This document is a site plan depicting the layout of a federal facility or installation with designated areas for equipment placement and infrastructure.
The plan shows eight equipment locations labeled E1 through E6 (marked in red) and eight cable/conduit routes labeled C1 through C8 (marked in yellow). Key infrastructure elements include fuel lines running along the perimeter, pad grounding points marked with red stars at six locations throughout the site, and a support area centrally located. Power distribution infrastructure is noted as being provided by others and is shown with a blue line traversing the northern portion of the site. The fuel lines are represented by a yellow line following the western boundary and extending through the site. A compass rose and scale bar are provided for site orientation and measurement reference. The document appears to serve as a technical reference for construction, installation, or maintenance work related to the placement of equipment and routing of utilities across the facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS_Underground utilities_REVISED 09-21-2026.pdf | ||
| Combined Synopsis Solicitation_Underground Utilities_Amendment 1.docx | DOCX document | |
| Underground Utility - Layout Sketch-21 Sep 26-Revised.pdf | ||
| PWS_Underground utilities_11 Sep 2026.docx | DOCX document | |
| Combined Synopsis Solicitation_Underground Utilities.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Support Area
Power Distro (By Others)
Fuel Lines
E2
E6
E5
E4
E3
E1
C8
C7
C6
C5
C4
C3
C2
C1
C1
Pad Grounding Points
Slide Number 1