CGC MUNRO Auxiliary Sea Water Piping Renew

Closed Solicitation Posted

Solicitation number
70Z08519QP45J0600
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
336611 Ship Building and Repairing
PSC
Not on record
Place of performance
Cgc Munro U.S. Coast Guard Island 1 Eagle Rd Alameda, CA 94501 Us Alameda, California 94501, United States

Notice details come from SAM.gov. Updated .

Notice text

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-84 dated Nov 1, 2015. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5. Past performance will be considered in the selection of the awarded vendor.

The United States Coast Guard Surface Force Logistics Center has a requirement for the following:



WORK ITEM 1: Auxiliary Sea Water Piping, Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to repair Auxiliary Sea Water (ASW) piping, located in the Aft Main Machinery Room (Compartment 5-52-01-E).
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 750-WMSL-520-001, Rev H, Seawater Cooling System Diagram
Coast Guard Drawing 750-WMSL-520-010, Rev G, Salt Water Cooling System Unit 2310
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
• Decking
• Piping
NOTE
A verification ship check by the contractor prior to bidding is recommended to identify additional interferences and the amount of space available for pipe welding & repair. For ship check, the contractor shall contact Port Engineer.
3.1.5 Gas Free. The Contractor shall be responsible for ensure the work has been and gas free, by a certified Marine Chemist, Industrial Hygienist or Equivalent. The work shall be certified by the Marine Chemist, Industrial Hygienist or competent person every 24 hours while hot is be completed.
3.2 Fluid handling. The Contractor shall remove and dispose of removed fluids from the affected piping system, in accordance with all applicable Federal, state, and local regulations.
WARNING
Do not drain ANY fluids, including fresh water, into any space, bilge, or exterior location.
3.3 Piping repair. The Contractor shall repair the ASW piping connection between the forward port line shaft bearing discharge piping and the starboard overboard discharge piping. Area of leak has been temporarily patched by Ship's Force. Details are provided in Coast Guard Drawings 750-WMSL-520-001 and 750-WMSL-520-010.
3.3.1 Verify ASW piping to be repaired with Ship's Force prior to beginning repair.
3.3.2 All welding shall be in accordance with SFLC Std Spec 0740.
NOTE
The Contractor shall, at no additional cost to the Government, perform NDE in accordance with SFLC Std Spec 0740 in lieu of Hydrostatic test to all newly installed welded piping joints in accordance with applicable sections in SFLC Std Spec 0740. The choice between these alternatives is solely the Contractor's and should be based on his evaluation of the costs involved.
3.4 NDE. The Contractor shall perform NDE of the newly installed piping in accordance with SFLC Std Spec 0740, Appendix C.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.5 Hydrostatic test. After all authorized repairs, the Contractor shall hydrostatically test all new and disturbed piping and components of the window washer fluid system in accordance with SFLC Std Spec 0740, Appendix C, Hydrostatic Test. Ensure zero leakage from or permanent deformation of pressure-containing parts by repairing all leaks, deformations, and discrepancies. Submit a CFR.
3.6 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
3.7 Touch-up preservation, general. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs).
4. NOTES
This section is not applicable to this work item.



WORK ITEM 2: Cofferdam, Install
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to install cofferdams at the sea chests related Work Item: Auxiliary Sea Water Piping, Renew.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 418A-WMSL-101-005, Rev -, Shell Expansion Scantlings
Coast Guard Drawing 750-WMSL-100-031, Rev J, Unit 2300 Structure - Inner Bottom - FR 52 to FR 64
Coast Guard Drawing 750-WMSL-520-001, Rev H, Seawater Cooling System Diagram
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
OTHER REFERENCES
Naval Sea Systems Command (NAVSEA) S0600-AA-PRO-160, 8/15/2008, Underwater Ship Husbandry Manuals - Chapter 16 (Cofferdams)
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.1.5 Work coordination. The Contractor shall coordinate work on this item with following Work Item:
• Auxiliary Seawater Piping, Renew.
3.2 Work Location. The concerned work areas are:
• Aft Main Machinery Room (AMMR) starboard sea chest for MPDE #1
• AMMR port sea chest for MPDE #2
• AMMR MPDE seawater overboard discharge
3.3 Cofferdam Fabrication. The Contractor shall fabricate and install a cofferdam over the port and starboard sea chests for MPDE #1 and #2 and the MPDE seawater overboard discharge to prevent water intrusion. See Coast Guard Drawings 418A-WMSL-101-005, 750-WMSL-100-031, and 750-WMSL-520-001 for guidance.
3.3.1 Cofferdam fabrication and installation shall be accordance with the NAVSEA S0600-AA-PRO-160.
3.3.2 The Contractor shall remove cofferdams at the completion of auxiliary sea water piping renewal.
3.3.3 Inspect the structure surrounding the cofferdam for deterioration and corrosion and submit a CFR.
4. NOTES
This section is not applicable to this work item.


PLEASE REVIEW FULL SCOPE OF WORK IN ATTATCHMENTS SECTION.


POP FOR WORK IS AUGUST 12TH - AUGUST 16TH 2019


INTERESTED VENDORS PLEASE SEND OFFICIAL QUOTE, WITH A SAM.GOV REGISTERED DUNS NUMBER, AND EMAIL TO ANTHONY.J.ANDALUZ@USCG.MIL


.

Files

File Type Posted
SF30.doc DOC document
63110_CffrdmInstl_418.doc DOC document
S19_XXX_52000_PpngRnwl_755.doc DOC document

On GovTribe

Work this opportunity

  • Track it in your pipeline