CGC chippewa fire panel
Closed Solicitation Posted
- Solicitation number
- 70Z085001989
- Agency
-
Coast Guard
Department of Homeland Security
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 336611 Ship Building and Repairing
- Place of performance
- Buchanan, Tennessee 38222, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Homeland Security's US Coast Guard is seeking a small business contractor to upgrade the fire alarm system on the USCGC CHIPPEWA, a 75' vessel located in Buchanan, Tennessee. The primary objective is to replace the obsolete Notifier AFP 200 Fire system with a new Notifier AFP 320 system, which involves renewing all system components, performing comprehensive testing, and ensuring proper installation. Contractors must provide all labor, materials, and tools necessary to complete the upgrade, with specific requirements including protective measures, component removal, disposal, and system reconfiguration. The solicitation requires contractors to conduct a thorough system evaluation, install new components according to Coast Guard drawings, and perform system testing in the presence of an Engineer Petty Officer. All work must be completed within a 14-day period of performance, starting no later than 10 calendar days from the contract award date.
The contract is designated as a Total Small Business set-aside and will be performed at 700 Coast Guard Rd. in Buchanan, TN, with work hours typically between 0730 and 1600 EST, Monday through Friday. The contractor must provide NFPA fire alarm certification and conduct system operation training for ship personnel upon successful testing. All travel and associated expenses will be the contractor's responsibility, with no government-furnished resources provided. The contractor must submit a trip report and warranty documentation within 7 days of completing the work. While specific award value is not detailed, the contract falls under NAICS category 336611 (Ship Building and Repairing) and PSC category J020 (Maintenance/Repair/Rebuild of Ship and Marine Equipment), with a strict requirement for high-quality, professionally executed marine system upgrade services.
Notice text
STATEMENT OF WORK (SOW)
FOR
USCGC CHIPPEWA Renew Fire Alarm Panel and System Components
CHIPPEWA has an immediate need for technical support for tasks outlined in this Statement of Work (SOW).
1.0 GENERAL
-
- Background
The 75’ WLR asset, USCGC CHIPPEWA’s current Notifier AFP 200 Fire is obsolete and needs to be upgraded to the Notifier AFP 320 system.
-
- Scope
The scope of this contract is defined by the efforts and tools required to support USCGC CHIPPEWA (WRL 75404). The Contractor shall provide all labor, materials, and tools necessary to renew all system components outlined below.
-
- OBJECTIVE
The goal is to upgrade CGC CHIPPEWA’S fire alarm system to the NOTIFIER AFP 320, upgrade/renew all other system components, and restore the system zones to designed configuration.
-
- APPLICABLE DOCUMENTS
-
-
- Compliance Documents
-
The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2022, General Requirements
Coast Guard Drawing 75F-WLR -436-001, Fire/Flood Alarm System
- SPECIFIC REQUIREMENTS/TASKS
Unless otherwise stated, this contract applies to on-site support for USCGC CHIPPEWA (WLR 75404) in Buchanan, TN.
2.1 RENEW NOTIFIER FIRE ALARM SYSTEM
The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work.
-
-
- Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
-
-
-
- Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
-
-
-
- Renewal. The Contractor shall renew all components of the existing NOTIFIER AFP 200 with Notifier AFP 320 using the relevant Coast Guard Drawing(s) as guidance.
-
NOTE
Although some components may be compatible with both the NOTIFIER AFP 200 and 320 systems; the contractor shall renew all components regardless of condition or compatibility except existing wiring that is deemed satisfactory by the contractor.
-
-
- Removal. The Contractor shall remove all existing components except existing wiring that is adequate for use in the Notifier AFP 320 system and deemed in satisfactory condition by the installing contractor.
-
-
-
- Disposal. The Contractor shall dispose of all removed materials in accordance with all applicable federal, state, and local regulations.
-
-
-
- Notifier AFP 320 system components installation. The Contractor shall install Notifier AFP 320 panel with new components compatible with Notifier AFP 320 system in accordance with details in Coast Guard Drawing 75F-WLR -436-001, Fire/Flood Alarm System.
-
-
-
- Configuration compliance. The Contractor shall return any zone configuration abnormalities back to designed configuration in accordance with Coast Guard Drawing 75F-WLR -436-001, Fire/Flood Alarm System. This may include adding, deleting, or relocating wiring and system components.
-
2.2 FIRE ALARM SYSTEM TEST
The Contractor shall ensure all system components identified in section 2.1 have been renewed by preforming a walkthrough of all spaces with the Engineer Petty Officer (EPO) or the EPO’s designated representative.
-
-
- Test System. The Contractor shall test all sensors and components IAW with industry standards in the presence of the Engineer Petty Officer (EPO) or the EPO’s designated representative.
- System Certification: TheContractor shall provide applicable NFPA fire alarm certification to the Engineer Petty Officer (EPO) or the EPO’s designated representative.
- Warranty: The Contractor shall ensure system installation meets OEM specifications and provide OEM standard warranty.
-
-
-
- System Training. The Contractor shall conduct system operation training with ships force upon completion of successful system testing/certification.
-
- CONTRACTOR PERSONNEL
3.1 The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
- OTHER APPLICABLE CONDITIONS
4.1 PERIOD of Performance
The period of performance for this contract shall start no later than 10 calendar days from the date of award and end no later than 14 days after commencement of work.
4.2 PLACE OF PERFORMANCE
The primary place of performance will be at CGC CHIPPEWA at 700 Coast Guard Rd., Buchanan, TN 38222, unless an alternate location is approved by the Coast Guard.
4.3 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Petty Officer (EPO) as scheduling is subject to ship’s operations.
4.4 TRAVEL
Contractor travel may be required to support this requirement. All travel required by this task shall be provided by the Contractor at no expense to the Government.
5.0 GOVERNMENT FURNISHED RESOURCES
None.
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0.
- GOVERNMENT ACCEPTANCE PERIOD
The EPO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the EPO will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
8.0 DELIVERABLES
The Contractor shall provide a trip report and warranty no later than 7 days after returning to the home office.
RDD/POP: 05FEB-19FEB
Files
| File | Type | Posted |
|---|---|---|
| Fire_Alram_upgrade_SOW (002).docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Firefighting protection system maintenance | — | No set-aside | |
| FM 200 | Coast Guard | Total Small Business | |
| Dock-side (DS): USCGC WAESCHE Quarter 2 FY27 Repair | — | No set-aside | |
| Fire Protection Services at USCG Air Station Sacramento | — | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity