This request for proposal solicits bids for the construction of two company operations facilities at Fort Carson, Colorado. The project includes administrative modules, readiness modules, covered hardstands, site development, road and intersection improvements, utilities, lighting, paving, HVAC systems, fire protection systems, intrusion detection, energy monitoring controls, and interior design services. Facilities must be designed for a minimum 40-year life and comply with antiterrorism standards. The contractor must begin work within 10 days of notice to proceed and complete construction within 640 calendar days, or be subject to liquidated damages. Performance and payment bonds are required.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment No. 0007 W9128F
COMPANY OPERATIONS FACILITIES, PN 77303, INTERSECTION OF BUTTS AND WARFIGHTER ROADS (FY20), FORT
CARSON, COLORADO
See attached documentation for content of the amendment revisions to solicitation
Date for receipt of proposals is 30 APR 2020 at 1400 hours
Government Point of Contact: Bill Rawe, Contract Specialist, William.T.Rawe@usace.army.mil
U.S.ARMY CORPS OF ENGINEERS, OMAHA
Rocky Mountain Area Office Attn: CONTRACTING DIVISION (CENWO-CT-M) 5475 Tech Center Drive, Suite 205 Colorado Springs, CO 80919
See Item 6
W9128F-20-R-0001
04/17/2020
02/28/2020
04/17/2020
Am #0007 - 1
Am #0007 - 2 (Continuation SF 30)
17 April 2020 Solicitation No. W9128F 20 R 0001
Date of Issue: 28 FEB 2020 Date of Receiving Proposals: 30 APR 2020
SUBJECT: Amendment No. 0007 to Request for Proposal Solicitation Package for Construction of COMPANY OPERATIONS FACILITIES, PN 77303, INTERSECTION OF
BUTTS AND WARFIGHTER ROADS
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.) NONE
b. Specifications (New and/or Revised and Reissued). NONE
c. Drawings (Reissued). The following drawings are revised with latest revision date as shown in the drawing border, and reissued with this amendment.
Volume 1 of 3 – Six and Seven Company Site Facilities Package:
(1) Sheet G-002, VOLUME 1 INDEX - 1 OF 2
Volume 2 of 3 – Six Company Building Package:
(1) Sheet A-601, ROOM FINISH SCHEDULE
(2) Sheet A-603, DOOR SCHEDULE DETAILS
(3) Sheet M-603, HVAC SCHEDULES
Volume 3 of 3 – Seven Company Building Package:
(1) Sheet A-601, ROOM FINISH SCHEDULE
(2) Sheet A-603, DOOR SCHEDULE DETAILS
(3) Sheet M-603, HVAC SCHEDULES
d. Drawings (New). The following new drawings dated as indicated on the drawing border are hereby added to the request for proposal drawings and are issued with this amendment.
Volume 1 of 3 – Six and Seven Company Site Facilities Package:
(1) Sheet ES509, TRAFFIC SIGNAL ONE-LINE DIAGRAM
3. Electronic Proposals. Provide proposals via the instructions provided in Section 00 22 00 of the Request for Proposal.
4. Offers will be received until 2:00 p.m., local time at place of receiving proposals, 30 APR 2020.
Attachments:
Drawings listed in 1.c. and 1.d., above
Am #0007 - 3 (Continuation SF 30)
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
17 APR 2020
nep/2160
This page was intentionally left blank for duplex printing.
ROOM FINISH LEGEND:
ATC ACOUSTICAL TILE CEILING
CONC CONCRETE
CPT CARPET TILE
ETS EXPOSED TO STRUCTURE
GWB GYPSUM WALL BOARD (UNPAINTED)
IR IMPACT RESISTANT
GM WR GWB GLASS MAT WATER RESISTANT GYPSUM WALL BOARD
GPCONC GROUND AND POLISHED CONCRETE
LVT LUXURY VINYL TILE
MR MOISTURE RESISTANT
PCAST CONC PRECAST CONCRETE
PLYWD FIRE-RESITANT-TREATED WOOD, BEARING THE
MANUFACTURER'S FIRE RATED STAMP
PNT PAINT
PT PORCELAIN TILE
PWC PROTECTIVE WALL COVERING
RB RESILIENT BASE
WM WALK-OFF MAT
GWT GLAZED WALL TILE
GENERAL NOTES (APPLIES TO ALL ROOMS):
1. NORTH, SOUTH, EAST & WEST AS NOTED ON SCHEDULE SHALL BE IN ACCORDANCE
WITH PLAN NORTH AS INDICATED ON PLANS.
2. ALL CAST-IN-PLACE AND PRECAST CONCRETE WALL SURFACES SHALL BE PAINTED
UNLESS NOTED OTHERWISE IN THE ROOM SCHEDULE OR DESIGN DRAWINGS.
SEE SPECIFICATION SECTION 09 06 00, PAR. 2.3.3.1
3. SEE REFLECTED CEILING PLANS FOR ELEVATIONS OF SOFFITS, HEADERS,
BULKHEADS AND OTHER CEILING CONDITIONS NOT IDENTIFIED IN THE ROOM
FINISH SCHEDULE.
4. ALL EXPOSED GWB IN SPACES OTHER THAN SERVICE AND STORAGE SPACES
SHALL BE PAINTED.
5. FOR ITEMS IDENTIFIED AS "VARIES," SEE DESIGN DRAWINGS FOR MORE DETAIL.
6. CEILING HEIGHTS/ELEVATIONS IDENTIFIED IN ROOM FINISH SCHEDULE ARE HEIGHTS
ABOVE THEIR RESPECTIVE FINISHED FLOORS.
7. NOT USED.
8. PROVIDE PT-1 TO 4'-0" HT ON DRINKING FOUNTAIN WALLS, (UNO).
9. PROVIDE SOLID SURFACE WINDOW SILLS AT ALL WINDOWS.
10. REFER TO SPECIFICATION 09 06 00 COLOR SCHEDULE AND ARCHITECTURAL DETAILS
FOR COUNTER TOP MATERIALS.
11. PROVIDE CORNER GUARDS AT ALL EXPOSED OUTSIDE CORNERS IN CORRIDORS
AND VAULTS.
12. NOY USED
13. EXPOSED METAL DECK SHALL BE PAINTED, SEE SPEC. 09 06 00.
FINISH SCHEDULE NOTES:
1. WALK-OFF MAT 10' LONG IN DIRECTION OF TRAVEL.
2. 2 1/2" FURRING W/ GWB (PNT) AT NON-INSULATED AND INSULATED
PRECAST CONCRETE WALL. PT AS INDICATED.
3. PROVIDE 3/4" A/C FIRE RATED PLYWD THE ENTIRE LENGTH OF INDICATED
WALLS TO 8'-6" AFF. KEEP PLYWD AT LEAST 8" MIN FROM BOTTOM OF F.F.
FINISH SHALL BE CLEAR SEALER, FIRE RATED STAMP SHALL BE VISIBLE.
5. PROVIDE GWT WAINSCOT UP TO 48" @ JANITOR'S SINK.
6. NOT USED
7. NOT USED
8. ABUSE RESISTANT GYPSUM WALL BOARD.
9. NOT USED
10. MOISTURE RESISTANT CLG GYPSUM BOARD (PNT).
11. NOT USED
12. NOT USED
13. NOT USED
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I '
D
FI
LE
N A
M E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N U
M B
E R
1 2 3 4 5
D
C
B
A
A-601
R O
O M
F
IN
IS
H
S C
H E
D U
LE
FO
R
T C
AR
S
O N
, C O
LO
R
A D
O C
O M
PA
N
Y O
PE
R
AT
IO
N S
FA
C
IL
IT
IE
S
IN
TE
R
SE
C
TI
O N
O F
BU
TT
S
AN
D W
AR
FI
G H
TE
R
R O
AD
S
PN
(F Y2
0)
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
A
VE
O
M A
H A, N E
A . P
A R
K E
R
A . P
A R
K E
R
B . G
O R
U P
/2
6/
W
F-
-R
-0
FC
C
H _C
O F6
_D M
_A I.R
V T
F1
-8 5-
A
. P A
R K
E R
_ROOM FINISH SCHEDULE
WTWT ROOM NAME
WALL FINISH
BASE
FLOOR CEILINGS
NOTES & REMARKS (SEE NOTES)NORTH EAST SOUTH WEST MAT. MAT.
HEIGH
T
155 STOR/PRINT PNT PNT PNT PNT RB GPCONC ATC 9'-0" 2
156 1 SG PNT PNT PNT PNT RB CPT ATC 9'-0" 2
157 TRAINING ROOM PNT PNT PNT PNT RB LVT ATC 9'-0"
158 CONFERENCE PNT PNT PNT PNT RB CPT ATC 9'-0" 2
158A STOR. PNT PNT PNT PNT RB CPT ATC 9'-0"
159 CONFERENCE PNT PNT PNT PNT RB CPT ATC 9'-0" 2
159A STOR. PNT PNT PNT PNT RB CPT ATC 9'-0"
160 CONFERENCE PNT PNT PNT PNT RB CPT ATC 9'-0" 2
160A STOR. PNT PNT PNT PNT RB CPT ATC 9'-0"
161 FIRE SUPPRESSION PNT PNT PNT PNT RB CONC. EXPOSED VARIES
162 MECHANICAL PNT PNT PNT PNT RB CONC. EXPOSED VARIES
163 SIPR ROOM PLYWD PLYWD PLYWD PLYWD RB CONC. EXPOSED VARIES 3
164 MAIN COMM ROOM PLYWD PLYWD PLYWD PLYWD RB CONC. EXPOSED VARIES 3
165 ELECT. ROOM PNT PNT PNT PNT RB CONC. EXPOSED VARIES
166 COVERED HARDSTAND EXPOSED EXPOSED CONC. EXPOSED - CONC. EXPOSED VARIES
200 PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0"
200 MEZZANINE PNT PNT PNT PNT RB CONC. EXPOSED VARIES
201 MEZZANINE PNT PNT PNT PNT RB CONC. EXPOSED VARIES
201A TELECOM PLYWD PLYWD PLYWD PLYWD RB CONC. EXPOSED VARIES 3
201B PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
201C PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
201D PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
201E PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
202 MEZZANINE PNT PNT PNT PNT RB CONC. EXPOSED VARIES
202A PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
202B PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
202C PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
202D PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
203 MEZZANINE PNT PNT PNT PNT RB CONC. EXPOSED VARIES
203A PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
203B PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
203C PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
203D PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
204 MEZZANINE PNT PNT PNT PNT RB CONC. EXPOSED VARIES
204A PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
204B PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
204C PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
204D PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
204E TELECOM ROOM PLYWD PLYWD PLYWD PLYWD RB CONC. EXPOSED VARIES 3
205 MEZZANINE PNT PNT PNT PNT RB CONC. EXPOSED VARIES
205A PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
205B PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
205C PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
205D PLATOON OFFICE PNT PNT PNT PNT RB CONC. ATC 9'-0" 2
_ROOM FINISH SCHEDULE
WTWT ROOM NAME
WALL FINISH
BASE
FLOOR CEILINGS
NOTES & REMARKS (SEE NOTES)NORTH EAST SOUTH WEST MAT. MAT.
HEIGH
T
100 VESTIBULE PNT PNT PNT PNT PT PT GWB 9'-0" 1, 2
100A VESTIBULE PNT PNT PNT PNT PT PT GWB 9'-0" 1, 2
100B VESTIBULE PNT PNT PNT PNT PT PT GWB 9'-0" 1, 2
101 CORRIDOR PNT PNT PNT PNT RB GPCONC GWB 9'-0"
102 WOMEN PT/PNT PT/PNT PT/PNT PT/PNT PT PT GWB 9'-0" 10, 2
102A VEST. PT/PNT PT/PNT PT/PNT PT/PNT PT PT ATC 9'-0"
102B VEST. PT/PNT PT/PNT PT/PNT PT/PNT PT PT ATC 9'-0" 2
103 VENDING/RECYCLE PNT PNT PNT PNT RB GPCONC ATC 9'-0"
104 JANITOR PNT GWT/PNT GWT/PNT PNT PT PT ATC 9'-0" 5
105 RECYCLE/STOR PNT PNT PNT PNT RB GPCONC ATC 9'-0"
106 MEN PT/PNT PT/PNT PT/PNT PT/PNT PT PT GWB 9'-0" 10, 2
106A VEST. PT/PNT PT/PNT PT/PNT PT/PNT PT PT ATC 9'-0"
106B VEST. PT/PNT PT/PNT PT/PNT PT/PNT PT PT ATC 9'-0" 2
107 CONFERENCE PNT PNT PNT PNT RB CPT ATC 9'-0" 7, 2
107A STOR. PNT PNT PNT PNT RB CPT ATC 9'-0"
108 CONFERENCE PNT PNT PNT PNT RB CPT ATC 9'-0" 2
108A STOR. PNT PNT PNT PNT RB CPT ATC 9'-0"
109 CONFERENCE PNT PNT PNT PNT RB CPT ATC 9'-0" 2
109A STOR. PNT PNT PNT PNT RB CPT ATC 9'-0"
110 CORR. PNT PNT PNT PNT RB GPCONC ATC 9'-0"
111 TRAINING ROOM PNT PNT PNT PNT RB LVT ATC 9'-0"
112 1 SG PNT PNT PNT PNT RB CPT ATC 9'-0" 2
113 STOR/PRINT PNT PNT PNT PNT RB GPCONC ATC 9'-0" 2
114 CO.CDR. PNT PNT PNT PNT RB CPT ATC 9'-0" 2
115 XO PNT PNT PNT PNT RB CPT ATC 9'-0"
116 CORR. PNT PNT PNT PNT RB GPCONC ATC 9'-0"
117 TRAINING ROOM PNT PNT PNT PNT RB LVT ATC 9'-0"
118 1 SG PNT PNT PNT PNT RB CPT ATC 9'-0" 2
119 STOR/PRINT PNT PNT PNT PNT RB GPCONC ATC 9'-0" 2
120 CO.CDR. PNT PNT PNT PNT RB CPT ATC 9'-0" 2
121 XO PNT PNT PNT PNT RB CPT ATC 9'-0"
122 CORR. PNT PNT PNT PNT RB GPCONC ATC 9'-0"
123 PLATOON OFFICE PNT PNT PNT PNT RB LVT ATC 9'-0"
124 PLATOON OFFICE PNT PNT PNT PNT RB LVT ATC 9'-0" 2
125 STOR/PRINT PNT PNT PNT PNT RB GPCONC ATC 9'-0" 2
126 PLATOON OFFICE PNT PNT PNT PNT RB LVT ATC 9'-0" 2
127 PLATOON OFFICE PNT PNT PNT PNT RB LVT ATC 9'-0"
128 CORR. PNT PNT PNT PNT RB GPCONC ATC 9'-0"
129 TRAINING ROOM PNT PNT PNT PNT RB LVT ATC 9'-0"
130 1 SG PNT PNT PNT PNT RB CPT ATC 9'-0" 2
131 STOR/PRINT PNT PNT PNT PNT RB GPCONC ATC 9'-0" 2
132 CO.CDR. PNT PNT PNT PNT RB CPT ATC 9'-0" 2
133 XO PNT PNT PNT PNT RB CPT ATC 9'-0" 2
134 READINESS BAY A TA-50 STORAGE PNT PNT PNT PNT RB CONC. EXPOSED VARIES
134A SECURE NON-SENS STORAGE PNT PNT PNT PNT RB CONC. EXPOSED VARIES 8
134B UNIT STOR. PNT WIRE MESH WIRE MESH PNT RB CONC. GWB 9'-0"
134C COM. STOR. PT/GYP BD WIRE MESH WIRE MESH PT/GYP BD RB CONC. WIRE MESH 9'-0"
134D NBC STOR. WIRE MESH WIRE MESH WIRE MESH WIRE MESH - CONC. WIRE MESH 9'-0"
134E VAULT CONC. CONC. CONC. CONC. RB CONC. CONC. 10'-0"
134F JAN. GWT/GYP BD GWT/GYP BD GWT/GYP BD GWT/GYP BD RB CONC. 2X2 ACT 9'-0" 5
135 READINESS BAY B TA-50 STORAGE PT/GYP BD PT/GYP BD PT/GYP BD PT/GYP BD RB CONC. EXPOSED VARIES 135A SECURE NON-SENS STORAGE PT/GYP BD PT/GYP BD PT/GYP BD PT/GYP BD RB CONC. EXPOSED VARIES 8
135B UNIT STOR. WIRE MESH WIRE MESH WIRE MESH WIRE MESH RB CONC. WIRE MESH 9'-0"
135C COM. STOR PT/GYP BD WIRE MESH WIRE MESH PT/GYP BD RB CONC. WIRE MESH 9'-0"
135D NBC STOR. WIRE MESH WIRE MESH WIRE MESH WIRE MESH - CONC. WIRE MESH 9'-0"
135E VAULT CONC. CONC. CONC. CONC. RB CONC. CONC. 10'-0"
135F JAN. GWT/GYP BD GWT/GYP BD GWT/GYP BD GWT/GYP BD RB CONC. GWB 9'-0" 5
136 READINESS BAY C TA-50 STORAGE PT/GYP BD PT/GYP BD PT/GYP BD PT/GYP BD RB CONC. EXPOSED VARIES 136A SECURE NON-SENS STORAGE PT/GYP BD PT/GYP BD PT/GYP BD PT/GYP BD RB CONC. EXPOSED VARIES 8
136B UNIT STOR. WIRE MESH WIRE MESH WIRE MESH WIRE MESH RB CONC. WIRE MESH 9'-0"
136C COM. STOR PT/GYP BD WIRE MESH WIRE MESH PT/GYP BD RB CONC. WIRE MESH 9'-0"
136D NBC STOR. WIRE MESH WIRE MESH WIRE MESH WIRE MESH - CONC. WIRE MESH 9'-0"
136E VAULT CONC. CONC. CONC. CONC. RB CONC. CONC. 10'-0"
136F JAN. GWT/GYP BD GWT/GYP BD GWT/GYP BD GWT/GYP BD RB CONC. GWB 9'-0" 5
137 READINESS BAY D TA-50 STORAGE PT/GYP BD PT/GYP BD PT/GYP BD PT/GYP BD RB CONC. EXPOSED VARIES 137A SECURE NON-SENS STORAGE PT/GYP BD PT/GYP BD PT/GYP BD PT/GYP BD RB CONC. EXPOSED VARIES 8
137B UNIT STOR. WIRE MESH WIRE MESH WIRE MESH WIRE MESH RB CONC. WIRE MESH 9'-0"
137C COM. STOR. PT/GYP BD WIRE MESH WIRE MESH PT/GYP BD RB CONC. WIRE MESH 9'-0"
137D NBC STOR. WIRE MESH WIRE MESH WIRE MESH WIRE MESH - CONC. WIRE MESH 9'-0"
137E VAULT CONC. CONC. CONC. CONC. RB CONC. CONC. 10'-0"
137F JAN. GWT/GYP BD GWT/GYP BD GWT/GYP BD GWT/GYP BD RB CONC. GWB 9'-0" 5
138 READINESS BAY E TA-50 STORAGE PT/GYP BD PT/GYP BD PT/GYP BD PT/GYP BD RB CONC. EXPOSED VARIES 138A SECURE NON-SENS STORAGE PT/GYP BD PT/GYP BD PT/GYP BD PT/GYP BD RB CONC. EXPOSED VARIES 8
138B UNIT STOR. WIRE MESH WIRE MESH WIRE MESH WIRE MESH RB CONC. WIRE MESH 9'-0"
138C COM. STOR. PT/GYP BD WIRE MESH WIRE MESH PT/GYP BD RB CONC. WIRE MESH 9'-0"
138D NBC STOR. WIRE MESH WIRE MESH WIRE MESH WIRE MESH - CONC. WIRE MESH 9'-0"
138E VAULT CONC. CONC. CONC. CONC. RB CONC. CONC. 10'-0"
138F JAN. GWTGYP BD GWT/GYP BD GWT/GYP BD GWT/GYP BD RB CONC. GWB 9'-0" 5
139 READINESS BAY F TA-50 STORAGE PNT PNT PNT PNT RB CONC. EXPOSED VARIES
139A JAN. GWT/PNT PNT PNT GWT/PNT RB CONC. GWB 9'-0" 5
139B VAULT CONC. CONC. CONC. CONC. RB CONC. CONC. 9'-0"
139C COM. STOR. PT/GYP BD WIRE MESH WIRE MESH PT/GYP BD RB CONC. WIRE MESH 9'-0"
139D NBC STOR. WIRE MESH WIRE MESH WIRE MESH WIRE MESH - CONC. WIRE MESH 9'-0"
139E UNIT STOR. PNT PNT WIRE MESH WIRE MESH RB CONC. WIRE MESH 9'-0"
139F SECURE NON-SENS STORAGE PT/GYP BD PT/GYP BD PT/GYP BD PT/GYP BD RB CONC. EXPOSED VARIES 8
140 CORR. PNT PNT PNT PNT RB GPCONC ATC 9'-0"
141 XO PNT PNT PNT PNT RB CPT ATC 9'-0" 2
142 CO.CDR. PNT PNT PNT PNT RB CPT ATC 9'-0" 2
143 STOR/PRINT PNT PNT PNT PNT RB GPCONC ATC 9'-0" 2
144 1 SG PNT PNT PNT PNT RB CPT ATC 9'-0" 2
145 TRAINING ROOM PNT PNT PNT PNT RB LVT ATC 9'-0"
146 CORR. PNT PNT PNT PNT RB GPCONC ATC 9'-0"
147 XO PNT PNT PNT PNT RB CPT ATC 9'-0"
148 CO.CDR. PNT PNT PNT PNT RB CPT ATC 9'-0" 2
149 STOR/PRINT PNT PNT PNT PNT RB GPCONC ATC 9'-0" 2
150 1 SG PNT PNT PNT PNT RB CPT ATC 9'-0" 2
151 TRAINING ROOM PNT PNT PNT PNT RB LVT ATC 9'-0"
152 CORR. PNT PNT PNT PNT RB GPCONC ATC 9'-0"
153 XO PNT PNT PNT PNT RB CPT ATC 9'-0"
154 CO.CDR. PNT PNT PNT PNT RB CPT ATC 9'-0" 2
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
G
EN
ER
AL
R
EV
IS
IO
N
S
/1 8/
2 0
G
EN
ER
AL
R
EV
IS
IO
N
S
/2 6/
2 0
G
EN
ER
AL
R
EV
IS
IO
N
S
/1 6/
2 0
G
EN
ER
AL
R
EV
IS
IO
N
S
/1 7/
2 0
GENERAL NOTES
1. SEE ELECTRICAL DRAWINGS AND ASSOCIATED DETAIL DRAWINGS
FOR ELECTRICAL ACCESS CONTROL REQUIREMENTS. COORDINATE
ELECTRICAL EQUIPMENT INSTALLATION WITH EACH DOOR.
2. ALL EXTERIOR AND INTERIOR DOORS WITH ELECTRONIC
HARDWARE SHALL BE PROVIDED WITH 4 JAMB ANCHORS PER JAMB
MINIMUM. ALL OTHER DOORS SHALL BE PROVIDED WITH 3 JAMB
ANCHORS PER JAMB MINIMUM.
3. ALL EXTERIOR DOORS AND SIDELIGHTS SHALL BE PROVIDED WITH
LAMINATED UNITS IN AN INSULATED ASSEMBLY,
SEE SPECIFICATIONS.
4. ALL EXTERIOR WINDOWS SHALL BE COMPRISED OF TINT, LOW-E,
LAMINATED UNITS IN AN INSULATED ASSEMBLY,
SEE SPECIFICATIONS.
5. ALL EXTERIOR DOOR AND FRAME FASTENERS SHALL BE
TAMPER-PROOF SECURITY FASTENERS. EXTERIOR DOORS SHALL
BE PROVIDED WITH NO-REMOVABLE PINS IN THE HINGES.
6. ALL EXTERIOR DOORS & FRAMES ARE TO BE INSULATED.
7. COORDINATE DOOR SIZE WITH STRUCTURAL PRECASTER PRIOR
TO ORDERING MATERIALS.
8. SEE DETAIL 2/A-701 FOR ACCORDION FOLDING PARTITIONS DETAILS.
9. PROVIDE HASP TO ACCOMMODATE HIGH SECURITY PADLOCK AT ALL
NON-SENSITIVE SECURE STORAGE DOORS.
LEGEND
AL ALUMINUM
IGU INSULATED GLAZING UNIT
GL GLASS
HM HOLLOW METAL
STL STEEL
COMMENTS
1. WALL OPENING SIZES AND DOOR IS "APPROXIMATE," THE FINAL SIZE
TO BE AS DETERMINED BY THE VAULT DOOR MANUFACTURER.
2. DOOR THICKNESS IS "APPROXIMATE," THE FINAL THICKNESS TO BE
DETERMINED BY THE DOOR MANUFACTURER.
GLAZING TYPES
GT-1 1/4" CLEAR SAFETY GLASS (AT INTERIOR DOORS) OR
GT-2 1" INSULATED TINTED (BRONZE) LAMINATE SAFETY GLASS.
GT-3 1" INSULATED 45 MINUTE FIRE RATED CLEAR SAFETY GLASS
XXXXXX XXXXXXX XXXX
ROOM
1' - 0" TYP.
8" T
YP
1/8" THICK WHITE
ACRYLIC SHEET (TYP.)
2" HIGH BOLD
RED LETTERS (TYP.)
SIGN TYPES
F
AS
S
C H
ED
U
LE
D
SCHED
AS
A
AS
S
C H
ED
U
LE
D
SCHED
AS
NOTES:
1. MEDIUM STILE UNO
2. GT-1 @ NON-RATED INTERIOR DOORS
3. GT-2 @ EXTERIOR DOORS
4. GT-3 @ FIRE-RATED INTERIOR DOORS
3' -7
" M
AX
2' -6
B
AS
S
C H
ED
U
LE
D
SCHED
AS
AS
S
C H
ED
U
LE
D
D O
O R
T
YP
E
AN
D S
IZ
E
2"
2"
SCHED
AS 2"
E
AS
S
C H
ED
U
LE
D
SCHEDULED
AS
AS
S
C H
ED
U
LE
D
D O
O R
T
YP
E
AN
D S
IZ
E
2"
2"
SCHED
AS 2"
AS
S
C H
ED
U
LE
D
D O
O R
T
YP
E
AN
D S
IZ
E
SCHED
AS
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I '
D
FI
LE
N A
M E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N U
M B
E R
1 2 3 4 5
D
C
B
A
A-603
D O
O R
S C
H E
D U
LE
D E
TA
IL
S
FO
R
T C
AR
S
O N
, C O
LO
R
A D
O C
O M
PA
N
Y O
PE
R
AT
IO
N S
FA
C
IL
IT
IE
S
IN
TE
R
SE
C
TI
O N
O F
BU
TT
S
AN
D W
AR
FI
G H
TE
R
R O
AD
S
PN
(F Y2
0)
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
A
VE
O
M A
H A, N E
A . P
A R
K E
R
A . P
A R
K E
R
B . G
O R
U P
/2
6/
W
F-
-R
-0
FC
C
H _C
O F6
_D M
_A I.R
V T
F1
-8 5-
A
. P A
R K
E R
_DOOR SCHEDULE1
ROOM
NUMBER ROOM NAME TYPE
DOOR
FIRE
RATING STC
FRAME
HARDWARE COMMENTS:
SIZE
MATERIAL TYPE MATERIAL
DETAILS
WIDT
H HEIGHT THICKNESS HEAD JAMB SILL
139 READINESS BAY A 3'-0" 7'-0" 1 3/4" WD 1 HR - 1 HM 10/A-605 11/A-605 12/A-605 HW-17 -
139A JANITOR B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-05 -
139B VAULT F 4'-0" 6'-8" 4" MTL - 4 HM 8/A-605 7/A-605 9/A-605 HW-23 -
139EE UNIT STORAGE E 6'-0" 7'-0" 1 3/4" HM - - 3 HM 1/A-605 2/A-605 3/A-605 HW-12 - 139F SEC. NON-SENS. STOR. B 3'-0" 7'-0" 1 3/4" HM - - 1 HM 10/A-605 11/A-605 12/A-605 HW-13 - 139G READINESS BAY E 6'-0" 7'-0" 1 3/4" HM - - 2 HM 1/A-605 2/A-605 3/A-605 HW-15
141 XO A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
142 CO. COMMANDER A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
143 STORAGE A 2'-8" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 6/A-605 HW-20 -
144 1ST. SG. A 3'-0" 7'-0" 1 3/4" WD - 45 2 HM 10/A-605 11/A-605 12/A-605 HW-10 - 145 TRAINING ROOM A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-21 -
147 XO A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
148 CO. COMMANDER A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
149 STORAGE B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-05 -
150 1ST. SG. A 3'-0" 7'-0" 1 3/4" WD - 45 2 HM 10/A-605 11/A-605 12/A-605 HW-10 - 151 TRAINING ROOM A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-21 -
153 XO A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
154 CO. COMMANDER A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
155 STORAGE B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-05 -
156 1ST. SG. A 3'-0" 7'-0" 1 3/4" WD - 45 2 HM 10/A-605 11/A-605 12/A-605 HW-10 - 157 TRAINING ROOM A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-21 - 158 CONFERNENCE A 3'-0" 7'-0" 1 3/4" WD - 50 1 HM 10/A-605 11/A-605 12/A-605 HW-10 -
158A STORAGE A 2'-8" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-08 -
159 CONFERNENCE A 3'-0" 7'-0" 1 3/4" WD - 50 1 HM 10/A-605 11/A-605 12/A-605 HW-10 -
159A STORAGE A 2'-8" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-08 -
160 CONFERNENCE A 3'-0" 7'-0" 1 3/4" WD - 50 1 HM 10/A-605 11/A-605 12/A-605 HW-10 -
160A STORAGE A 2'-8" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-08 -
161 FIRE SUPPRESSION E 6'-0" 7'-0" 1 3/4" MTL - 3 HM 1/A-605 2/A-605 3/A-605 HW-12 - 162 MECHANICAL ROOM E 6'-0" 7'-0" 1 3/4" MTL - 3 HM 1/A-605 2/A-605 3/A-605 HW-16 - 163 FUTURE SIPERNET B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-18 164 MAIN COMM ROOM B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-19 165 ELECTRICAL ROOM B 3'-0" 7'-0" 1 3/4" MTL - 1 HM 1/A-605 2/A-605 3/A-605 HW-09 -
201A TELECOM ROOM B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-19 201B PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 201C PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 201D PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 201E PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 202A PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 202B PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 202C PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 202D PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 203A PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 203B PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 203C PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 203D PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 204A PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 204B PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 204C PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 204D PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 204E TELECOM ROOM B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-19 205A PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 205B PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 205C PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 - 205D PLATOON OFFICE A 3'-0" 7'-0" 1 3/4" WD - 45 1 HM 10/A-605 11/A-605 12/A-605 HW-10 -
C134B UNIT STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
C134C COM. STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
C134D NBC STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
C135B UNIT STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
C135C COM. STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
C135D NBC STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
C136B UNIT STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
C136C COM. STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
C136D NBC STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
C137B UNIT STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
C137C COM. STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
C137D NBC STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
C138B UNIT STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
C138C COM. STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
C138D NBC STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
C139C COM. STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
C139D NBC STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
C139E UNIT STORAGE N/A 3'-0" 7'-0" 1 3/4" WM - - - METAL MFR. MFR. MFR. HW-22
_DOOR SCHEDULE1
ROOM
NUMBER ROOM NAME TYPE
DOOR
FIRE
RATING STC
FRAME
HARDWARE COMMENTS:
SIZE
MATERIAL TYPE MATERIAL
DETAILS
WIDT
H HEIGHT THICKNESS HEAD JAMB SILL
100 VESTIBULE SF-1 6'-0" 6'-8 1/4" 2" ALUM SF ALUM 4/A-605 5/A-605 6/A-605 HW-03
100A VESTIBULE SF-3 3'-0" 6'-8 1/4" 2" ALUM - SF ALUM 4/A-605 5/A-605 6/A-605 HW-01 100B VESTIBULE SF-3 3'-0" 6'-8 1/4" 2" ALUM - SF ALUM 4/A-605 5/A-605 6/A-605 HW-01
101 CORRIDOR SF-2 6'-0" 6'-8 1/4" 2" ALUM SF ALUM 1/A-606 2/A-606 3/A-606 HW-04
101A CORRIDOR SF-4 3'-0" 6'-8 1/4" 2" ALUM - SF ALUM 1/A-606 2/A-606 3/A-606 HW-02 101B CORRIDOR SF-4 3'-0" 6'-8 1/4" 2" ALUM - SF ALUM 1/A-606 2/A-606 3/A-606 HW-02
102 WOMENS B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-07
102A VESTIBULE B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-07
102B VESTIBULE B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-07
102C VESTIBULE B 3'-0" 7'-0" 1 3/4" HM 1 HM 1/A-605 2/A-605 3/A-605 HW-09
104 JANITOR B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-05 -
105 RECYCLE/STORAGE B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-05 -
106 MENS B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-07
106A VESTIBULE B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-07
106B VESTIBULE B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-07
106C VESTIBULE B 3'-0" 7'-0" 1 3/4" HM 1 HM 1/A-605 2/A-605 3/A-605 HW-09
107 CONFERNENCE A 3'-0" 7'-0" 1 3/4" WD - 50 1 HM 10/A-605 11/A-605 12/A-605 HW-10 -
107A STORAGE A 2'-8" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-08 -
108 CONFERNENCE A 3'-0" 7'-0" 1 3/4" WD - 50 1 HM 10/A-605 11/A-605 12/A-605 HW-10 -
108A STORAGE A 2'-8" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-08 -
109 CONFERNENCE A 3'-0" 7'-0" 1 3/4" WD - 50 1 HM 10/A-605 11/A-605 12/A-605 HW-10 -
109A STORAGE A 2'-8" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-08 -
111 TRAINING ROOM A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-21 - 112 1ST. SG. A 3'-0" 7'-0" 1 3/4" WD - 45 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
113 STORAGE B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-05 -
114 CO. COMMANDER A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
115 XO A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
117 TRAINING ROOM A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-21 - 118 1ST. SG. A 3'-0" 7'-0" 1 3/4" WD - 45 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
119 STORAGE B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-05 -
120 CO. COMMANDER A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
121 XO A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
123 TRAINING ROOM A 3'-0" 7'-0" 1 3/4" WD - 45 2 HM 10/A-605 11/A-605 12/A-605 HW-21 - 124 1ST. SG. A 3'-0" 7'-0" 1 3/4" WD - 45 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
125 STORAGE B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-05 -
126 CO. COMMANDER A 3'-0" 7'-0" 1 3/4" WD - 45 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
127 XO A 3'-0" 7'-0" 1 3/4" WD - 45 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
129 TRAINING ROOM A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-21 - 130 1ST. SG. A 3'-0" 7'-0" 1 3/4" WD - 45 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
131 STORAGE B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-05 -
132 CO. COMMANDER A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
133 XO A 3'-0" 7'-0" 1 3/4" WD - 50 2 HM 10/A-605 11/A-605 12/A-605 HW-10 -
134 READINESS BAY A 3'-0" 7'-0" 1 3/4" WD 1 HR - 1 HM 10/A-605 11/A-605 12/A-605 HW-17 -
134A SEC. NON-SENS. STOR. B 3'-0" 7'-0" 1 3/4" HM - - 1 HM 10/A-605 11/A-605 12/A-605 HW-13 - 134BB UNIT STORAGE E 6'-0" 7'-0" 1 3/4" HM - 3 HM 1/A-605 2/A-605 3/A-605 HW-12 -
134E VAULT F 4'-0" 6'-8" 4" MTL - 4 HM 8/A-605 7/A-605 9/A-605 HW-23 -
134F JANITOR B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-05 -
134G READINESS BAY E 6'-0" 7'-0" 1 3/4" HM - 2 HM 1/A-605 2/A-605 3/A-605 HW-15
135 READINESS BAY A 3'-0" 7'-0" 1 3/4" WD 1 HR - 1 HM 10/A-605 11/A-605 12/A-605 HW-17 -
135A SEC. NON-SENS. STOR. B 3'-0" 7'-0" 1 3/4" HM - - 1 HM 10/A-605 11/A-605 12/A-605 HW-13 -
135E VAULT F 4'-0" 6'-8" 4" MTL - 4 HM 8/A-605 7/A-605 9/A-605 HW-23 -
135F JANITOR B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-05 -
135G READINESS BAY E 6'-0" 7'-0" 1 3/4" HM - 2 HM 1/A-605 2/A-605 3/A-605 HW-15
136 READINESS BAY A 3'-0" 7'-0" 1 3/4" WD 1 HR - 1 HM 10/A-605 11/A-605 12/A-605 HW-17 -
136A SEC. NON-SENS. STOR. B 3'-0" 7'-0" 1 3/4" HM - - 1 HM 10/A-605 11/A-605 12/A-605 HW-13 - 136BB UNIT STORAGE E 6'-0" 7'-0" 1 3/4" HM - 3 HM 1/A-605 2/A-605 3/A-605 HW-12 -
136E VAULT F 4'-0" 6'-8" 4" MTL - 4 HM 8/A-605 7/A-605 9/A-605 HW-23 -
136F JANITOR B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-05 -
136G READINESS BAY E 6'-0" 7'-0" 1 3/4" HM - 2 HM 1/A-605 2/A-605 3/A-605 HW-15
137 READINESS BAY A 3'-0" 7'-0" 1 3/4" WD 1 HR - 1 HM 10/A-605 11/A-605 12/A-605 HW-17 -
137A SEC. NON-SENS. STOR. B 3'-0" 7'-0" 1 3/4" HM - - 1 HM 10/A-605 11/A-605 12/A-605 HW-13 - 137BB UNIT STORAGE E 6'-0" 7'-0" 1 3/4" MTL - 3 HM 1/A-605 2/A-605 3/A-605 HW-12 -
137E VAULT F 4'-0" 6'-8" 4" MTL - 4 HM 8/A-605 7/A-605 9/A-605 HW-23 -
137F JANITOR B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-05 -
137G READINESS BAY E 6'-0" 7'-0" 1 3/4" HM - 2 HM 1/A-605 2/A-605 3/A-605 HW-15
138 READINESS BAY A 3'-0" 7'-0" 1 3/4" WD 1 HR - 1 HM 10/A-605 11/A-605 12/A-605 HW-17 -
138A SEC. NON-SENS. STOR. B 3'-0" 7'-0" 1 3/4" HM - - 1 HM 10/A-605 11/A-605 12/A-605 HW-13 - 138BB UNIT STORAGE E 6'-0" 7'-0" 1 3/4" MTL - 3 HM 1/A-605 2/A-605 3/A-605 HW-12 -
138E VAULT F 4'-0" 6'-8" 4" MTL - 4 HM 8/A-605 7/A-605 9/A-605 HW-23 -
138F JANITOR B 3'-0" 7'-0" 1 3/4" WD - - 1 HM 10/A-605 11/A-605 12/A-605 HW-05 -
138G READINESS BAY E 6'-0" 7'-0" 1 3/4" HM - 2 HM 1/A-605 2/A-605 3/A-605 HW-15
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
G
EN
ER
AL
R
EV
IS
IO
N
S
/2 6/
2 0
G
EN
ER
AL
R
EV
IS
IO
N
S
/1 6/
2 0
G
EN
ER
AL
R
EV
IS
IO
N
S
/1 7/
2 0
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I '
D
FI
LE
N A
M E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N U
M B
E R
1 2 3 4 5
D
C
B
A
M-603
H V
A C
S C
H E
D U
LE
S
FO
R
T C
AR
SO
N , C
O
LO
R
AD
O C
O M
PA
N
Y O
PE
R
AT
IO
N S
FA
C
IL
IT
IE
S
IN
TE
R
SE
C
TI
O N
O F
BU
TT
S
AN
D W
AR
FI
G H
TE
R
R O
AD
S
PN
(F Y2
0)
C A
P
IT
O L
A V
E
O M
A H
A, N
E . 6
J.
S.
E.
J.
S.
E.
M .T
.S
/2
6/
W
F-
-R
-0
FC
C
H _C
O F6
_D M
_M E
.R V
T
F1
-8 5-
M
.T .S
PUMP SCHEDULE
MARK SYSTEM TYPE FLOW HEAD MIN. EFF. MANUFACTURER MODEL REMARKS
CWP-1 CHILLED WATER INLINE 65 65 55% BELL & GOSSETT - 1, 2, 3
CWP-2 CHILLED WATER INLINE 65 65 55% BELL & GOSSETT - 1, 2, 3
HWP-1 HEATING WATER INLINE 90 60 55% BELL & GOSSETT - 1, 2, 3
HWP-2 HEATING WATER INLINE 90 60 55% BELL & GOSSETT - 1, 2, 3
GLYCOL FEEDER SCHEDULE
WT SYSTEM VOLUME % GLYCOL
MANUFACTU
RER MODEL REMARKS
GF-1 HEATING WATER 50 GAL. 25% NEPTUNE G-50-1
GF-2 CHILLED WATER 50 GAL. 25% NEPTUNE G-50-1
EXPANSION TANK SCHEDULE
MARK SYSTEM TYPE TANK VOLUME
MAX. ACCEPTANCE
VOLUME MANUFACTURER MODEL REMARKS
ET-1 HEATING WATER BLADDER 10 GAL. 2.4 GAL. AMTROL EXTROL- AX-20(V)
ET-2 CHILLED WATER BLADDER 10 GAL. 2.4 GAL. AMTROL EXTROL- AX-20(V)
AIR SEPERATOR SCHEDULE
MARK SYSTEM FLOW
MAX
P-DROP MANUFACTURER MODEL REMARKS
AS-1 HEATING WATER 65.0 GPM 0.5 SPIROVENT VSR250
AS-2 CHILLED WATER 90.0 GPM 0.5 SPIROVENT VSR300
REMARKS:
1. SHALL BE VFD COMPATABLE.
2. SYSTEM CONTAINS 25% GLYCOL.
3. CHILLED WATER PUMPS AND HEATING WATER PUMPS ARE SIZE FOR BUILDING BLOCK LOAD. THE PUMPS ARE
NOT SIZED TO PROVIDE FULL FLOW TO ALL COILS SIMULTANEOUSLY.
LOUVERED PENTHOUSE SCHEDULE
MARK SERVES SYSTEM Model CFM
MAX. PRESS.
DROP (IN. H20)
MANUFACTUR
ER REMARKS
IH-1 BC-01 INTAKE WIH-28X28 2500 0.05 GREENHECK 1
IH-2 BC-02 INTAKE WIH-22X22 1700 0.05 GREENHECK 1
IH-3 BC-03 INTAKE WIH-22X22 1700 0.05 GREENHECK 1
IH-4 BC-04 INTAKE WIH-22X22 1700 0.05 GREENHECK 1
IH-5 BC-05 INTAKE WIH-22X22 1700 0.05 GREENHECK 1
IH-6 BC-06 INTAKE WIH-28X28 2500 0.05 GREENHECK 1
IH-7 BC-07 EXHAUST WIH-12X12 500 0.08 GREENHECK 1
IH-8 AHU-1 INTAKE WIH-48X48 8000 0.05 GREENHECK 1
EH-1 BC-01 EXHAUST WRH-14X14 750 0.08 GREENHECK 2
EH-2 BC-02 EXHAUST GRSI-12 515 0.08 GREENHECK 2
EH-3 BC-03 EXHAUST GRSI-12 515 0.08 GREENHECK 2
EH-4 BC-04 EXHAUST GRSI-12 515 0.08 GREENHECK 2
EH-5 BC-05 EXHAUST GRSI-12 515 0.08 GREENHECK 2
EH-6 BC-06 EXHAUST WRH-14X14 750 0.08 GREENHECK 2
EH-7 BC-07 EXHAUST GRSI-12 515 0.08 GREENHECK 2
EH-8 AHU-1 EXHAUST WRH-42X42 8000 0.08 GREENHECK 2
RH-1 BC-01 RELIEF WRH-28X28 2500 0.06 GREENHECK 3
RH-2 BC-02 RELIEF WRH-22X22 1700 0.06 GREENHECK 3
RH-3 BC-03 RELIEF WRH-22X22 1700 0.06 GREENHECK 3
RH-4 BC-04 RELIEF WRH-22X22 1700 0.06 GREENHECK 3
RH-5 BC-05 RELIEF WRH-22X22 1700 0.06 GREENHECK 3
RH-6 BC-06 RELIEF WRH-28X28 2500 0.06 GREENHECK 3
REMARKS:
1. BASED ON GREENHECK MODEL WIH INTAKE
2. EXHAUST PENTHOUSE
3. RELIEF PENTHOUSE GENERAL NOTE:
1. EQUIPMENT SELECTIONS SHALL BE FOR 5870 FT. ELEVATION
2. ALL HEATING COILS OPERATE WITH 140°F SUPPLY AND 120°F RETURN WATER TEMPERATURES WITH 25%
GLYCOL.
3. ALL COOLING COILS OPERATE WITH 42°F SUPPLY AND 54°F RETURN WATER TEMPERATURES WITH 25%
GLYCOL.
4. WHERE THE MANUFACTURER AND/OR MODEL NUMBER IS LISTED, IT IS INTENDED TO INDICATE THE "BASIS OF DESIGN" ONLY. IT IS NOT INTENDED TO LIMIT THE EQUIPMENT PROVIDED TO THAT INDICATED IN THE SCHEDULE.
OTHER MANUFACTURERS OR MODELS OF EQUIPMENT MAY BE PROVIDED. ALL EQUIPMENT PROVIDED SHALL
MEET THE REQUIREMENTS OF THE APPLICABLE SCHEDULE AND SPECIFICATIONS.
5. VFDS CANNOT BE INSTALLED INTERNAL TO THE EQUIPMENT.
CHILLER SCHEDULE
MARK
COMPRESSOR
TYPE SERVES GPM
WATER TEMP
IN/OUT (DEG. F) CIRCUITS NPLV IPLV TONNAGE MANUFACTURER MODEL REMARKS
C-1 SCROLL CHILLED WATER 45 55/45 2 13.7 EER 14.2 SEER 20 TRANE CGAM 1, 2, 3, 4, 5, 6
REMARKS:
1. OUTPUT LISTED MUST BE ACHIEVED AT AN ELEVATION OF 5870 FEET ABOVE SEA LEVEL AND WITH A MIXTURE
OF 25% PROPYLENE GLYCOL AND 75% WATER.
2. CHILLER WILL BE PROVIDED WITH 2 INTEGRAL PUMPS.
3. WATER WILL CONTAIN 25% GLYCOL
4. FACTORY-MOUNTED SERVICE SUCTION AND DISCHARGE (BALL TYPE) ISOLATION VALVES, EACH SYSTEM.
5. PROVIDE WITH FULLY LOUVERED, LOCKABLE PANELS SUCH THAT OBJECTS CAN NOT BE SECURED OR
CONCEALED WITHIN OR UNDERNEATH CHILLER.
6. PROVIDE WITH FACTORY INSTALLED 140 GALLON BUFFER TANK.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
G
EN
ER
AL
R
EV
IS
IO
N
S
/1 6/
2 0
BOILER SCHEDULE
MARK SERVES
OUTPUT
CAPACITY
WATER TEMP
IN/OUT (DEG. F)
THERMAL
EFFICIENCY MANUFACTURER MODEL REMARKS
B-1 HEATING WATER 373,000 Btu/h 120/140 92% PEERLESS PF-399 1, 2, 3 B-2 HEATING WATER 373,000 Btu/h 120/140 92% PEERLESS PF-399 1, 2, 3
REMARKS:
1. OUTPUT LISTED MUST BE ACHIEVED AT 5870 FEET ABOVE SEA LEVEL.
2. INCLUDE BOILER PUMP SIZED FOR 20 DEGREES DELTA T AT FULL FIRE IF BOILER DOES NOT HAVE AN INTERNAL PUMP.
3. WATER WILL CONTAIN 25% GLYCOL.
ROOM FINISH LEGEND:
ATC ACOUSTICAL TILE CEILING
CONC CONCRETE
CPT CARPET TILE
ETS EXPOSED TO STRUCTURE
GWB GYPSUM WALL BOARD (UNPAINTED)
ARGWB ABUSE RESISTANT GWB
GM WR GWB GLASS MAT WATER RESISTANT GYPSUM WALL BOARD
GPCONC GROUND AND POLISHED CONCRETE
LVT LUXURY VINYL TILE
MR MOISTURE RESISTANT
PCAST CONC PRECAST CONCRETE
PLYWD FIRE-RESISTANT-TREATED WOOD, BEARING THE
MANUFACTURER'S FIRE RATED STAMP
PNT PAINT
PT PORCELAIN TILE
RB RESILIENT BASE
GWT GLAZED WALL TILE
FINISH SCHEDULE NOTES:
1. WALK-OFF MAT 10' LONG IN DIRECTION OF TRAVEL.
2. 2 1/2" FURRING W/ GWB (PNT) AT NON-INSULATED AND INSULATED
PRECAST CONCRETE WALL. PT AS INDICATED.
3. PROVIDE 3/4" A/C FIRE RATED PLYWD THE ENTIRE LENGTH OF INDICATED
WALLS TO 8'-6" AFF. KEEP PLYWD AT LEAST 8" MIN FROM BOTTOM OF F.F.
FINISH SHALL BE CLEAR SEALER, FIRE RATED STAMP SHALL BE VISIBLE.
5. PROVIDE GWT WAINSCOT UP TO 48" @ JANITOR'S SINK.
6. NOT USED
7. NOT USED
8. ABUSE RESISTANT GYPSUM WALL BOARD.
9. NOT USED
10. MOISTURE RESISTANT CLG GYPSUM BOARD (PNT).
11. NOT USED
12. NOT USED
13. NOT USED
GENERAL NOTES (APPLIES TO ALL ROOMS):
1. NORTH, SOUTH, EAST & WEST AS NOTED ON SCHEDULE SHALL BE IN ACCORDANCE
WITH PLAN NORTH AS INDICATED ON PLANS.
2. ALL CAST-IN-PLACE AND PRECAST CONCRETE WALL SURFACES SHALL BE PAINTED
UNLESS NOTED OTHERWISE IN THE ROOM SCHEDULE OR DESIGN DRAWINGS.
SEE SPECIFICATION SECTION 09 06 00, PAR. 2.3.3.1
3. SEE REFLECTED CEILING PLANS FOR ELEVATIONS OF SOFFITS, HEADERS,
BULKHEADS AND OTHER CEILING CONDITIONS NOT IDENTIFIED IN THE ROOM
FINISH SCHEDULE.
4. ALL EXPOSED GWB IN SPACES OTHER THAN SERVICE AND STORAGE SPACES
SHALL BE PAINTED.
5. FOR ITEMS IDENTIFIED AS "VARIES," SEE DESIGN DRAWINGS FOR MORE DETAIL.
6. CEILING HEIGHTS/ELEVATIONS IDENTIFIED IN ROOM FINISH SCHEDULE ARE HEIGHTS
ABOVE THEIR RESPECTIVE FINISHED FLOORS.
7. NOT USED.
8. PROVIDE PT-1 TO 4'-0" HT ON DRINKING FOUNTAIN WALLS, (UNO).
9. PROVIDE SOLID SURFACE WINDOW SILLS AT ALL WINDOWS.
10. REFER TO SPECIFICATION 09 06 00 COLOR SCHEDULE AND ARCHITECTURAL DETAILS
FOR COUNTER TOP MATERIALS.
11. PROVIDE CORNER GUARDS AT ALL EXPOSED OUTSIDE CORNERS IN CORRIDORS
AND VAULTS.
12. PROVIDE RESILIENT FLOORING TREADS, RISERS AND LANDINGS, AS INDICATED.
13. EXPOSED METAL DECK SHALL BE PAINTED, SEE SPEC. 09 06 00.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I '
D
FI
LE
N A
M E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N U
M B
E R
1 2 3 4 5
D
C
B
A
A-601
R O
O M
F
IN
IS
H
S C
H E
D U
LE
FO
R
T C
AR
S
O N
, C O
LO
R
A D
O C
O M
PA
N
Y O
PE
R
AT
IO
N S
FA
C
IL
IT
IE
S
IN
TE
R
SE
C
TI
O N
O F
BU
TT
S
AN
D W
AR
FI
G H
TE
R
R O
AD
S
PN
(F Y2
0)
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
A
VE
O
M A
H A, N E
A . P
A R
K E
R
A . P
A R
K E
R
B . G
O R
U P
/2
6/
W
F-
-R
-0
FC
C
H _C
O F7
_D M
_A I.R
V T
F1
-8 5-
A
. P A
R K
E R
_ROOM FINISH SCHEDULE - PART 1
WT ROOM NAME
WALL FINISH
BASE
FLOOR CEILINGS NOTES & REMARKS (SEE
NOTES)NORTH EAST SOUTH WEST MAT. MAT. HEIGHT
155 CO.CDR. PNT PNT PNT PNT RB CPT ATC 9'-0" 2
156 STOR/PRINT PNT PNT PNT PNT RB GPCONC ATC 9'-0" 2
157 1 SG PNT PNT PNT PNT RB CPT ATC 9'-0" 2
158 TRAINING ROOM PNT PNT PNT PNT RB LVT ATC 9'-0"
159 CONFERENCE PNT PNT PNT PNT RB CPT ATC 9'-0" 2
159A STOR. PNT PNT PNT PNT RB CPT ATC 9'-0"
160 CONFERENCE PNT PNT PNT PNT RB CPT ATC 9'-0" 2
160A STOR. PNT PNT PNT PNT RB CPT ATC 9'-0"
161 CONFERENCE PNT PNT PNT PNT RB CPT ATC 9'-0" 2
161A STOR. PNT PNT PNT PNT RB CPT ATC 9'-0"
162 FIRE SUPPRESSION PNT PNT PNT PNT RB CONC EXPOSED 9'-0"
163 MECHANICAL PNT PNT PNT PNT RB CONC EXPOSED 9'-0"
164 SIPR ROOM PLYWD PLYWD PLYWD PLYWD RB CONC EXPOSED VARIES
165 MAIN COMM ROOM PLYWD PLYWD PLYWD PLYWD RB CONC EXPOSED VARIES 3
166 ELECT. ROOM PNT PNT PNT PNT RB CONC EXPOSED VARIES
200 MEZZANINE PNT PNT PNT PNT RB CONC EXPOSED VARIES
200A PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
200B PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
200C PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
200D PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
200E PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
201 MEZZANINE PNT PNT PNT PNT RB CONC EXPOSED VARIES
201A PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
201B PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
201C PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
201D PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
201E TELECOM ROOM PLYWD PLYWD PLYWD PLYWD RB CONC EXPOSED VARIES 3
202 MEZZANINE PNT PNT PNT PNT RB CONC EXPOSED VARIES
202A PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
202B PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
202C PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
202D PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
203 MEZZANINE PNT PNT PNT PNT RB CONC EXPOSED VARIES
203A PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
203B PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
203C PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
203D PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
204 MEZZANINE PNT PNT PNT PNT RB CONC EXPOSED VARIES
204A PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
204B PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
204C PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
204D PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
205 MEZZANINE PNT PNT PNT PNT RB CONC EXPOSED VARIES
205A TELECOM ROOM PLYWD PLYWD PLYWD PLYWD RB CONC EXPOSED VARIES 3
205B PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
205C PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
205D PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
205E PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
206 MEZZANINE PNT PNT PNT PNT RB CONC EXPOSED VARIES
206A PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
206B PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
206C PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
206D PLATOON OFFICE PNT PNT PNT PNT RB CONC ATC 9'-0" 2
_ROOM FINISH SCHEDULE - PART 1
WT ROOM NAME
WALL FINISH
BASE
FLOOR CEILINGS NOTES & REMARKS (SEE
NOTES)NORTH EAST SOUTH WEST MAT. MAT. HEIGHT
100 VEST. PNT PNT PNT PNT PT PT GWB 9'-0" 1, 2
100A VEST. PNT PNT PNT PNT PT PT GWB 9'-0" 1, 2
100B VEST. PNT PNT PNT PNT PT PT GWB 9'-0" 1, 2
101 CORRIDOR PNT PNT PNT PNT RB GPCONC ATC 9'-0"
102 WOMEN PT/PNT PT/PNT PT/PNT PT/PNT PT PT GWB 9'-0" 10, 2
102A VEST. PT/PNT PT/PNT PT/PNT PT/PNT PT PT ATC 9'-0"
102B VEST. PT/PNT PT/PNT PT/PNT PT/PNT PT PT ATC 9'-0" 2
103 VENDING/RECYCLE PNT PNT PNT PNT RB GPCONC ATC 9'-0"
104 JANITOR PNT GWT/PNT GWT/PNT PNT PT PT ATC 9'-0" 5
105 RECYCLE/STOR PNT PNT PNT PNT RB GPCONC ATC 9'-0" 10
106 MEN PT/PNT PT/PNT PT/PNT PT/PNT PT PT GWB 9'-0" 2
106A VEST. PT/PNT PT/PNT PT/PNT PT/PNT PT PT ATC 9'-0"
106B VEST. PT/PNT PT/PNT PT/PNT PT/PNT PT PT ATC 9'-0" 2
107 CONFERENCE PNT PNT PNT PNT RB CPT ATC 9'-0" 2
107A STOR. PNT PNT PNT PNT RB CPT ATC 9'-0"
108 CONFERENCE PNT PNT PNT PNT RB CPT ATC 9'-0" 2
108A STOR. PNT PNT PNT PNT RB CPT ATC 9'-0"
109 CONFERENCE PNT PNT PNT PNT RB CPT ATC 9'-0" 2
109A STOR. PNT PNT PNT PNT RB CPT ATC 9'-0"
110 CORR. PNT PNT PNT PNT RB GPCONC ATC 9'-0"
111 TRAINING ROOM PNT PNT PNT PNT RB LVT ATC 9'-0"
112 1 SG PNT PNT PNT PNT RB CPT ATC 9'-0" 2
113 STOR/PRINT PNT PNT PNT PNT RB CPT ATC 9'-0" 2
114 CO.CDR. PNT PNT PNT PNT RB CPT ATC 9'-0" 2
115 XO PNT PNT PNT PNT RB CPT ATC 9'-0"
116 CORR. PNT PNT PNT PNT RB GPCONC ATC 9'-0"
117 TRAINING ROOM PNT PNT PNT PNT RB LVT ATC 9'-0"
118 1ST. SG. PNT PNT PNT PNT RB CPT ATC 9'-0" 2
119 STOR/PRINT PNT PNT PNT PNT RB CPT ATC 9'-0" 2
120 CO.CDR. PNT PNT PNT PNT RB CPT ATC 9'-0" 2
121 XO PNT PNT PNT PNT RB CPT ATC 9'-0"
122 CORR. PNT PNT PNT PNT RB GPCONC ATC 9'-0"
123 TRAINING ROOM PNT PNT PNT PNT RB LVT ATC 9'-0"
124 1 SG PNT PNT PNT PNT RB CPT ATC 9'-0" 2
125 STOR/PRINT PNT PNT PNT PNT RB GPCONC ATC 9'-0" 2
126 CO.CDR. PNT PNT PNT PNT RB CPT ATC 9'-0" 2
127 XO PNT PNT PNT PNT RB CPT ATC 9'-0"
128 CORR. PNT PNT PNT PNT RB GPCONC ATC 9'-0"
129 TRAINING ROOM PNT PNT PNT PNT RB LVT ATC 9'-0"
130 1 SG PNT PNT PNT PNT RB CPT ATC 9'-0" 2
131 STOR/PRINT PNT PNT PNT PNT RB GPCONC ATC 9'-0" 2
132 CO.CDR. PNT PNT PNT PNT RB CPT ATC 9'-0" 2
133 XO PNT PNT PNT PNT RB CPT ATC 9'-0"
134 READINESS BAY A TA-50 STORAGE PNT PNT PNT PNT RB CONC EXPOSED VARIES
134A SECURE NON-SENS STORAGE PNT PNT PNT PNT RB CONC EXPOSED VARIES 8
134B UNIT STOR. PNT WIRE MESH PNT WIRE MESH RB CONC WIRE MESH 9'-0"
134C COM. STOR PNT WIRE MESH WIRE MESH WIRE MESH RB CONC WIRE MESH 9'-0"
134D NBC STOR. WIRE MESH WIRE MESH WIRE MESH WIRE MESH RB CONC WIRE MESH 9'-0"
134E VAULT CONC. CONC. CONC. CONC. RB CONC CONC. 10'-0"
134F JAN. GWT/PNT GWT/PNT PNT PNT RB CONC GWB 9'-0"
135 READINESS BAY B TA-50 STORAGE PT/GYP BD PT/GYP BD PT/GYP BD PT/GYP BD RB CONC EXPOSED VARIES
135A SECURE NON-SENS STORAGE PNT PNT PNT PNT RB CONC EXPOSED VARIES 8
135B UNIT STOR. PNT WIRE MESH WIRE MESH PNT RB CONC WIRE MESH 9'-0"
135C COM. STOR PNT WIRE MESH WIRE MESH WIRE MESH RB CONC WIRE MESH 9'-0"
135D NBC STOR. WIRE MESH WIRE MESH WIRE MESH WIRE MESH - CONC WIRE MESH 9'-0"
135E VAULT CONC. CONC. CONC. CONC. RB CONC CONC. 10'-0"
135F JAN. GWT/PNT GWT/PNT PNT PNT RB CONC GWB 9'-0"
136 READINESS BAY C TA-50 STORAGE PNT PNT PNT PNT RB CONC EXPOSED VARIES
136A SECURE NON-SENS STORAGE PNT PNT PNT PNT RB CONC EXPOSED VARIES 8
136B UNIT STOR. PNT WIRE MESH WIRE MESH PNT RB CONC WIRE MESH 9'-0"
136C COM. STOR. PNT WIRE MESH WIRE MESH WIRE MESH RB CONC WIRE MESH 9'-0"
136D NBC STOR. WIRE MESH WIRE MESH WIRE MESH WIRE MESH - CONC WIRE MESH 9'-0"
136E VAULT CONC. CONC. CONC. CONC. RB CONC CONC. 10'-0"
136F JAN. GWT/PNT GWT/PNT PNT PNT RB CONC GWB 9'-0"
137 READINESS BAY D TA-50 STORAGE PNT PNT PNT PNT RB CONC EXPOSED VARIES
137A SECURE NON-SENS STORAGE PNT PNT PNT PNT RB CONC EXPOSED VARIES 8
137B UNIT STOR. PNT WIRE MESH WIRE MESH PNT RB CONC WIRE MESH 9'-0"
137C COM. STOR. PNT WIRE MESH WIRE MESH WIRE MESH RB CONC WIRE MESH 9'-0"
137D NBC STOR. WIRE MESH WIRE MESH WIRE MESH WIRE MESH - CONC WIRE MESH 9'-0"
137E VAULT CONC. CONC. CONC. CONC. RB CONC CONC. 10'-0"
137F JAN. GWT/PNT GWT/PNT PNT PNT RB CONC GWB 9'-0"
138 READINESS BAY E TA-50 STORAGE PNT PNT PNT PNT PT CONC EXPOSED VARIES
138A SECURE NON-SENS STORAGE PNT PNT PNT PNT RB CONC EXPOSED VARIES 8
138B UNIT STOR. PNT WIRE MESH WIRE MESH PNT RB CONC WIRE MESH 9'-0"
138C COM. STOR. PNT WIRE MESH WIRE MESH WIRE MESH RB CONC WIRE MESH 9'-0"
138D NBC STOR. WIRE MESH WIRE MESH WIRE MESH WIRE MESH - CONC WIRE MESH 9'-0"
138E VAULT CONC. CONC. CONC. CONC. RB CONC CONC. 10'-0"
138F JAN. GWT/PNT GWT/PNT PNT PNT RB CONC GWB 9'-0"
139 READINESS BAY F TA-50 STORAGE PNT PNT PNT PNT RB CONC EXPOSED VARIES
139A SECURE NON-SENS STORAGE PNT PNT PNT PNT RB CONC EXPOSED VARIES 8
139B UNIT STOR. PNT WIRE MESH WIRE MESH PNT RB CONC WIRE MESH 9'-0"
139C COM. STOR. PNT WIRE MESH WIRE MESH WIRE MESH RB CONC WIRE MESH 9'-0"
139D NBC STOR. WIRE MESH WIRE MESH WIRE MESH WIRE MESH - CONC WIRE MESH 9'-0"
139E VAULT CONC. CONC. CONC. CONC. RB CONC CONC. 10'-0"
139F JAN. GWT/PNT GWT/PNT PNT PNT RB CONC GWB 9'-0"
140 READINESS BAY G TA-50 STORAGE PNT PNT PNT PNT RB CONC EXPOSED VARIES
140A JAN. GWT/PNT PNT PNT GWT/PNT RB CONC GWB 9'-0" 5
140B VAULT CONC. CONC. CONC. CONC. RB CONC CONC. 10'-0"
140C COM. STOR. PNT WIRE MESH WIRE MESH WIRE MESH RB CONC WIRE MESH 9'-0"
140D NBC STOR. WIRE MESH WIRE MESH WIRE MESH WIRE MESH - CONC WIRE MESH 9'-0"
140E UNIT STOR. PNT PNT WIRE MESH WIRE MESH RB CONC WIRE MESH 9'-0"
140F SECURE NON-SENS STORAGE PNT PNT PNT PNT RB CONC EXPOSED VARIES 8
141 COOR. PNT PNT PNT PNT RB GPCONC ATC 9'-0"
142 XO PNT PNT PNT PNT RB CPT ATC 9'-0" 2
143 CO.CDR. PNT PNT PNT PNT RB CPT ATC 9'-0" 2
144 STOR/PRINT PNT PNT PNT PNT RB GPCONC ATC 9'-0" 2
145 1 SG PNT PNT PNT PNT RB CPT ATC 9'-0" 2
146 TRAINING ROOM PNT PNT PNT PNT RB LVT ATC 9'-0"
147 CORR. PNT PNT PNT PNT RB GPCONC ATC 9'-0"
148 XO PNT PNT PNT PNT RB CPT ATC 9'-0"
149 CO.CDR. PNT PNT PNT PNT RB CPT ATC 9'-0" 2
150 STOR/PRINT PNT PNT PNT PNT RB GPCONC ATC 9'-0" 2
151 1 SG PNT PNT PNT PNT RB CPT ATC 9'-0" 2
152 TRAINING ROOM PNT PNT PNT PNT RB LVT ATC 9'-0"
153 COOR. PNT PNT PNT PNT RB GPCONC ATC 9'-0"
154 XO PNT PNT PNT PNT RB CPT ATC 9'-0"
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
G
EN
ER
AL
R
EV
IS
IO
N
S
/2 6/
2 0
G
EN
ER
AL
R
EV
IS
IO
N
S
/1 6/
2 0
G
EN
ER
AL
R
EV
IS
IO
N
S
/1 7/
2 0
F
AS
S
C H
ED
U
LE
D
SCHED
AS
A
AS
S
C H
ED
U
LE
D
SCHED
AS
NOTES:
1. MEDIUM STILE UNO
2. GT-1 @ NON-RATED INTERIOR DOORS
3. GT-2 @ EXTERIOR DOORS
4. GT-3 @ FIRE-RATED INTERIOR DOORS
3' -7
" M
AX
2' -6
B
AS
S
C H
ED
U
LE
D
SCHED
AS
AS
S
C H
ED
U
LE
D
D O
O R
T
YP
E
AN
D S
IZ
E
0' -2
0'-2"
SCHED
AS 0'-2"
E
AS
S
C H
ED
U
LE
D
SCHEDULED
AS
AS
S
C H
ED
U
LE
D
D O
O R
T
YP
E
AN
D S
IZ
E
0' -2
0'-2"
SCHED
AS 0'-2"
AS
S
C H
ED
U
LE
D
D O
O R
T
YP
E
AN
D S
IZ
E
SCHED
AS
GENERAL NOTES
1. SEE ELECTRICAL DRAWINGS AND ASSOCIATED DETAIL DRAWINGS
FOR ELECTRICAL ACCESS CONTROL REQUIREMENTS. COORDINATE
ELECTRICAL EQUIPMENT INSTALLATION WITH EACH DOOR.
2. ALL EXTERIOR AND INTERIOR DOORS WITH ELECTRONIC
HARDWARE SHALL BE PROVIDED WITH 4 JAMB ANCHORS PER JAMB
MINIMUM. ALL OTHER DOORS SHALL BE PROVIDED WITH 3 JAMB
ANCHORS PER JAMB MINIMUM.
3. ALL EXTERIOR DOORS AND SIDELIGHTS SHALL BE PROVIDED WITH
LAMINATED UNITS IN AN INSULATED ASSEMBLY,
SEE SPECIFICATIONS.
4. ALL EXTERIOR WINDOWS SHALL BE COMPRISED OF TINT, LOW-E,
LAMINATED UNITS IN AN INSULATED ASSEMBLY,
SEE SPECIFICATIONS.
5. ALL EXTERIOR DOOR AND FRAME FASTENERS SHALL BE
TAMPER-PROOF SECURITY FASTENERS. EXTERIOR DOORS SHALL
BE PROVIDED WITH NO-REMOVABLE PINS IN THE HINGES.
6. ALL EXTERIOR DOORS & FRAMES ARE TO BE INSULATED.
7. COORDINATE DOOR SIZE WITH STRUCTURAL PRECASTER PRIOR
TO ORDERING MATERIALS.
8. SEE DETAIL 2/A-701 FOR ACCORDION FOLDING PARTITIONS DETAILS.
9. PROVIDE HASP TO ACCOMMODATE HIGH SECURITY PADLOCK AT ALL
NON-SENSITIVE SECURE STORAGE DOORS.
COMMENTS
1. WALL OPENING SIZES AND DOOR IS "APPROXIMATE," THE FINAL SIZE
TO BE AS DETERMINED BY THE VAULT DOOR MANUFACTURER.
2. DOOR THICKNESS IS "APPROXIMATE," THE FINAL THICKNESS TO BE
DETERMINED BY THE DOOR MANUFACTURER.
GLAZING TYPES
GT-1 1/4" CLEAR SAFETY GLASS (AT INTERIOR DOORS) OR
GT-2 1" INSULATED TINTED (BRONZE) LAMINATE SAFETY GLASS.
GT-3 1" INSULATED 45 MINUTE FIRE RATED CLEAR SAFETY GLASS
LEGEND
AL ALUMINUM
IGU INSULATED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .