PANMCC-25-P-0000 013832_Performance Work Statement_DRAFT.pdf
PDF 249 KB Posted
- Attached to
- Communications Upgrade and Installation
- Solicitation number
- PANMCC-25-P-0000013832
About this file
This Performance Work Statement (PWS) details a communications infrastructure upgrade for Building 56480 at Fort Cavazos, Texas, for the Installation Management Command (IMCOM). The project requires a non-personnel services contract to remove existing telecommunication infrastructure and install new networking equipment across the first and second floors, including:
Key technical requirements include installing new network equipment cabinets, patch panels, fiber and copper cabling, wall outlets, and associated hardware. The contractor must follow specific standards including ANSI, TIA, EIA, and UFC guidelines, with a 120-day performance period and a 30-day service warranty. The project scope involves establishing internal IT communication cabling for connectivity to the Fort Cavazos network, with detailed specifications for cable routing, termination, labeling, and testing. The contract will be a firm-fixed-price arrangement, with the contractor responsible for providing all necessary personnel, equipment, and materials to complete the infrastructure upgrade.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Soures Sought Notice_PANMCC-25-P-0000 013832_FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Bldg. 56480 (1st and 2nd Floor) Fort Cavazos, TX Communications Infrastructure Upgrade
PART 1
GENERAL INFORMATION
1. GENERAL: This is a non-personnel services contract to provide communications infrastructure to Installation Management Command (IMCOM) building 56480 Fort Cavazos, Texas. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items necessary to perform installation of communications infrastructure to IMCOM as defined in this Performance Work Statement; except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2. Background: The Fort Cavazos Stand Alone Network Enterprise Center, (SANEC) is responsible for providing the community it supports with communications infrastructure. The SANECs mission is to provide transparent delivery and sustainment of communication capabilities across the Fort Cavazos AOR enabling unity of command and synchronization of the Enterprise in support of full spectrum operations.
1.3. Objectives: To provide installation of communications infrastructure to IMCOM as defined in this Performance Work Statement.
1.4. Scope: Communication infrastructure installation/upgrade to Bldg 56480 on the 1st and 2nd floors. Establishing internal IT communication cabling for connectivity to the Fort Cavazos network.
1.5. Period of Performance: The period of performance barring any contingencies that arise due to construction delays, all work shall be completed within 120 days from date of award.
1.6. General Information
1.6.1. Quality Control: The contractor shall maintain and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control is the means by which he assures himself that his work complies with the requirement of the contract.
1.6.2. Quality Assurance: The government shall monitor the contractor’s performance under this contract. Contractor must contact the SANEC POC to schedule Quality Assurance (QA) inspections throughout the project. Contractor must be present during the QA inspections. It is incumbent that the Contractor verifies that the installation performed, and material used to be inspected before it is enclosed and/or hidden from view. Contractor will bear cost associated with uncovering and exposing installations and other task that have not been inspected. Contractor shall notify the SANEC POC 48 hours prior to the completion of the communication requirements in order to schedule a final QA inspection. The project shall not be considered complete until a thorough QA inspection is conducted by the SANEC, and the work accepted.
1.6.3. Recognized Holidays:
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day
1.6.4. Hours of Operation: The contractor is responsible for conducting business, between the hours of 7:30 a.m. to 4:30 p.m., Monday through Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance to complete the work defined within this
PWS.
1.6.5. Installation Access: Visit the Marvin Leath Visitors Center located at T.J. Mills Blvd, Fort Cavazos, TX 76544, and will need to show a CURRENT Driver’s License, Auto Registration, and Auto Insurance. Also, allow extra time for possible vehicle inspections. Do not speed on this installation. Use of (non-hands free) cell phones while driving on Fort Cavazos is illegal and you could be fined. For more information, visit the website at https://home.army.mil/cavazos/my-fort/visitor-information
1.6.6. Installation Closures: During the installation, if an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall:
a. Reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a legal public holiday, and when routine work is not scheduled for that day; or
b. Reschedule the work on any day mutually satisfactory.
1.6.7. Place of Performance: The work to be performed under this contract will be performed at the government facility, Installation Management Command (IMCOM) Bldg 56480, 1st and 2nd floors on Fort Cavazos, TX 76544.
https://home.army.mil/cavazos/my-fort/visitor-information
1.6.8. Type of Contract: The government will award a Firm-Fixed-Price contract.
1.6.9. Security Requirements: Contractor personnel and any representative of the Contractor entering Fort Cavazos, Texas, or Government owned property, shall abide by all security regulations, and shall be subject to security checks. Contractor personnel and property shall be subject to search and seizure upon entering or leaving the confines of Fort Cavazos, Texas.
1.6.9.1. Access and General Protection/Security Policy and Procedures: All Contractor and all associated sub-contractor’s employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative).
1.6.9.2. A visit Authorization Request (VAR) NISPOM 6-105 must be submitted to the security personnel prior to the start of work. The SANEC Security POC is Mr. George Wokaly and can be reached at George.j.wokaly.civ@army.mil 254-553-6500 or 254-287-2443.
Contractor needs to place SANEC POC for the project on VAR.
1.6.9.3. PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each workday, the contractor shall ensure ALL equipment and materials are secured.
1.6.10. Identification of Contractor Employees: Contractor employees shall avoid creating an impression in the minds of members of the public that they are Government officials. All contract personnel will be required to obtain and wear Contractor provided badges or shirts identifying the company logo in the performance of this contract.
1.6.10.1. Personnel List. The Contractor shall provide in writing a list of Contractor employees showing a valid state operator’s license for each category of vehicle or equipment being operated who will be performing the work under this contract to the Contracting Officer (KO) and Contracting Officer Representative (COR) no later than five (5) calendar days after contract award. Only Contractor employees identified on the Contractors employee roster will be allowed access to facility when properly identified by the wearing of Contractor identification badges and complying with the installation security procedures.
1.6.11. Emergency Services. The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel.
1.6.11.1. Medical services for Contractor personnel are the responsibility of the Contractor.
However, the Government may provide, on an emergency basis, medical services for job related injuries while an employee is performing under this contract. Emergency medical care is available to Contractor employees at Carl R. Darnall Army Medical Center (Building 36065 Fort Cavazos Texas). Such emergency medical care will be limited to those services necessary to prevent undue suffering or loss of life and will be provided only during the period of emergency. In such circumstances, action shall be taken to transfer Contractor employee to a civilian health care provider as soon as the emergency period ends. The Fort Cavazos emergency call number is 254-288-8114.
1.6.11.2. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO and COR/ACOR immediately, not later than (NLT) two (2) hours after the incident.
1.6.12. Safety Measures and Protective Equipment. The Contractor shall provide all personal protective equipment in accordance with Federal Law and the COVID 19 safety requirements.
mailto:George.j.wokaly.civ@army.mil
Workers shall be trained in appropriate safety measures and shall not place materials, machines, or other equipment in traffic lanes or other locations that could create safety hazards. The Contractor shall maintain a safe job site, clean and free of all foreign debris during and upon completion of work. The Contractor shall remove unserviceable parts and components from Government property, unless otherwise directed by the Contracting Officer. The Contractor shall be responsible for the enforcement of all safety requirements for any work performed under the contract. If the Contractor fails or refuses to comply with safety or environmental requirements, the Contracting Officer may issue an order stopping all or part of the work in accordance with the Stop work Clause of this contract.
1.6.13. Contractor Vehicle and Equipment Identification. All Contractor vehicles or equipment entering the Fort Cavazos Installation shall have a valid license plate, a minimum of current liability vehicle insurance, and current vehicle registration, as per Texas state requirements.
Contractor provided vehicles and equipment used in the performance of work under this contract on the Fort Cavazos Installation shall be marked with the Contractors company name or a company logo on both sides of the vehicle.
1.6.13.1. Motor Vehicle Operators: Contractor’s personnel, whose tasks involve operation of any vehicles, shall possess a valid driver’s license, certificates, and permits applicable for the type and class of vehicle being operated.
1.6.13.2. Operator’s License and Vehicle Registration. Contractor personnel operating motor vehicles on the installation shall have a valid state operator’s license for each category of vehicle or equipment being operated and shall comply with Fort Hood Regulation (FHR) 190-5, Fort Hood Traffic Code, dated 30 April 2013 or later, regarding motor vehicle use on the installation.
1.6.14. Contracting Officer Representative (COR): The (COR) for this contract will be Jose Armenta, Stand Alone Network Enterprise Center (SANEC), Fort Cavazos, TX 76544, Telephone: 254-287-9648, Email: jose.m.armenta.civ@army.mil. The COR will monitor the work specified in the contract and assists in contract administration. The COR is authorized to perform the following functions:
• Assure that the Contractor performs the technical requirements of the contract;
• Perform inspections necessary in connection with contract performance;
• Maintain written and oral communications with the Contractor concerning technical aspects of the contract;
• Issue written interpretations of technical requirements, including Government drawings, designs, specifications;
• Monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property
• Provide site entry to the Contractor personnel.
mailto:jose.m.armenta.civ@army.mil.
The COR, especially with regard to changes in cost or price, estimates or changes in delivery dates is not authorized to change any of the terms and conditions of the resulting order.
1.6.15. Organizational Conflict of Interest: The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI between Government (military or civilian) and Contractor personnel.
1.6.16. This statement of requirement (SOR), also referred to as statement of work (SOW), along with the Unified Facilities Criteria (UFC 3-580-01) Telecommunications Interior Infrastructure Planning and Design, the Dept. of the Army Technical Criteria for the Installation Information Infrastructure Architecture (I3A) and the Ft. Cavazos SANEC Telecommunications Installation Design Guide (T-IDG), shall be the basis for the Contractor to bring the communications infrastructure in line with the end state requirements. The Contractor shall be responsible to make sure all industry standards are followed. Any inquiries shall be directed to the SANEC POC or the Requesting Authority POC.
1.6.17. Contractor shall follow all American National Standards Institute (ANSI), Telecommunications Industry Association (TIA), Electronic Industries Alliance (EIA), Rural Utilities Service (RUS) and National Fire Protection Services (NFPA) standards covering all installation aspects of communications infrastructure.
1.6.18. Contractor shall, in addition to the industry standards, meet all requirements and perform all work in accordance with the guidance published in UFC 3-580-01, I3A and T-IDG.
1.6.19. Contractor shall perform all required test, repairs, fixes, and adjustments necessary to ensure the installation meets all applicable ANSI, TIA, EIA, RUS, NFPA, UFC 3-580-01, I3A and T-IDG requirements and standards. Any unsatisfactory/failed test results, workmanship discrepancies and workmanship deficiencies shall be corrected and repaired by the contractor prior to acceptance of work completion.
1.6.20. Contractor shall coordinate with the Directorate of Public Works (DPW) to schedule all excavation and obtain the required digging permits. Permission (approved digging permits) shall be obtained from DPW prior to the start of any excavation and/or construction. The DPW dig permit process arranges for marking of buried utilities (gas, water, electric, and cable TV), environmental issues and restricted sites, and location of existing SANEC communications cables. FH FORM 200-10 Coordination for Land Excavation and Water Use, November 2015 can be found at http://www.hood.army.mil/dhr/forms/fhform200-10st.pdf (Not applicable to this specific project)
1.6.21. Contractor shall notify the SANEC POC 48 hours prior to start of the communication requirements. Contractor shall contact SANEC POC with any communication questions and concerns.
1.6.22. Contractor shall provide adequate protection to prevent damage to existing Ft. Cavazos communication infrastructure. During duty hours, any damage shall be reported immediately to the SANEC POC and SANEC Operations Center at (254) 287-4203. After duty hours, if the SANEC POC or SANEC OPS Center cannot be reached, the Contractor shall notify Ft. Cavazos IOC at (254) 287- 2520. Contractor shall repair all damages to the satisfaction of the SANEC and restore all excavated areas.
http://www.hood.army.mil/dhr/forms/fhform200-10st.pdf
1.6.23. Contractor shall clean-up and restore to the same condition as found prior to construction for all areas disturbed at the work site(s) where no additional intrusion is required.
1.6.24. Contractor shall ensure for the cabling pathways and spaces that distribute and support the cable and connecting hardware within the building and work areas, that building distribution frame equipment and structures to support cabling are installed in accordance with UFC 3-580- 01, I3A and T-IDG (Chap. 2, Sect. 2.5.12; Chap. 3, Sect 3.6; Chap. 4, Sect. 4.3; and Chap. 5, Sect. 5.5).
The pathways and spaces are not inclusive to the telecommunication rooms (TRs), main distribution frame (MDF), and intermediate distribution frame (IDF).
1.6.25. Contractor shall ensure that all electrical and grounding requirements are satisfied in accordance with UFC 3-580-01, I3A and T-IDG. Contractor shall install required grounding hardware and material to ensure all equipment, and all applicable cables are properly grounded in accordance with UFC 3-580-01, I3A and T-IDG.
1.6.26. Contractor shall ensure that all cabling (outside plant - OSP and inside plant (ISP) and modular (data drops) terminations are tested by the end of the project and shall provide to the NEC POC documentation, both hard copy and electronic, indicating the results of the test for all copper pair counts, fiber strands and modular (data drops) terminations. Contractor shall have testing performed and completed in accordance with TIA/EIA, UFC 3-580-01, I3A and T-IDG requirements.
1.6.27. Contractor shall ensure cable ID/cable tags shall be installed at all cable termination points (terminals) and splices, including house cables, in accordance with T-IDG specifications.
Contractor shall ensure that all terminals, LIU, and communications equipment are labeled in accordance with T-IDG specifications. Contractor shall ensure that all telecommunications room (TR) and user location termination points (outlets and patch panels) are labeled in accordance with T-IDG (Chap. 2, Sect. 2.5.9 and Sect. 2.5.10).
1.6.28. Contractor shall ensure that Velcro strips are used to secure all wires and cables beyond the cable entry point within the building. Cable ties shall not be utilized.
1.6.29. Contractor shall ensure, if applicable, fire protection requirements of TR and ducts are meet in accordance with applicable code and requirements.
1.6.30. Contractor shall provide as-builts and red-line drawings to the SANEC POC and requesting authority POC upon completion of the project.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.
Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.6. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.7. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.8. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.9. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.10. WORK WEEK. Monday through Friday, unless specified otherwise.
3. ACRONYMS:
AFARS Army Federal Acquisition Regulation Supplement
AR Army Regulation
COR Contracting Officer Representative
DA Department of the Army DOD Department of Defense
FAR Federal Acquisition Regulation
KO Contracting Officer
OCI Organizational Conflict of Interest POC Point of Contact
PWS Performance Work Statement QC Quality Control
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: The Government will provide a Contracting Officer Representative (COR) to monitor work specified in the contract and assists in contract administration as outlined at paragraph 1.6.14.
3.2. Facilities: The Government will provide the necessary workspace at Bldg. 91002 Fort Cavazos, West Fort Cavazos, TX 76544 as required for the communications infrastructure upgrade as specified in the PWS.
3.3. Utilities: The Government will provide all utilities in the facility for the contractor’s use in performance of tasks outlined in this PWS. The Contractor shall instruct employees in utilities conservation practices.
3.4. Equipment: The Government will NOT provide any equipment under this contract
3.5. Materials: The Government will NOT provide any materials under this contract.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform the work under this contract that are not listed under Section 3 of this PWS.
4.2. Materials: The Contractor shall provide and furnish materials, supplies, and equipment necessary to meet the requirements under this PWS.
4.3. Equipment: The Contractor shall provide and furnish supplies, and equipment necessary to meet the requirements under this PWS.
4.4. Licenses and Permits: The Contractor shall obtain all required permits to perform the work specified in paragraph 1.6.20 and as required by this PWS.
4.5. Warranty: The Contractor shall provide a 30-day service warranty for parts and labor.
5. Specific Tasks:
PART 5
SPECIFIC TASKS
5.1. Basic Services. The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items necessary to perform installation of communications infrastructure to Bldg. 56480 1st and 2nd floors as defined in this Performance Work Statement; except for those items specified as government furnished property and services.
The contractor shall perform to the standards in this contract.
5.2. Task Heading. Remove all existing internal FOC, copper cables, outlets, etc. from the facility and install new Cat6 cables, outlets, patch panels and fiber optic patch cords.
5.3. Permits: The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor’s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work.
All permits obtained by the Contractor shall be maintained current throughout the entire period of performance of the contract.
5.4. Damage to Government Property. The Contractor shall be held liable for damage or destruction of Government property (e.g. buildings, vehicles, sidewalks, etc.) caused by the Contractor in the performance of services in this contract. The Contractor shall take corrective action as required by the Contracting Officer in accordance with FAR Clause 52.237-2, Protection of Government Buildings, Equipment, and Vegetation. If the Contractor fails to take the required corrective action, the Contracting Officer may exercise other rights or remedies allowed by this contract.
5.4.1. Damage to Government property caused by Contractor. The Contractor shall notify the Contracting officer of and the Contracting Officer Representative (COR) of damages caused by Contractor employees. The Contractor shall at no cost to the Government shall repair and return the damaged area to its previous condition.
5.5. The Contractor personnel shall practice utilities conservation and shall operate under conditions that preclude waste of Government furnished utilities, which include turning off the water faucets or valves and unplugging ALL electrical equipment at the end of each workday.
5.6. Acceptance of Work: As stated in paragraph 1.6.19 of this PWS, the Government and the Contractor shall perform all required test, repairs, fixes, and adjustments necessary to ensure the installation meets all applicable ANSI, TIA, EIA, RUS, NFPA, UFC 3-580-01, I3A and T-IDG requirements and standards. Any unsatisfactory/failed test results, workmanship discrepancies and workmanship deficiencies shall be corrected and repaired by the contractor prior to acceptance of work completion.
5.7. Warranty Response Time: In the event the communications system becomes inoperable any time within 90-days of installation the Contractor shall respond within 48-hours to conduct testing and repairs. Thereafter, the Contractor shall respond within 48-hours and testing and repair completed with 5-workdays.
6. Specific Requirements:
6.1 Bldg. 56480 First Floor:
6.1.1 Remove the old telecommunication rack in the mechanical room.
6.1.2 Install fire rated AC grade plywood.
6.1.3 Install new lockable network equipment cabinet onto new installed plywood.
6.1.4 Install one new 48-port category 6 patch panel into the network equipment cabinet.
6.1.5 Install one new 24-port Telecom patch panel into the network equipment cabinet.
6.1.6 Terminate category 3 cable from the outgoing end of the building terminal and extend the category 3 cable onto the new 24 port Telcom patch panel inside the lockable cabinet.
6.1.7 Terminate the 25 pair onto a C block inside the new lockable network cabinet.
6.1.8 Install an addition 24 port Telcom patch panel in the lockable cabinet and C block.
6.1.9 Install category 3 riser cable from the second Telcom patch panel and extend it to the lockable cabinet on the second floor.
6.1.10 Use J-hooks to route cabling from mechanical room to wall penetration on first floor.
6.1.11 Install 24 wall boxes with conduit and 48 plenum rated category 6 cables in building
56480 first floor.
6.1.12 Install 24 surface mounted metal boxes to CMU walls, with 1” EMT stubs on 1st floor.
6.1.13 Install 48 plenum rated blue category 6 cables, with two cables each for the surface mounted box.
6.1.14 Install conduits in the available space above the windows to route cabling throughout the first floor.
6.1.15 Route blue category 6 cables from end user data drop to existing wall mounted network equipment cabinet.
6.1.16 Terminate end-user data ports with 8P8C modular RJ-45 jacks using T568B standards.
6.1.17 Install a dual power outlet in lockable network equipment cabinet if applicable or next to the lockable network equipment cabinet in mechanical room.
6.1.18 Label, test, and record test results.
6.1.19 (If applicable) Seal all entry and exit conduits and ducts.
6.2 Bldg. 56480 Second Floor:
6.2.1 Install two fiber patch cords ST to LC single mode from the mechanical room LIU to the lockable cabinet on second floor the ST end will be in the mechanical room and the LC will be for the second floor.
6.2.2 Remove the old telecommunication cabinet.
6.2.3 Install fire rated AC grade plywood.
6.2.4 Install new lockable network equipment cabinet onto new installed plywood.
6.2.5 Install one new 48-port category 6 patch panel into the network equipment cabinet.
6.2.6 Install the category 3 riser cable from the first floor to the new 24 port Telcom patch panel and C block.
6.2.7 Terminate the 25th pair onto a C block inside the new lockable network cabinet.
6.2.8 Install J-Hooks in the attic space to support the network cabling.
6.2.9 Install 24 wall boxes with conduit and 48 plenum rated blue category 6 cables in building 56480 second floor.
6.2.10 Install 24 surface mounted metal boxes to CMU walls, with 1” EMT stubs going into the attic space to support the 2nd floor.
6.2.11 Install 48 plenum blue category 6 cables, two cables per surface mounted box.
6.2.12 Route blue category 6 cables from end user data drop to new install lockable wall mounted network equipment cabinet.
6.2.13 Terminate end-user data ports with 8P8C modular RJ-45 jacks using T568B standards.
6.2.14 Install a dual power outlet in lockable network equipment cabinet if applicable or next to the lockable network equipment cabinet in mechanical room.
6.2.15 Label, test, and record test results.
6.2.16 (If applicable) Seal all entry and exiting conduits and ducts
7 Service Contract Reporting:
7.1 The requirement for contract manpower reporting shall be in accordance with FAR clause 52.204-14, Service Contract Reporting Requirements.
7.2 The Contractor shall report ALL Contractor labor hours (including Subcontractor labor hours) required for performance of services provided under this task order via a secure data collection site. The Contractor is required to fill in all required data fields completely using the following web address: http://www.sam.gov.
7.3 Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. For assistance, see the Help page on sam.gov.
NOTE: Contractor shall provide the following equipment to the SANEC POC:
REQUIRED MATERIALS QTY UNIT
Equipment Cabinet 19" 2 EA Outlet: Single RJ45 48 EA Patch cord: RJ45 CAT 6, 3ft 96 EA Patch cord: RJ45 CAT 6, 7ft 96 EA Patch PNL, RJ45 Cat 6, 48port 2 EA Patch PNL, RJ45 Cat 6, 24port 3 EA House Signal Cable, 25 Pair 30 LF Riser: 25 PR Inside Plant Cable 195 LF Backboard 3/4 4"x4" 2 EA Surface Mount Gang Box Dual Port 48 EA Face Plate Single Gang 2 Ports 48 EA Surface Mount RJ-45 Box 1 Port 2 EA 4" J-Hook 50 EA Category 6 Cable Blue (1000) Plenum 12 EA RJ-45 Connectors Plug Pkg 100 2 EA SM Duplex 9/125 fiber jumper LC-ST 50M 2 EA
End of Statement http://www.sam.gov/
| PERFORMANCE WORK STATEMENT (PWS) |
| PART 1 |
| PART 2 |
| 2. DEFINITIONS: |
| PART 3 |
| 3. GOVERNMENT FURNISHED ITEMS AND SERVICES: |
| PART 4 |
| 4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES: |
| 5. Specific Tasks: |
File details come from the government source that posted it. Updated .