Concrete Coring and Testing - multiple Upper Mississippi River Locks

Awarded Award Notice Posted

Solicitation number
W912ES-17-T-0088
Agency
ENDIST St Paul US Army Corps of Engineers, Department of Defense
Awarded
to Agapito Associates, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
W912ES-17-P-0091 Federal contract award
NAICS code
541380 Testing Laboratories and Services
PSC
Not on record
Place of performance
Lock and Dam No. 4, 5, 5A, 8, & 9 Upper Mississippi River Fountain City, Wisconsin 54629, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Added: Jun 28, 2017 2:11 pm Amendment 002 is added to revise the answer to question 6 on the questions and answers page; provide additional answers to questions 13-16 asked by contractors; revise the scope of work in response to questions asked and to provide several clarifications(revised sections of the scope are indicated in RED); amend the quantity of corings to reflect 2 corings at each of the 23 locations (for a total of 46 corings); and to add Figure 1: Lock and Dam No. 9 Upper Guidewall Cross Section.

Update #3 ·

Added: Jun 22, 2017 1:22 pm Amendment 001 is added to answer questions which have been asked by interested contractors.  This amendment also establishes an organized site visit for Monday, June 26, 2017 at 8:00 AM CST at Lock and Dam 4.

Update #2 ·

Added: Jun 08, 2017 12:45 pm Modified: Jun 15, 2017 12:11 pmTrack Changes
The U.S. Army Corps of Engineers - St. Paul District requires a contractor to investigate and evaluate the interior concrete condition of the upper guide walls within five (5) hydraulic concrete lock structures along the Mississippi River within the St. Paul District.

This solicitation is a Request for Quotes (RFQ) with a 100% small business set-aside.
NAICS: 541380
SBA Size Standard: $15 million

The contractor shall drill five (5) vertical, 4 inch diameter concrete core cylinders in designated locations at each site (25 total), to the depths specified (between 7 and 8 feet). Each core hole shall be filled with water, and the time required for water to drain recorded. Cores shall be labeled in accordance with specifications, and retained for further testing. On-site data collection shall be conducted Monday - Friday, and is limited to 10 hours per day.

Contractor shall fill each core hole with non-shrink grout, conforming to ASTM C 1107, and all surface areas damaged by Contractor's operations shall be restored. All project-related debris shall be removed by contractor.

The Contractor shall develop and perform a laboratory testing plan, which shall include: 1. Each core shall be visually inspected, photographed, and the physical condition documented (25 total). 2. A full petrographic analysis in accordance with ASTM C 856 shall be conducted on two (2) cores, one upstream and one downstream, from the upper guide wall at each Lock site. This shall include an analysis of hardened air content, IAW ASTM C 457 (10 total). 3. A minimum of three (3) samples from each lock site shall be tested for compressive strength IAW ASTM C 39 (15 total).

Upon completion of the field coring and laboratory testing, a final report shall be submitted to the USACE-MVP Concrete Materials Engineer. The report shall be organized by site, and shall include (but is not limited to): 1. Summary of field data collection, including photographs, location, depth, and condition of each cylinder, and the time for water to drain from the hole. 2. Results of the laboratory testing. 

The target date for commencement of on-site data collection is no later than 15 days after contract award. On-site data collection shall be completed (including site restoration) no later than 45 days after award. The final report, with testing results, shall be submitted no later than 60 days after contract award date.

The locks being tested are:
Lock and Dam No. 4 - Alma, WI 54610-4421
Lock and Dam No. 5 - Minnesota City, MN 55959-9756
Lock and Dam No. 5A - Fountain City, WI 54629-7214
Lock and Dam No. 8 - Genoa, WI 56432-0265
Lock and Dam No. 9 - Lynxville, WI 54626-8793


No CD's or hard copies will be available. Offerors are responsible for checking the referenced page for any update(s) to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the document posted at the referenced website.


In order for contractors to conduct business with the Department of Defense, the contractor must provide registration information to the System for Award Management (SAM). All Offerors must be fully registered in SAM prior to receiving an award, to include a current FAR & DFARS Representations & Certifications Report. Registration instructions may be obtained, and online registration may be accomplished, at www.sam.gov.


Please copy the secondary point of contact, Shamron Richardson (Shamron.J.Richardson@usace.army.mil) on all communications, including questions and submission of quotes.

Update #1 ·

Added: Jun 08, 2017 12:45 pm This is a Pre-Solicitation Notice, for planning purposes only. A Request for Quotes (RFQ) is expected to be issued in the near future.

The U.S. Army Corps of Engineers - St. Paul District requires a contractor to investigate and evaluate the interior concrete condition of the upper guide walls within five (5) hydraulic concrete lock structures along the Mississippi River within the St. Paul District.

This solicitation will be released as a 100% small business set-aside.
NAICS: 541380
SBA Size Standard: $15 million

The contractor shall drill five (5) vertical, 4 inch diameter concrete core cylinders in designated locations at each site (25 total), to the depths specified (between 7 and 8 feet). Each core hole shall be filled with water, and the time required for water to drain recorded. Cores shall be labeled in accordance with specifications, and retained for further testing. On-site data collection shall be conducted Monday - Friday, and is limited to 10 hours per day.

Contractor shall fill each core hole with non-shrink grout, conforming to ASTM C 1107, and all surface areas damaged by Contractor's operations shall be restored. All project-related debris shall be removed by contractor.

The Contractor shall develop and perform a laboratory testing plan, which shall include: 1. Each core shall be visually inspected, photographed, and the physical condition documented (25 total). 2. A full petrographic analysis in accordance with ASTM C 856 shall be conducted on two (2) cores, one upstream and one downstream, from the upper guide wall at each Lock site. This shall include an analysis of hardened air content, IAW ASTM C 457 (10 total). 3. A minimum of three (3) samples from each lock site shall be tested for compressive strength IAW ASTM C 39 (15 total).

Upon completion of the field coring and laboratory testing, a final report shall be submitted to the USACE-MVP Concrete Materials Engineer. The report shall be organized by site, and shall include (but is not limited to): 1. Summary of field data collection, including photographs, location, depth, and condition of each cylinder, and the time for water to drain from the hole. 2. Results of the laboratory testing. 

The target date for commencement of on-site data collection is no later than 15 days after contract award. On-site data collection shall be completed (including site restoration) no later than 45 days after award. The final report, with testing results, shall be submitted no later than 60 days after contract award date.

The locks being tested are:
Lock and Dam No. 4 - Alma, WI 54610-4421
Lock and Dam No. 5 - Minnesota City, MN 55959-9756
Lock and Dam No. 5A - Fountain City, WI 54629-7214
Lock and Dam No. 8 - Genoa, WI 56432-0265
Lock and Dam No. 9 - Lynxville, WI 54626-8793

This synopsis is not a request for quotes (RFQ), proposals (RFP), or an invitation for bids (IFB). This is a pre-solicitation notice indicating that a solicitation for a competitive acquisition for the award of one firm-fixed price contract is intended to be issued via FedBizOpps (www.fbo.gov) in the near future.

This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. The definitive RFQ due date and time will be stated in the solicitation and any associated amendments that may be issued.


No CD's or hard copies will be available. Offerors are responsible for checking the referenced page for any update(s) to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the document posted at the referenced website.


In order for contractors to conduct business with the Department of Defense, the contractor must provide registration information to the System for Award Management (SAM). All Offerors must be fully registered in SAM prior to receiving an award, to include a current FAR & DFARS Representations & Certifications Report. Registration instructions may be obtained, and online registration may be accomplished, at www.sam.gov.



Attachments

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity