Company Operations Facility, (Intersection of Butts and Warfighter Roads), Fort Carson, Colorado
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9128F20R0001
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Colorado Springs CO 80902 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals for the construction of two Company Operations Facilities at Fort Carson, Colorado. The Department of the Army Corps of Engineers Engineering District Omaha requires the construction of administrative and readiness modules, covered hardstands, loading and service aprons, and supporting infrastructure. Proposals will be evaluated based on the offerors ability to commence work within 10 days of notice to proceed and complete the project within 640 calendar days. The deadline for proposal submission is April 30, 2020.
There is no set-aside designation for this procurement. The primary NAICS code is 237110 and PSC code S206. The facilities must be designed for a minimum 40-year life in accordance with Department of Defense standards. Construction is to take place at Fort Carson, Colorado over a period of no more than 640 calendar days from notice to proceed. Liquidated damages may be assessed if the completion deadline is not met.
Notice text
9 versions
Update #9 · Latest ·
2/28/2020 - RFP Issued
3/19/2020 - Am-0001 Issued - Adds FAR 52.204-24, 52.204-25 & 52.204-26; re-issues the 00 22 00; makes proposals due by email; reissues several drawings; and contains the site visit attendance list.
3/27/2020 - Am-0002 Issued - It revises the address on the SF1442, re-issues 8 specifications, and re-issues 36 drawings in response to bidder inquiries.
4/03/2020 - Am-0003 Issued - It re-issues 5 drawings and adds one new drawing in response to bidder inquiries.
4/13/2020-Am-0004 Issued - It adds the 6 missing drawings and makes a minor correction to the 00 22 00 in response to bidder inquiries.
4/16/2020-Am-0005 Issued - It makes a couple minor spec revisions and reissues 45 drawings in response to bidder inquiries.
4/16/2020-Am-0006 Issued. It reopens bidder inquiry and extends the proposal due date. Bidder inquiry will close COB 19 Apr 2020.
4/17/2020-Am-0007 Issued. It re-issues 7 drawings and adds 1 new drawing.
4/22/2020-AM-0008 Issued. It revises and re-issues 2 spec sections and 23 drawings.
Project Description (approx. quantities):
Construct two COFs. Project includes administrative module, readiness module, covered hardstand, loading/service aprons, information systems, fire protection and alarm systems, Intrusion Detection System (IDS) installation, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include site development, upgrades and repairs to Butts Road and Wilderness Road, intersection improvements, intersection signalization, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Electrical, heating, and air conditioning will be provided by standalone HVAC systems. Measures in accordance with the Department of Defense (DoD) Minimum Anti-terrorism for Buildings standards will be provided. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided as required. Due to high potential for expansive soils at Fort Carson, additional foundation design will be required. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities.
The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 640 calendar days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.
Update #8 ·
2/28/2020 - RFP Issued
3/19/2020 - Am-0001 Issued - Adds FAR 52.204-24, 52.204-25 & 52.204-26; re-issues the 00 22 00; makes proposals due by email; reissues several drawings; and contains the site visit attendance list.
3/27/2020 - Am-0002 Issued - It revises the address on the SF1442, re-issues 8 specifications, and re-issues 36 drawings in response to bidder inquiries.
4/03/2020 - Am-0003 Issued - It re-issues 5 drawings and adds one new drawing in response to bidder inquiries.
4/13/2020-Am-0004 Issued - It adds the 6 missing drawings and makes a minor correction to the 00 22 00 in response to bidder inquiries.
4/16/2020-Am-0005 Issued - It makes a couple minor spec revisions and reissues 45 drawings in response to bidder inquiries.
4/16/2020-Am-0006 Issued. It reopens bidder inquiry and extends the proposal due date. Bidder inquiry will close COB 19 Apr 2020.
4/17/2020-Am-0007 Issued. It re-issues 7 drawings and adds 1 new drawing.
Project Description (approx. quantities):
Construct two COFs. Project includes administrative module, readiness module, covered hardstand, loading/service aprons, information systems, fire protection and alarm systems, Intrusion Detection System (IDS) installation, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include site development, upgrades and repairs to Butts Road and Wilderness Road, intersection improvements, intersection signalization, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Electrical, heating, and air conditioning will be provided by standalone HVAC systems. Measures in accordance with the Department of Defense (DoD) Minimum Anti-terrorism for Buildings standards will be provided. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided as required. Due to high potential for expansive soils at Fort Carson, additional foundation design will be required. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities.
The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 640 calendar days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.
Update #7 ·
2/28/2020 - RFP Issued
3/19/2020 - Am-0001 Issued - Adds FAR 52.204-24, 52.204-25 & 52.204-26; re-issues the 00 22 00; makes proposals due by email; reissues several drawings; and contains the site visit attendance list.
3/27/2020 - Am-0002 Issued - It revises the address on the SF1442, re-issues 8 specifications, and re-issues 36 drawings in response to bidder inquiries.
4/03/2020 - Am-0003 Issued - It re-issues 5 drawings and adds one new drawing in response to bidder inquiries.
4/13/2020-Am-0004 Issued - It adds the 6 missing drawings and makes a minor correction to the 00 22 00 in response to bidder inquiries.
4/16/2020-Am-0005 Issued - It makes a couple minor spec revisions and reissues 45 drawings in response to bidder inquiries.
4/16/2020-Am-0006 Issued. It reopens bidder inquiry and extends the proposal due date. Bidder inquiry will close COB 19 Apr 2020.
Project Description (approx. quantities):
Construct two COFs. Project includes administrative module, readiness module, covered hardstand, loading/service aprons, information systems, fire protection and alarm systems, Intrusion Detection System (IDS) installation, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include site development, upgrades and repairs to Butts Road and Wilderness Road, intersection improvements, intersection signalization, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Electrical, heating, and air conditioning will be provided by standalone HVAC systems. Measures in accordance with the Department of Defense (DoD) Minimum Anti-terrorism for Buildings standards will be provided. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided as required. Due to high potential for expansive soils at Fort Carson, additional foundation design will be required. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities.
The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 640 calendar days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.
Update #6 ·
2/28/2020 - RFP Issued
3/19/2020 - Am-0001 Issued - Adds FAR 52.204-24, 52.204-25 & 52.204-26; re-issues the 00 22 00; makes proposals due by email; reissues several drawings; and contains the site visit attendance list.
3/27/2020 - Am-0002 Issued - It revises the address on the SF1442, re-issues 8 specifications, and re-issues 36 drawings in response to bidder inquiries.
4/03/2020 - Am-0003 Issued - It re-issues 5 drawings and adds one new drawing in response to bidder inquiries.
4/13/2020-Am-0004 Issued - It adds the 6 missing drawings and makes a minor correction to the 00 22 00 in response to bidder inquiries.
4/16/2020-Am-0005 Issued - It makes a couple minor spec revisions and reissues 45 drawings in response to bidder inquiries.
Project Description (approx. quantities):
Construct two COFs. Project includes administrative module, readiness module, covered hardstand, loading/service aprons, information systems, fire protection and alarm systems, Intrusion Detection System (IDS) installation, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include site development, upgrades and repairs to Butts Road and Wilderness Road, intersection improvements, intersection signalization, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Electrical, heating, and air conditioning will be provided by standalone HVAC systems. Measures in accordance with the Department of Defense (DoD) Minimum Anti-terrorism for Buildings standards will be provided. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided as required. Due to high potential for expansive soils at Fort Carson, additional foundation design will be required. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities.
The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 640 calendar days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.
Update #5 ·
2/28/2020 - RFP Issued
3/19/2020 - Am-0001 Issued - Adds FAR 52.204-24, 52.204-25 & 52.204-26; re-issues the 00 22 00; makes proposals due by email; reissues several drawings; and contains the site visit attendance list.
3/27/2020 - Am-0002 Issued - It revises the address on the SF1442, re-issues 8 specifications, and re-issues 36 drawings in response to bidder inquiries.
4/03/2020 - Am-0003 Issued - It re-issues 5 drawings and adds one new drawing in response to bidder inquiries.
4/13/2020-Am-0004 Issued - It adds the 6 missing drawings and makes a minor correction to the 00 22 00 in response to bidder inquiries.
Project Description (approx. quantities):
Construct two COFs. Project includes administrative module, readiness module, covered hardstand, loading/service aprons, information systems, fire protection and alarm systems, Intrusion Detection System (IDS) installation, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include site development, upgrades and repairs to Butts Road and Wilderness Road, intersection improvements, intersection signalization, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Electrical, heating, and air conditioning will be provided by standalone HVAC systems. Measures in accordance with the Department of Defense (DoD) Minimum Anti-terrorism for Buildings standards will be provided. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided as required. Due to high potential for expansive soils at Fort Carson, additional foundation design will be required. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities.
The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 640 calendar days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.
Update #4 ·
2/28/2020 - RFP Issued
3/19/2020 - Am-0001 Issued - Adds FAR 52.204-24, 52.204-25 & 52.204-26; re-issues the 00 22 00; makes proposals due by email; reissues several drawings; and contains the site visit attendance list.
3/27/2020 - Am-0002 Issued - It revises the address on the SF1442, re-issues 8 specifications, and re-issues 36 drawings in response to bidder inquiries.
4/03/2020 - Am-0003 Issued - It re-issues 5 drawings and adds one new drawing in response to bidder inquiries.
Project Description (approx. quantities):
Construct two COFs. Project includes administrative module, readiness module, covered hardstand, loading/service aprons, information systems, fire protection and alarm systems, Intrusion Detection System (IDS) installation, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include site development, upgrades and repairs to Butts Road and Wilderness Road, intersection improvements, intersection signalization, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Electrical, heating, and air conditioning will be provided by standalone HVAC systems. Measures in accordance with the Department of Defense (DoD) Minimum Anti-terrorism for Buildings standards will be provided. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided as required. Due to high potential for expansive soils at Fort Carson, additional foundation design will be required. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities.
The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 640 calendar days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.
Update #3 ·
2/28/2020 - RFP Issued
3/19/2020 - Am-0001 Issued - Adds FAR 52.204-24, 52.204-25 & 52.204-26; re-issues the 00 22 00; makes proposals due by email; reissues several drawings; and contains the site visit attendance list.
3/27/2020 - Am-0002 Issued - It revises the address on the SF1442, re-issues 8 specifications, and re-issues 36 drawings in response to bidder inquiries.
Project Description (approx. quantities):
Construct two COFs. Project includes administrative module, readiness module, covered hardstand, loading/service aprons, information systems, fire protection and alarm systems, Intrusion Detection System (IDS) installation, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include site development, upgrades and repairs to Butts Road and Wilderness Road, intersection improvements, intersection signalization, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Electrical, heating, and air conditioning will be provided by standalone HVAC systems. Measures in accordance with the Department of Defense (DoD) Minimum Anti-terrorism for Buildings standards will be provided. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided as required. Due to high potential for expansive soils at Fort Carson, additional foundation design will be required. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities.
The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 640 calendar days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.
Update #2 ·
2/28/2020 - RFP Issued
3/19/2020 - Am-0001 Issued - Adds FAR 52.204-24, 52.204-25 & 52.204-26; re-issues the 00 22 00; makes proposals due by email; reissues several drawings; and contains the site visit attendance list.
Project Description (approx. quantities):
Construct two COFs. Project includes administrative module, readiness module, covered hardstand, loading/service aprons, information systems, fire protection and alarm systems, Intrusion Detection System (IDS) installation, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include site development, upgrades and repairs to Butts Road and Wilderness Road, intersection improvements, intersection signalization, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Electrical, heating, and air conditioning will be provided by standalone HVAC systems. Measures in accordance with the Department of Defense (DoD) Minimum Anti-terrorism for Buildings standards will be provided. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided as required. Due to high potential for expansive soils at Fort Carson, additional foundation design will be required. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities.
The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 640 calendar days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.
Update #1 ·
2/28/2020 - RFP Issued
Project Description (approx. quantities):
Construct two COFs. Project includes administrative module, readiness module, covered hardstand, loading/service aprons, information systems, fire protection and alarm systems, Intrusion Detection System (IDS) installation, and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include site development, upgrades and repairs to Butts Road and Wilderness Road, intersection improvements, intersection signalization, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Electrical, heating, and air conditioning will be provided by standalone HVAC systems. Measures in accordance with the Department of Defense (DoD) Minimum Anti-terrorism for Buildings standards will be provided. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided as required. Due to high potential for expansive soils at Fort Carson, additional foundation design will be required. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities.
The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 640 calendar days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.
Files
Show all 16
Notice history
| Notice | Type | Posted |
|---|---|---|
| Company Operations Facility, (Intersection of Butts and Warfighter Roads), Fort Carson, Colorado | Award Notice | |
| This notice | Solicitation | |
| Company Operations Facility, (Intersection of Butts and Warfighter Roads), Fort Carson, Colorado | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX | ENDIST Louisville | Total Small Business | |
| Unaccompanied Enlisted Personnel Housing (UEPH) Barracks# 103 | ENDIST Fort Worth | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity