Communications Upgrade and Installation

Closed Pre-Solicitation Posted

Solicitation number
PANMCC-25-P-0000013832
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Fort Cavazos, Texas 76544, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood is seeking a small business contractor to perform a communications infrastructure upgrade at the Stand-Alone Network Enterprise Center (SANEC) located at Fort Cavazos, Texas. The primary objective is to establish internal IT connectivity across designated areas, specifically in Building 56480 for the Installation Management Command (IMCOM). The project involves removing existing telecommunication infrastructure and installing new networking equipment across the first and second floors, following ANSI, TIA, EIA, and UFC technical standards. Interested firms must submit a 5-page capabilities statement by March 20, 2025, at 3:00 PM CST, demonstrating their technical expertise, previous experience with similar projects, and capacity to execute the infrastructure upgrade. Evaluation will focus on the contractor's small business status, technical capabilities, and ability to meet detailed performance requirements outlined in the draft Performance Work Statement.

The contract is designated as a total small business set-aside, with potential opportunities for various socioeconomic categories including 8(a), Small Disadvantaged Business, HUBZone, Service-Disabled Veteran-Owned, and Women-Owned Small Business firms. The NAICS code is 238210 with a size standard of $19 million, targeting electrical contractors and wiring installation specialists. The performance period is anticipated to be 120 days, with an additional 30-day service warranty, and the contract will be structured as a firm-fixed-price arrangement. While specific award value is not disclosed, the project requires comprehensive installation of network equipment cabinets, patch panels, fiber and copper cabling, wall outlets, and associated hardware. Contractors must be prepared to provide all necessary personnel, equipment, and materials to complete the infrastructure upgrade, with a focus on establishing robust network connectivity for the Fort Cavazos facility.

Notice text

The Stand-Alone Network Enterprise Center (SANEC), located at Fort Cavazos, TX requires a communication infrastructure installation and upgrade to establish internal IT connectivity across areas of responsibilities. A continuing need is anticipated for the Installation Management Command IMCOM Building. Attached is the draft Performance Work Statement (PWS).

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX Bldg. 56767 Equipment Concentration Site (ECS) #6428th St. and Park Ave.North Fort Hood, TX Gatesville, Texas 76528, United States · NAICS 236220 ENDIST Louisville Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity