Amendment 0001. Q&A #1-4. Construction. B102 HVAC Renovation and Chiller Upgrade. Provide chiller, chilled water piping, expansion, glycol system, cassette fan coil units, controls, electric duct heaters, and electrical connections.
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- N66604-22-R-0298
- Agency
-
Naval Sea Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Newport, Rhode Island 02841, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks a contractor to replace the variable refrigerant volume system and chilled water fan coil units at Building 102 with a new chiller system. The scope of work includes providing a chiller, chilled water piping, expansion components, a glycol system, cassette fan coil units, controls, electric duct heaters, and all necessary electrical and mechanical connections. The contractor must also provide direct digital controls, testing and balancing, commissioning, performance verification testing and incidental related work. Onsite supervision will require at least two qualified individuals to serve as superintendent, quality control manager, and site safety and health officer. A commissioning authority is also required. The response due date is May 24, 2022.
This project has a 100% small business set-aside designation with a NAICS code of 236220 for commercial and institutional building construction and a size standard of $39.5 million. The place of performance is Building 102 at the Naval Undersea Warfare Center Division in Newport, Rhode Island.
Notice text
3 versions
Update #3 · Latest ·
Amendment 0001 incorporates below Questions and Answers #1 through #4, provided earlier, into solicitation N66604-22-R-0298, as well as updating Wage Determinaton RI20220001 Mod 5 dated 6 May 2022. Acknowledging receipt of Amendment 0001 serves to acknowledge receipt of Questions and Answers #1 through #4 as requested below.
--------------------------------------------------------------------------------------------------------------------------
Questions and Answers #1 through #4 provided below and as an attachment. Proposals remain due 2:00 PM ET Tuesday 24 May 2022. Acknowledge receiving below Q&A #1-4 in administrative section of your proposal.
Question #1: What is the size and who is providing the concrete pad for the new chiller?
Answer #1: Contractor shall provide concrete pad for new chiller. Size of pad shall extend approximately four inches beyond its mounted equipment on all sides. See Specification Section 23 64 10 Subparagraph 3.1.8.1 Refrigeration System Equipment (PDF page 366). Government is also advising Contractor of a typographical error in above-mentioned citation in that the 400 psi strength requirement should read 4,000 psi, consistent with concrete pad detail on Drawing Sheet M-501. Also, see General Note #23 on Drawing Sheet M-001.
Question #2: Who will be removing the ceiling grid?
Answer #2: Pursuant to Specification Section 02 41 00, Paragraph 3.1.6 Acoustical Ceiling Tile, “Remove, neatly stack, and reuse acoustic ceiling tiles.” Similarly, Contractor shall remove grid to accommodate the Work and restore acoustical ceiling system to its original or better condition.
Question #3: What are the accommodations for Contractor when installing fan coil units, chilled and condensate piping down the hallway, and each of the offices?
Answer #3: Contractor shall coordinate sequencing of work with the building occupants via the NUWCDIVNPT Construction Manager, i.e., the NUWCDIVNPT Code 1022 Contracting Officer’s Representative, to be identified at time of award in Section G of the contract.
Question #4: Is there a requirement to perform work off hours?
Answer #4: The electrical tie-ins may require off work hours for outages.
Acknowledge receiving above Q&A #1-4 in administrative section of your proposal.
(End of Questions and Answers)
Replace variable refrigerant volume (VRF) system for a chilled water fan coil unit system to include a chiller at Building 102. Scope includes replacing the steam valves to be connected into the direct digital control (DDC) system, connecting the energy recovery ventilators (ERV) to the system, and electric duct heaters for the ERV ducts. Contractor shall provide chiller, chilled water piping, expansion, glycol system, cassette fan coil units, controls, electric duct heaters, and electrical connections. Contractor shall provide DDC, testing and balancing, commissioning, performance verification testing, and incidental related work.
Onsite Contractor supervision will require at least two qualified individuals to serve in the role of superintendent, quality control (QC) manager, and site safety and health officer. The only duties and responsibilities of the QC Manager are to manage and implement the quality control program. There is an additional requirement for a Commissioning Authority.
Update #2 ·
Questions and Answers #1 through #4 provided below and as an attachment. Proposals remain due 2:00 PM ET Tuesday 24 May 2022. Acknowledge receiving below Q&A #1-4 in administrative section of your proposal.
Question #1: What is the size and who is providing the concrete pad for the new chiller?
Answer #1: Contractor shall provide concrete pad for new chiller. Size of pad shall extend approximately four inches beyond its mounted equipment on all sides. See Specification Section 23 64 10 Subparagraph 3.1.8.1 Refrigeration System Equipment (PDF page 366). Government is also advising Contractor of a typographical error in above-mentioned citation in that the 400 psi strength requirement should read 4,000 psi, consistent with concrete pad detail on Drawing Sheet M-501. Also, see General Note #23 on Drawing Sheet M-001.
Question #2: Who will be removing the ceiling grid?
Answer #2: Pursuant to Specification Section 02 41 00, Paragraph 3.1.6 Acoustical Ceiling Tile, “Remove, neatly stack, and reuse acoustic ceiling tiles.” Similarly, Contractor shall remove grid to accommodate the Work and restore acoustical ceiling system to its original or better condition.
Question #3: What are the accommodations for Contractor when installing fan coil units, chilled and condensate piping down the hallway, and each of the offices?
Answer #3: Contractor shall coordinate sequencing of work with the building occupants via the NUWCDIVNPT Construction Manager, i.e., the NUWCDIVNPT Code 1022 Contracting Officer’s Representative, to be identified at time of award in Section G of the contract.
Question #4: Is there a requirement to perform work off hours?
Answer #4: The electrical tie-ins may require off work hours for outages.
Acknowledge receiving above Q&A #1-4 in administrative section of your proposal.
(End of Questions and Answers)
Replace variable refrigerant volume (VRF) system for a chilled water fan coil unit system to include a chiller at Building 102. Scope includes replacing the steam valves to be connected into the direct digital control (DDC) system, connecting the energy recovery ventilators (ERV) to the system, and electric duct heaters for the ERV ducts. Contractor shall provide chiller, chilled water piping, expansion, glycol system, cassette fan coil units, controls, electric duct heaters, and electrical connections. Contractor shall provide DDC, testing and balancing, commissioning, performance verification testing, and incidental related work.
Onsite Contractor supervision will require at least two qualified individuals to serve in the role of superintendent, quality control (QC) manager, and site safety and health officer. The only duties and responsibilities of the QC Manager are to manage and implement the quality control program. There is an additional requirement for a Commissioning Authority.
Update #1 ·
Replace variable refrigerant volume (VRF) system for a chilled water fan coil unit system to include a chiller at Building 102. Scope includes replacing the steam valves to be connected into the direct digital control (DDC) system, connecting the energy recovery ventilators (ERV) to the system, and electric duct heaters for the ERV ducts. Contractor shall provide chiller, chilled water piping, expansion, glycol system, cassette fan coil units, controls, electric duct heaters, and electrical connections. Contractor shall provide DDC, testing and balancing, commissioning, performance verification testing, and incidental related work.
Onsite Contractor supervision will require at least two qualified individuals to serve in the role of superintendent, quality control (QC) manager, and site safety and health officer. The only duties and responsibilities of the QC Manager are to manage and implement the quality control program. There is an additional requirement for a Commissioning Authority.
Files
Show all 17
Notice history
| Notice | Type | Posted |
|---|---|---|
| B102 HVAC | Award Notice | |
| This notice | Solicitation | |
| Construction. B102 HVAC Renovation and Chiller Upgrade. | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Construction-NUWCDIVNPT HVAC Piping Insulation | Naval Sea Systems Command | Total Small Business | |
| Z2NZ--Turn Key Chiller Equipment (Purchase and Install) | Veterans Integrated Service Network 16 | No set-aside | |
| Z2FF-FCI El Reno-Replacement of Housing Unit HVAC Systems | BOP Field Acquisition Office | No set-aside | |
| CON | Z2DA | replace chiller 1 B104 | 580-24-111 | solicitation | Veterans Integrated Service Network 16 | Service-Disabled Veteran-Owned Small Business | |
| C221--402-27-001 Repair Chiller 3 (AE) | Veterans Integrated Service Network 1 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities