About this opportunity

The Federal Highway Administration anticipates soliciting construction services for the Holzwarth Culvert replacement project in Rocky Mountain National Park, Colorado, with advertisement expected in September 2026.

The project replaces a six-barrel corrugated metal arch pipe culvert on the Holzwarth Access Road with a steel girder bridge. The culvert is located approximately nine miles north of Grand Lake, Colorado, along US Highway 34 at 8,900 feet elevation and currently conveys Colorado River flow while providing access to the Holzwarth Historic Site and employee housing. The work scope includes removal of the existing culvert, construction of a new steel girder bridge with cast-in-place concrete deck, new bridge abutments and micropiles, temporary stream diversion and riprap, new aggregate roadway surfacing, and relocation of an existing electrical line and historic head gates into a new concrete slab. Principal work items consist of one bridge removal, 120 tons of roadway aggregate, one prefabricated modular steel bridge (10 feet wide by 48 feet long), 180 linear feet of 8.68-inch diameter micropiles, and temporary stream diversion.

Access constraints are significant: the Holzwarth Culvert Access Road is approximately 13 feet wide with tight turns, requiring temporary widening to prevent truck off-tracking onto sensitive environmental resources. A temporary truck turnaround is necessary as no construction access is permitted more than 100 feet west of the bridge. This is not an invitation for bid; plans and specifications are not yet available. The pre-solicitation notice response deadline is September 9, 2026.

Notice text

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE

PROJECT NUMBER: CO NP ROMO 407(1)

PROJECT NAME: Holzwarth Culvert

PROJECT DESCRIPTION: 

This project will replace the deficient Holzwarth Culvert (Structure No. 1520-029S), a six-barrel corrugated metal arch pipe culvert on the Holzwarth Access Road with a steel girder bridge. Located in Rocky Mountain National Park, approximately nine miles north of Grand Lake, CO, along US HWY 34 at an elevation of 8,900 feet, the culvert conveys flow from the Colorado River and provides access to the Holzwarth Historic Site. The purpose of this project is to prevent future roadway damage and flooding while maintaining access to employee housing, the historic site, and National Park Service and Forest Service recreation opportunities.

SCOPE OF THE WORK:   

The project will consist of removal of the existing six barrel culvert and construction of a new steel girder bridge with a cast in place concrete deck. New bridge abutments and micropiles. Temporary stream diversion and riprap. New aggregate roadway surfacing. Relocation of an existing electrical line. Relocation of existing historic head gates into a new concrete slab. Access to the site is through a gate at the south end of the Holzwarth Historic Site Parking Lot and along the Holzwarth Culvert Access Road. The Holzwarth Culvert Access Road is approximately 13’ wide with tight turns. Temporary widening will be necessary to prevent truck off tracking on to sensitive environmental resources. A temporary truck turnaround will also be necessary as no construction access is allowed more than 100’ west of the bridge.

PRINCIPAL WORK ITEMS:

  • 20304-2000 Removal of Bridge: 1 EACH
  • 30202-2000 Roadway Aggregate, Method 2: 120 TON
  • 55504-0000 Prefabricated Steel Bridge (10’ wide x 48’ long modular steel vehicular bridge): 1 LPSM
  • 56701-0000 Micropile (8.68” dia.): 180 LNFT
  • 62801-0000 Temporary Stream Diversion: 1 LPSM

ANTICIPATED SCHEDULE: 

Advertisement – September 2026

Award – December 2026

NTP – December 2026

Contract Completion – November 2027

ESTIMATED COST RANGE:

 Total estimated cost between $700,000 and $2,000,000.

Notice history

Notice Type Posted
CO NP ROMO 407(1) Holzwarth Culvert Latest solicitation Solicitation
This notice Pre-Solicitation
CO NP ROMO 407(1) Holzwarth Culvert Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
ND NP THRO 204(1) Buck Hill Road Medora, North Dakota, United States · NAICS 237310 Federal Highway Administration No set-aside
UT NP ARCH 100(2) Bridges on Delicate Arch Road Moab, Utah 84532, United States · NAICS 237310 Federal Highway Administration No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity