of the normal project excavation and field screening identified in Section 31 09 20.0029 “Field Screen Testing of Soils for POL Contamination”, Subject to FAR

Clause 52.211-18 “Variation in Estimated Quantity.”

EVALUATION OF OFFERS

1. AWARD: Award will be made in accordance with Section 00 22 11 – Proposal Submission

Requirements, Evaluation Criteria and Basis of Award One Step –Best Value.

2. INCOMPLETE OFFERS: Failure to submit an offer on all items in the schedule constitutes an incomplete offer. Incomplete offers may be rejected. Lump sum or unit prices must be shown for each item within the schedule.

3. EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the

Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

4. SPECIAL CONDITION: If a modification to an offer based on unit price is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the proposal schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro-rated basis to every unit price in the proposal schedule.

-- END OF PROPOSAL SCHEDULE --

Section 00 21 00 W911KB21R0004

Section 00 21 00 Page 1

SECTION 00 21 00 -AM#01 AM#03

INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

1.0 GENERAL INFORMATION

1.1 GENERAL DESCRIPTION OF WORK

1.2 CONTRACT CONTRUCTION COST MAGNITUDEpara

1.3 GOVERNMENT SECURITY REQUIREMENTS

1.4 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

1.5 OFFEROR'S QUESTIONS AND COMMENTS

1.6 SMALL BUSINESS SIZE STANDARD/NAICS CODE

1.7 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

1.8 SITE VISIT/PRE-PROPOSAL CONFERENCE

1.9 ACCURACY IN PROPOSALS

1.10 PROPOSAL SUBMITTALS

1.11 PROPOSAL FORMAT

1.12 BUY AMERICAN ACT FOR CONSTRUCTION MATERIALS

1.13 SOLICITATION PROVISIONS

Section 00 21 00 Page 2

1.0 GENERAL INFORMATION

1.1. GENERAL DESCRIPTION OF WORK

This project, FTG233, Communications Center, Fort Greely, Alaska is for the construction of a

Communications Center equal or greater than 11,500 square feet and associated site development. The

Fort Greely Communications Center will provide a new communications capability to provide the

Warfighter with a redundant capability at the Missile Defense Integration & Operations Center (MDIOC) utilizing communications which are separate and independent of the existing Readiness and Control

Building (RCB). This fully designed facility includes High Altitude Electromagnetic Pulse (HEMP), Electromagnetic Interference (EMI), Nuclear Biological and Chemical Contamination Survivability

(NBCCS), ballistic protection and seismic Risk Category V features. This project also includes an extensive amount of site work to include the installation of communications duct banks throughout the

Missile Defense Complex (MDC) which interface with the Missile Fields and Readiness and Control

Building. There will be several power and communication interfaces with existing mission critical facilities within the MDC.

1.2. CONTRACT CONSTRUCTION COST MAGNITUDE

The construction costs will be subject to the funds available for this project. In accordance with the criteria stated in DFARS 236.204, the magnitude of this project is between …AM#03 $25,000,000 and

$100,000,000 $35,000,000 and $65,000,000…AM#03.

1.3. GOVERNMENT SECURITY REQUIREMENTS

The Offeror(s) must ensure that ALL mail sent to the Alaska District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers will be REJECTED by the US

Army Corps of Engineers mail room facility located at PO Box 6898, JBER, Alaska 99506-6898 if it does not contain a return mailing address. There will be no exceptions.

1.4. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the Beta SAM website at: https://beta.sam.gov/ via Quick Search (Solicitation

No. W911KB21R0004).

It shall be the contractor’s responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.

Section 00 21 00 Page 3

A list of interested vendors (potential offerors and subcontractors) is available on the Beta SAM website

(registration required) is available at: https://beta.sam.gov/ via Quick Search (Solicitation No.

W911KB21R0004)

Final proposal due date will be …AM#03 1400 Alaska Time, 13 November 2020…AM#03

1.5. OFFEROR'S QUESTIONS AND COMMENTS

Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in

ProjNet at (https://www.projnet.org) no later than 10 calendar days prior to the proposal due date. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team. Offerors are requested to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted as an amendment to the solicitation in the form of a report generated from ProjNet as soon as the comment/question entering period is over and all answers are finalized.

The Solicitation Number is: W911KB21R0004

The Bidder Inquiry Key is: W4XVSJ-657IKT

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret

Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your

Secret Question and Secret Answer to log in.

Section 00 21 00 Page 4

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

1.6. SMALL BUSINESS SIZE STANDARD/NAICS CODE

See Standard Form 1442 for the small business size standard/NAICS code.

1.7. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.

1.8. …AM#01 SITE VISIT/PRE-PROPOSAL CONFERENCE

The Government intends to hold a site visit for offerors on the date and time indicated in clause 52.236-27 under paragraph 1.15 of this section. There will be a separate pre-proposal conferene which will be held via teleconference and will be prior to the site visit. Offerors requiring access to Fort Greely must provide the name, date of birth, driver’s license number and state, and last 4 digits of the social security number of attendees no later than 09 October 2020 to:

Ms. Melissa K. Lynn

Phone: 907-753-2894

Email: melissa.k.lynn@usace.army.mil

Mr. Jason Wilson

Phone: 907-873-2801

Jason.f.wilson@usace.army.mil

The pre-proposal conference will be held virtually. Teleconference information will be distributed at a later date. A presentation will be given by the Government at this conference and the Offerors will have opportunities to ask questions. There is no limit to the number of people who can attend this conference. The site visit will be limited to 1 individual per prime contractor. Please be aware that there are state of Alaska

COVID-19 restrictions in place for individuals traveling from outside of Alaska and there are also Fort Greely

COVID-19 restrictions in place. Current information concering the Fort Greely COVID-19 restrictions and active policies can be found on the Fort Greely COVID-19 web page located at https://home.army.mil/alaska/index.php/fort-greely/about/announcements/fort-greely-covid19-information. If a prime contractor is from outside of the state of Alaska, it will be permitted to substitute for a local representative or sub-contractor to attend on behalf of the prime. Photos can be taken by Government representatives during the site visit, which will be distributed to all Offerors after the site visit.

mailto:melissa.k.lynn@usace.army.mil mailto:Jason.f.wilson@usace.army.mil https://home.army.mil/alaska/index.php/fort-greely/about/announcements/fort-greely-covid19-information

Section 00 21 00 Page 5

All Offerors who are attending the site visit must bring 2 Real-ID compliant forms of identification with them in order to process inot and out of the facilty. The Fort Greely Missile Defense Complex (MDC) is a controlled access site which requires a heightened level of security. Attendees shall expect to process hrough the MDC access control facility. While passing through this area all personnel will undergo a physical search of their person and all items accompanying the individual. All electronics such as cell phones, PDA’s, smart watches, key fobs, exc. are prohibit. Also ensure all of your personnel do not bring any tools that can be construed as a weapon or ammunition. …AM#01

1.9. ACCURACY IN PROPOSALS

Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.

1.10. PROPOSAL SUBMITTALS

ALL RESPONSES TO THIS ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY. Hand carried delivery or USPS/UPS/Fedex delivery of hard copies and/or CD-ROMs are not authorized.

Submission of proposal shall be via DoD SAFE Site (https://safe.apps.mil). NOTE: Facsimile submission is not authorized.

File Size Limitations: The DoD SAFE site has a file size limitation of 8GB. Offerors must request a code within 10 days of the solicitation closing date from the Contract Specialist in order to upload the proposal data to DoD SAFE.

File Names: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention: Each filename shall begin with the solicitation number, followed by the word “RESPONSE”, followed by your firm’s name, and finally a brief file description. EXAMPLES:

(1) “W911KB21R0004 RESPONSE Firmname Volume 1.pdf”

(2) “W911KB21R0004 RESPONSE Firmname Volume 2 – Small Business Participation Plan.pdf”

(3) “W911KB21R0004 RESPONSE Firmname Volume 2 – Price.xlsx”

Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on solicitation document. The time & date of proposal receipt will be the upload completion /delivery time & date recorded of email receipt on the Government’s server. Do not assume that electronic submission will occur instantaneously. Offerors should time their proposal submission with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process and troubleshooting. Offerors are encouraged to keep a copy of the delivery/read confirmation for their record but shall also request confirmation.

Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions

Section 00 21 00 Page 6 to Offerors Competitive Acquisition (Jan 2017),” subparagraph (e) which is found in Selection 00 21 00 of the solicitation. The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.

1.11. PROPOSAL FORMAT

(a) Electronic Format: Offer must provide electronic version of proposal in searchable, bookmarked, read-only, unsecured format, preferably PDF format. Proposal shall be in 8 ½” x 11” format, using 10 point or larger font size. Consolidate the tabs under each volume into one PDF file except that catalog data may be in a separate PDF file. All price breakdown information to aide in the price evaluation shall be submitted in

Excel format.

(i) The prime, consortium, or joint venture’s name, address, a signature of the official that can bind the firm and a telephone number and email address shall appear in the lower left corner of the title page of any document/volume to be evaluated.

(ii) Volume number, section, page number and date submitted shall appear in the bottom right corner of each page (along with the revision number for the amended page, if necessary). Page numbering shall re-start with each Tab. The Government will not evaluate any material exceeding the page limitations stated in the RFP.

1.12 JOINT VENTURE AND LLC PROPOSAL REQUIREMENTS

When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HUBZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.

When proposing as a Limited Liability Company (LLC), a member authorized to bind the LLC shall sign the

SF 1442. A copy of the LLC Certificate of Organization, Articles of Organization and the Operating

Agreement shall be submitted with the proposal.

On SF 25 and 25A, Bonds, where it requests “State of Incorporation,” the LLC should instead put the “State of Organization.” In the Principal’s signature block, the signatory shall indicate whether he or she is signing as a member, manager, or both. Instead of a “Corporate Seal” attach the Certificate of Formation or

Certificate of Organization, as appropriate, which should indicate the signatory’s authority to bind the LLC.

1.13 BUY AMERICAN CONSTRUCTION MATERIALS

Your attention is invited to Clause 52.225-12 Notice of Buy American Requirement-Construction Materials under Trade Agreements. You are advised to inform your potential subcontractors and suppliers of the Buy

Section 00 21 00 Page 7

American requirements contained in this solicitation. Subparagraph (b) of the clause provides instructions for pre-award determinations as follows: “Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the

Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy

American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.” In accordance with FAR Part 25 Foreign

Acquisition, subpart 25.205 entitled Post Award determinations, subparagraph (a), if a contractor requests a determination regarding the inapplicability of the Buy American provision after contract award, the contractor must explain why it could not request the determination before contract award or why the need for such determination otherwise was not reasonably foreseeable.

1.14 SOLICITATION PROVISIONS INCORPORATED BY FULL TEXT

52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY

PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

Any contract awarded as a result of this solicitation will be ____ DX rated order; C2 DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and

Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.

(End of provision)

52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2017)

(a) Definitions. As used in this provision—

“Discussions” are negotiations that occur after establishment of the competitive range that may, at the

Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.

“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

Section 00 21 00 Page 8

(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.

(2) The first page of the proposal must show—

(i) The solicitation number;

(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and

(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.

(3) Submission, modification, or revision, of proposals.

(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach the

Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.

(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and—

(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

Section 00 21 00 Page 9

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or

(3) It is the only proposal received.

(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.

(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.

(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency

Offers, is included in the solicitation.

(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.

(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.

(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.

(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).

(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall--

Section 00 21 00 Page 10

(1) Mark the title page with the following legend: This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed--in whole or in part--for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of--or in connection with-- the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and

(2) Mark each sheet of data it wishes to restrict with the following legend: Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.

(f) Contract award.

(1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror whose proposal represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.

(2) The Government may reject any or all proposals if such action is in the Government's interest.

(3) The Government may waive informalities and minor irregularities in proposals received.

(4) The Government intends to evaluate proposals and award a contract without discussions with offerors

(except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.

(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government's best interest to do so.

(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the

Government.

(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

Section 00 21 00 Page 11

(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.

(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.

(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

(i) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.

(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.

(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.

(iv) A summary of the rationale for award.

(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.

(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a FIRM FIXED PRICE contract resulting from this solicitation.

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

Section 00 21 00 Page 12

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK

(MAY 2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate

Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the

Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance

Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

8.7% Anchorage

15.1% Locations outside

City of Anchorage

6.9% Alaska

These goals are applicable to all the Contractor's construction work performed in the covered area. If the

Contractor performs construction work in a geographical area located outside of the covered area, the

Contractor shall apply the goals established for the geographical area where the work is actually performed.

Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of

Section 00 21 00 Page 13 meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract

Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Fort

Greely, Alaska

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials

Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR

Section 00 21 00 Page 14 clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause

52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of

FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

Physical Address:

Contracting Officer

U.S. Army Engineer District, Alaska

CEPOA-CT

2204 Talley Ave. Room 30

JBER, Alaska 99506

Mailing Address:

Contracting Officer

U.S. Army Engineer District, Alaska

CEPOA-CT

P.O. Box 6898

JBER, Alaska 99506

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

Section 00 21 00 Page 15

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions

Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

…AM#01 Virtual presentation/conference is tentatively scheduled for 14 October 2020, with the site visit tentatively scheduled for 15 October 2020 and possibly 16 October 2020, depending on number of requests to participate…AM#01

(c) Participants will meet at--

TO BE DETERMINED, …AM#01 Instructions to be provided by the POCs in paragraph 1.8 prior to Site Visit…AM#01

52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)

(a) Proposals must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a proposal must initial each erasure or change appearing on any proposal form.

(b) The proposal form may require offerors to submit proposed prices for one or more items on various bases, including—

(1) Lump sum price;

(2) Alternate prices;

(3) Units of construction; or

(4) Any combination of paragraphs (b)(1) through (b)(3) of this provision.

(c) If the solicitation requires submission of a proposal on all items, failure to do so may result in the proposal being rejected without further consideration. If a proposal on all items is not required, offerors should insert the words “no proposal” in the space provided for any item on which no price is submitted.

(d) Alternate proposals will not be considered unless this solicitation authorizes their submission.

252.236-7008 CONTRACT PRICES - BIDDING SCHEDULES. (DEC 1991)

(a) The Government's payment for the items listed in the Bidding Schedule shall constitute full compensation to the Contractor for --

(1) Furnishing all plant, labor, equipment, appliances, and materials; and

(2) Performing all operations required to complete the work in conformity with the drawings and specifications.

Section 00 21 00 Page 16

(b) The Contractor shall include in the prices for the items listed in the Bidding Schedule all costs for work in the specifications, whether or not specifically listed in the Bidding Schedule.

Section 00 22 11 W911KB21R0004

Section 00 22 11 Page 1

SECTION 00 22 11 -AM#01…AM#03, AM#05

PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND BASIS OF AWARD

ONE STEP - - BEST VALUE

(SINGLE AWARD)

1.0 OVERVIEW

2.0 GENERAL INSTRUCTIONS

3.0 PROPOSAL AND RELATED EVALUATION FACTORS

4.0 VOLUME 1, TAB A – FACTOR 1 – SPECIALIZED EXPERIENCE

5.0 VOLUME 1, TAB B – FACTOR 2 – PAST PERFORMANCE

6.0 VOLUME 1, TAB C – FACTOR 3 – PROJECT EXECUTION SCHEDULE

7.0 VOLUME 1, TAB D – FACTOR 4 – TECHNICAL APPROACH

8.0 VOLUME 1, TAB E – FACTOR 5 – ORGANIZATION

9.0 VOLUME 2, TAB A – FACTOR 6 – SMALL BUSINESS PARTICIPATION PLAN

10.0 VOLUME 2, TAB B – FACTOR 7 – PRICE (STANDARD FORM 1442, PROPOSAL DATA

SHEET, AND CONTRACT LINE ITEM SCHEDULE)

11.0 REQUIRED PRE-AWARD INFORMATION

12.0 …AM#01 SMALL BUSINESS SUB-CONTRACTING PLAN…AM#01

13.0 EVALUATION PROCEDURES AND DEFINITIONS

SECTION 00 22 11 ATTACHMENTS

1 – PROPOSAL DATA SHEETS

2 – COMPANY SPECIALIZED EXPERIENCE CONSTRUCTION OR PRIME CONTRACTOR

3 – PAST PERFORMANCE QUESTIONNAIRE

4 – KEY PERSONNEL RESUME

5 – SMALL BUSINESS PARTICIPATION PLAN

6 – SMALL BUSINESS SUBCONTRACTING PLAN

Section 00 22 11 W911KB21R0004

Section 00 22 11 Page 2

1.0 OVERVIEW

This project is for the construction of an 11,500 SF HEMP shielded facility located on the Missile Defense

Complex at Fort Greely, AK called the Fort Greely Communications Center. This facility will provide a new communications capability to provide the Warfighter with a redundant capability at the Missile Defense

Integration & Operations Center (MDIOC) utilizing communications which are separate and independent of the existing Readiness and Control Building (RCB). This fully designed facility includes High Altitude

Electromagnetic Pulse (HEMP), Electromagnetic Interference (EMI), Nuclear Biological and Chemical

Contamination Survivability (NBCCS), ballistic protection and seismic Risk Category V features. This project also includes an extensive amount of site work to include the installation of communications duct banks throughout the Missile Defense Complex (MDC) which interface with the Missile Fields and Readiness and

Control Building. There will be several power and communication interfaces with existing mission critical facilities within the MDC.

2.0 GENERAL INSTRUCTIONS

This is a “Best Value” solicitation for the construction of FTG233 Fort Greely Communications Center

(FGACC), located at Fort Greely, Alaska. Interested firms (hereafter referred to as Offerors) shall submit proposals demonstrating their capability to successfully execute the construction contract resulting from this solicitation. The Government will evaluate the proposals in accordance with the criteria described herein and award a firm fixed price contract to the responsible offeror whose proposal is determined to represent the overall best value to the Government utilizing the trade-off process described in FAR 15.101-1.

The Contracting Officer will award a firm fixed price contract to the responsible offeror whose proposal the

Source Selection Authority has determined conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering all non-price factors,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .