Amendment 0001 RFQ N66604-22-R-0298 B102_2022-05-24_Summary Changes.pdf
PDF 144 KB Posted
- Solicitation number
- N66604-22-R-0298
About this file
This amendment to a solicitation provides answers to four questions from potential offerors and updates the wage determination. The solicitation seeks to replace the variable refrigerant volume system at Building 102 on a naval base with a chilled water fan coil unit system including a chiller. The scope of work entails installing the chiller, chilled water piping, expansion components, glycol system, cassette fan coil units, controls, electric duct heaters, and electrical connections. It also includes connecting steam valves and energy recovery ventilators to the direct digital control system. Offerors must provide onsite supervision by at least two qualified personnel to serve as superintendent, quality control manager, and safety officer. A commissioning authority is also required. The updated wage determination is modification number five dated May 6, 2022.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1300983991
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Section A - General Information - Questions and Answ ers #1 through #4.
Section J - Updated Wage Determination RI20220001 Mod 5 dated 6 May 2022.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-May-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6660422R0298
X 9B. DATED (SEE ITEM 11)
22-Apr-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-May-2022
CODE
NAVAL UNDERSEA WARFARE CENTER
JOSEPH SCARPA, CODE 0222, 401-832-1499,
CONTRACTS DEPARTMENT
1176 HOWELL STREET, BLDG. 1258
NEWPORT RI 02841-1708
N66604 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6660422R0298
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The following have been added by full text:
GENERAL INFO - AMENDMENT 0001
Question #1: What is the size and who is providing the concrete pad for the new chiller?
Answer #1: Contractor shall provide concrete pad for new chiller. Size of pad shall extend approximately four inches beyond its mounted equipment on all sides. See Specification Section 23 64 10 Subparagraph 3.1.8.1 Refrigeration System Equipment (PDF page 366). Government is also advising Contractor of a typographical error in above-mentioned citation in that the 400 psi strength requirement should read 4,000 psi, consistent with concrete pad detail on Drawing Sheet M-501. Also, see General Note #23 on Drawing Sheet M-001.
Question #2: Who will be removing the ceiling grid?
Answer #2: Pursuant to Specification Section 02 41 00, Paragraph 3.1.6 Acoustical Ceiling Tile, “Remove, neatly stack, and reuse acoustic ceiling tiles.” Similarly, Contractor shall remove grid to accommodate the Work and restore acoustical ceiling system to its original or better condition.
Question #3: What are the accommodations for Contractor when installing fan coil units, chilled and condensate piping down the hallway, and each of the offices?
Answer #3: Contractor shall coordinate sequencing of work with the building occupants via the NUWCDIVNPT Construction Manager, i.e., the NUWCDIVNPT Code 1022 Contracting Officer’s Representative, to be identified at time of award in Section G of the contract.
Question #4: Is there a requirement to perform work off hours?
Answer #4: The electrical tie-ins may require off work hours for outages.
(End of Questions and Answers)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Wage Determination
RI20220001 Mod 4
13 01-APR-2022
Attachment 10 DoD Guidance for COVID-19 Vaccination
28 20-DEC-2021
Attachment 11 DD Form 3150 Vaccination Certification
Attachment 12 COVID-19 Questionnaire 1 10-FEB-2022
Attachment 13 Past Performance Questionnaire (PPQ) (Fill-in by Offeror)
Attachment 14 Indication of Interest (Optional)
Attachment 2 Specification B102
HVAC
408 07-APR-2022
Attachment 3 Submittal Register Attachment 4 Drawing Set 22-018A 13 19-APR-2022 Attachment 5 List of Key Personnel
(Fill-in by Offeror)
Attachment 6 Visitor Request Instructions and Information Needed
Attachment 7 SECNAV Form 5512 Base Access Pass
Attachment 8 Use of Masks and Other Public Health Measures
2 04-FEB-2021
Attachment 9 Mask Guidance for all DoD Installations
28-JUL-2021
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 01 Wage Determination
RI20220001 Mod 5
13 06-MAY-2022
Attachment 02 Specification B102
HVAC
408 07-APR-2022
Attachment 03 Submittal Register Attachment 04 Drawing Set 22-018A 13 19-APR-2022 Attachment 05 List of Key Personnel
(Fill-in by Offeror)
Attachment 06 Visitor Request Instructions and Information Needed
Attachment 07 SECNAV Form 5512 Base Access Pass
Attachment 08 Use of Masks and Other Public Health Measures
2 04-FEB-2021
Attachment 09 Mask Guidance for all DoD Installations
28-JUL-2021
Attachment 10 DoD Guidance for COVID-19 Vaccination
28 20-DEC-2021
Attachment 11 DD Form 3150 Vaccination Certification
Attachment 12 COVID-19 Questionnaire 1 10-FEB-2022 Attachment 13 Past Performance
Questionnaire (PPQ) (Fill-in by Offeror)
Attachment 14 Indication of Interest (Optional)
(End of Summary of Changes)