CJAG Underground Utilities Construction

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9136426QA076
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Ravenna, Ohio 44266, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Ohio Army National Guard seeks construction of underground utilities at Camp James A. Garfield Joint Training Center in Ravenna, Ohio, with quotations due September 28, 2026 at 10:00 AM EDT. This is a 100% small business set-aside issued as a firm-fixed-price purchase order RFQ.

Place of performance is Ravenna, OH 44266. The scope includes approximately 9,900 linear feet of open-cut trenching, 5,000 linear feet of electrical conduit routes with 36 pull boxes, 4,900 linear feet of communications conduit routes with 42 pull boxes, 500 linear feet of grounding rods installed at 36 earth grounding termination points, concrete-encased roadway crossings, 60 linear feet of dual-wall fuel line with four termination points and bolted flanges, backfill, compaction, stone-road restoration to ODOT 304 specifications, testing, quality control, submittals, and closeout documentation. All trenching shall use open-cut excavation; boring and tunneling are prohibited. Electrical and communications conduits may be combined in a single trench. Conduits shall be rigid metal conduit or PVC Schedule 80 as specified. Work must be performed Monday through Friday, 07:30–17:00 hours, excluding federal holidays, and completed within 60 calendar days after notice to proceed, anticipated 30 September 2026. All contractor personnel must obtain Common Access Card clearance, complete Awareness Training Level 1 and iWATCH training within 30 days of contract start, and maintain a Quality Control Plan addressing all performance requirements.

The estimated contract magnitude is $250,000 to $500,000. Award will be made without discussions to the responsible quoter offering best value based on technical acceptability, past performance relevance to medium-voltage electrical systems and utility infrastructure, and price reasonableness. A bid guarantee is required with the quotation; performance and payment bonds are required no later than 10 days after receipt of order. Questions are due September 17 at 17:00 EDT. A mandatory site visit is scheduled for September 17 at 10:00 PM EDT; contact 1SG Brian Persing (614-336-6975) or CW2 Grant Stoner (614-336-6580) to arrange. A valid photo ID is required for site access. NAICS 237130, PSC Y1PZ.

Notice text

3 versions

Update #3 · Latest ·

23 Sep 26 - Added missing PDF document - updated PWS_Underground utilities_REVISED 09-21-2026

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Amendment 1 - 22 Sep 26

Added: Q&A response

Added: revised statement of work and drawings

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

The requirement includes installation of underground fuel-transfer conduits, electrical conduit routes, communications conduit routes, pull boxes, grounding points, concrete-encased roadway crossings, open-cut trenching, backfill, compaction, stone-road restoration, testing, quality control, submittals, and closeout documentation.

Site Visit: call 1SG Brian Persing at 614-336-6975 or CW2 Grant Stoner at 614-336-6580 with question regarding site visit.  Do not contact them for any other questions.  A valid photo ID is required to enter the installation.

Quotation Due: 28 September 2026, 10:00 AM EDT

Bonding: Bid guarantee is required with offer.  Performance and Payment bonds are required prior to issuance of notice to proceed.  Performance and Payment bonds are required NO LATER THAN 10 days after receipt of order (ARO).

Magnitude: Between $250,000 to $500,000

Update #2 ·

Amendment 1 - 22 Sep 26

Added: Q&A response

Added: revised statement of work and drawings

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

The requirement includes installation of underground fuel-transfer conduits, electrical conduit routes, communications conduit routes, pull boxes, grounding points, concrete-encased roadway crossings, open-cut trenching, backfill, compaction, stone-road restoration, testing, quality control, submittals, and closeout documentation.

Site Visit: call 1SG Brian Persing at 614-336-6975 or CW2 Grant Stoner at 614-336-6580 with question regarding site visit.  Do not contact them for any other questions.  A valid photo ID is required to enter the installation.

Quotation Due: 28 September 2026, 10:00 AM EDT

Bonding: Bid guarantee is required with offer.  Performance and Payment bonds are required prior to issuance of notice to proceed.  Performance and Payment bonds are required NO LATER THAN 10 days after receipt of order (ARO).

Magnitude: Between $250,000 to $500,000

Update #1 ·

The requirement includes installation of underground fuel-transfer conduits, electrical conduit routes, communications conduit routes, pull boxes, grounding points, concrete-encased roadway crossings, open-cut trenching, backfill, compaction, stone-road restoration, testing, quality control, submittals, and closeout documentation.

Site Visit: 17 September 2026,10:00 PM EDT, call 1SG Brian Persing at 614-336-6975 or CW2 Grant Stoner at 614-336-6580 with question regarding site visit.  Do not contact them for any other questions.  A valid photo ID is required to enter the installation.

Questions Due: 17 September 2026, 5:00 PM EDT

Quotation Due: 24 September 2026, 10:00 AM EDT

Bonding: Bid guarantee is required with offer.  Performance and Payment bonds are required prior to issuance of notice to proceed.  Performance and Payment bonds are required NO LATER THAN 10 days after receipt of order (ARO).

Magnitude: Between $500,000 and $1,000,00

Files

Notice history

Notice Type Posted
CJAG Underground Utilities Construction Award Award Notice
This notice Latest solicitation Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity