Combined Operations, Services, Maintenance, and Infrastructure Contract (COSMIC) at John C. Stennis Space Center and Michoud Assemble Facility
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- 80SSC024R0004
- Agency
-
Stennis Space Center
National Aeronautics and Space Administration
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 561210 Facilities Support Services
- PSC
- M1JZ Operation Of Miscellaneous Buildings
- Place of performance
- Stennis Space Center, Mississippi 39529, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The National Aeronautics and Space Administration Stennis Space Center seeks to award an indefinite-delivery, indefinite-quantity contract to provide facility operations, services, and maintenance at Stennis Space Center in Mississippi and Marshall Space Flight Center's Michoud Assembly Facility in Louisiana. Services will include contract management, logistics, safety, engineering support, site services, facility operations and maintenance, environmental services, and program management. A hybrid cost-plus incentive fee, firm-fixed price contract with option periods is anticipated. Interested parties may attend industry days on March 6, 2024 at Stennis Space Center or March 7, 2024 at Michoud Assembly Facility, and must submit any questions regarding the draft request for proposal by March 22, 2024.
The pre-solicitation notice does not designate any set-asides. The anticipated NAICS codes are 541330 for engineering services and 561210 for facilities support services. The incumbent contractor is Synergy-Achieving Consolidated Operations and Maintenance Contact. The contract is a follow-on for similar services currently provided at the two NASA facilities.
Notice text
3 versions
Update #3 · Latest ·
The purpose of Amendment 2 to the DRAFT REQUEST FOR PROPOSAL, is to post the attendees list for the PrePropoal/PreBid Conference at SSC and MAF.
The purpose of Amendment 1 to the DRAFT REQUEST FOR PROPOSAL, is to issue a Revised CO Letter to Offerors.
THIS IS NOT A REQUEST FOR PROPOSAL. NO PROPOSALS ARE TO BE SUBMITTED IN RESPONSE TO THIS NOTICE.
This notice is issued by the NASA/John C. Stennis Space Center (SSC) to post a DRAFT REQUEST FOR PROPOSAL (DRFP) to solicit responses from interested parties. This document is for information and planning purposes and to allow industry the opportunity to verify reasonableness and feasibility of the requirement, as well as promote competition.
RFI #80SSC023K0003, Facilities Infrastructure Contract (FIC) was released on July 18, 2023. Since then, the title of the acquisition has changed to Combined Operations, Services, Maintenance, and Infrastructure Contract (COSMIC).
COSMIC is the follow-on to the Synergy-Achieving Consolidated Operations and Maintenance Contact (SACOM). The principal purpose of the COSMIC requirements are to provide facility operations, service and maintenance at SSC and Marshall Space Flight Center’s Michoud Assembly Facility (MAF) for NASA and its tenants.
COSMIC is a mechanism for facility services at SSC in Mississippi and MAF in Louisiana. MAF is managed by and reports to MSFC; under COSMIC, one Contractor will provide services to both locations, SSC and MAF. The Contractor shall manage and shall provide all services, equipment, and supplies, except as provided as Government Property, to implement the COSMIC Performance Work Statement (PWS).
The COSMIC PWS consists of Core service operations and Indefinite Delivery, Indefinite Quantity (IDIQ) requirements spread among the following work elements: Contract Management, Logistics, Safety, Health and Environmental Compliance, Engineering and Manufacturing Support Services, Site Services, Facility Operations & Maintenance Services, and Environmental Services and Program Management.
COSMIC is anticipated to be a Hybrid Cost-Plus Incentive Fee, Firm Fixed Price, IDIQ contract with Options Periods.
This presolicitation synopsis is not to be construed as a commitment by the Government, nor will the Government pay for the information submitted in response. The Government may not respond to questions/concerns submitted. The Government will use the information to finalize the RFP as necessary.
Industry Days will be held at SSC on March 6, 2024 and at MAF on March 7, 2024. Details for attendance are within the CO Cover Letter and/or Section L of the DRFP.
All comments or questions shall be submitted electronically via email to Sarah Maine at sarah.m.maine@nasa.gov, no later than March 22, 2024 @ 4:00 PM CDT. When responding reference “DRFP 80SSC024R0004” in the subject of the email. Please refer to the excel document attached titled “Draft Response Template Format” for the formatting of questions/comments.
NASA Clause 1852.215-84, Ombudsman, is applicable. The Center Ombudsman for this acquisition can be found at : https://www.hq.nasa.gov/office/procurement/regs/Procurement-Ombuds-Comp-Advocate-Listing.pdf
If a solicitation is released, then it and any additional documents will be available on www.Sam.gov. It is the offeror's responsibility to monitor this website for the release of the solicitation and amendments (if any). Potential offerors will be responsible for downloading their own copy of the solicitation and amendments, if any.
NASA intends to publicize a listing of respondents in order to facilitate teaming arrangements. Should your firm desire not to be included in this listing, clearly indicate this desire in your response.
Update #2 ·
The purpose of Amendment 1 to the DRAFT REQUEST FOR PROPOSAL, is to issue a Revised CO Letter to Offerors.
THIS IS NOT A REQUEST FOR PROPOSAL. NO PROPOSALS ARE TO BE SUBMITTED IN RESPONSE TO THIS NOTICE.
This notice is issued by the NASA/John C. Stennis Space Center (SSC) to post a DRAFT REQUEST FOR PROPOSAL (DRFP) to solicit responses from interested parties. This document is for information and planning purposes and to allow industry the opportunity to verify reasonableness and feasibility of the requirement, as well as promote competition.
RFI #80SSC023K0003, Facilities Infrastructure Contract (FIC) was released on July 18, 2023. Since then, the title of the acquisition has changed to Combined Operations, Services, Maintenance, and Infrastructure Contract (COSMIC).
COSMIC is the follow-on to the Synergy-Achieving Consolidated Operations and Maintenance Contact (SACOM). The principal purpose of the COSMIC requirements are to provide facility operations, service and maintenance at SSC and Marshall Space Flight Center’s Michoud Assembly Facility (MAF) for NASA and its tenants.
COSMIC is a mechanism for facility services at SSC in Mississippi and MAF in Louisiana. MAF is managed by and reports to MSFC; under COSMIC, one Contractor will provide services to both locations, SSC and MAF. The Contractor shall manage and shall provide all services, equipment, and supplies, except as provided as Government Property, to implement the COSMIC Performance Work Statement (PWS).
The COSMIC PWS consists of Core service operations and Indefinite Delivery, Indefinite Quantity (IDIQ) requirements spread among the following work elements: Contract Management, Logistics, Safety, Health and Environmental Compliance, Engineering and Manufacturing Support Services, Site Services, Facility Operations & Maintenance Services, and Environmental Services and Program Management.
COSMIC is anticipated to be a Hybrid Cost-Plus Incentive Fee, Firm Fixed Price, IDIQ contract with Options Periods.
This presolicitation synopsis is not to be construed as a commitment by the Government, nor will the Government pay for the information submitted in response. The Government may not respond to questions/concerns submitted. The Government will use the information to finalize the RFP as necessary.
Industry Days will be held at SSC on March 6, 2024 and at MAF on March 7, 2024. Details for attendance are within the CO Cover Letter and/or Section L of the DRFP.
All comments or questions shall be submitted electronically via email to Sarah Maine at sarah.m.maine@nasa.gov, no later than March 22, 2024 @ 4:00 PM CDT. When responding reference “DRFP 80SSC024R0004” in the subject of the email. Please refer to the excel document attached titled “Draft Response Template Format” for the formatting of questions/comments.
NASA Clause 1852.215-84, Ombudsman, is applicable. The Center Ombudsman for this acquisition can be found at : https://www.hq.nasa.gov/office/procurement/regs/Procurement-Ombuds-Comp-Advocate-Listing.pdf
If a solicitation is released, then it and any additional documents will be available on www.Sam.gov. It is the offeror's responsibility to monitor this website for the release of the solicitation and amendments (if any). Potential offerors will be responsible for downloading their own copy of the solicitation and amendments, if any.
NASA intends to publicize a listing of respondents in order to facilitate teaming arrangements. Should your firm desire not to be included in this listing, clearly indicate this desire in your response.
Update #1 ·
THIS IS NOT A REQUEST FOR PROPOSAL. NO PROPOSALS ARE TO BE SUBMITTED IN RESPONSE TO THIS NOTICE.
This notice is issued by the NASA/John C. Stennis Space Center (SSC) to post a DRAFT REQUEST FOR PROPOSAL (DRFP) to solicit responses from interested parties. This document is for information and planning purposes and to allow industry the opportunity to verify reasonableness and feasibility of the requirement, as well as promote competition.
RFI #80SSC023K0003, Facilities Infrastructure Contract (FIC) was released on July 18, 2023. Since then, the title of the acquisition has changed to Combined Operations, Services, Maintenance, and Infrastructure Contract (COSMIC).
COSMIC is the follow-on to the Synergy-Achieving Consolidated Operations and Maintenance Contact (SACOM). The principal purpose of the COSMIC requirements are to provide facility operations, service and maintenance at SSC and Marshall Space Flight Center’s Michoud Assembly Facility (MAF) for NASA and its tenants.
COSMIC is a mechanism for facility services at SSC in Mississippi and MAF in Louisiana. MAF is managed by and reports to MSFC; under COSMIC, one Contractor will provide services to both locations, SSC and MAF. The Contractor shall manage and shall provide all services, equipment, and supplies, except as provided as Government Property, to implement the COSMIC Performance Work Statement (PWS).
The COSMIC PWS consists of Core service operations and Indefinite Delivery, Indefinite Quantity (IDIQ) requirements spread among the following work elements: Contract Management, Logistics, Safety, Health and Environmental Compliance, Engineering and Manufacturing Support Services, Site Services, Facility Operations & Maintenance Services, and Environmental Services and Program Management.
COSMIC is anticipated to be a Hybrid Cost-Plus Incentive Fee, Firm Fixed Price, IDIQ contract with Options Periods.
This presolicitation synopsis is not to be construed as a commitment by the Government, nor will the Government pay for the information submitted in response. The Government may not respond to questions/concerns submitted. The Government will use the information to finalize the RFP as necessary.
Industry Days will be held at SSC on March 6, 2024 and at MAF on March 7, 2024. Details for attendance are within the CO Cover Letter and/or Section L of the DRFP.
All comments or questions shall be submitted electronically via email to Sarah Maine at sarah.m.maine@nasa.gov, no later than March 22, 2024 @ 4:00 PM CDT. When responding reference “DRFP 80SSC024R0004” in the subject of the email. Please refer to the excel document attached titled “Draft Response Template Format” for the formatting of questions/comments.
NASA Clause 1852.215-84, Ombudsman, is applicable. The Center Ombudsman for this acquisition can be found at : https://www.hq.nasa.gov/office/procurement/regs/Procurement-Ombuds-Comp-Advocate-Listing.pdf
If a solicitation is released, then it and any additional documents will be available on www.Sam.gov. It is the offeror's responsibility to monitor this website for the release of the solicitation and amendments (if any). Potential offerors will be responsible for downloading their own copy of the solicitation and amendments, if any.
NASA intends to publicize a listing of respondents in order to facilitate teaming arrangements. Should your firm desire not to be included in this listing, clearly indicate this desire in your response.
Files
Show all 18
Notice history
| Notice | Type | Posted |
|---|---|---|
| Combined Operations, Services, Maintenance, and Infrastructure Contract (COSMIC) at John C. Stennis Space Center and Michoud Assembly Facility | Solicitation | |
| This notice | Pre-Solicitation | |
| Facilities Infrastructure Contract (FIC) at NASA John C. Stennis Space Center and Michoud Assemble Facility | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity