About this opportunity

The Department of the Air Force Pacific Air Forces is seeking bids for the delivery and installation of 34,000 lbs. of 4mm particle carbon to complete a bulk paint booth carbon filter exchange at the 3rd MXS Fab Flight located at Joint Base Elmendorf-Richardson (JBER) in Alaska. The contractor will be required to remove and ship the old carbon for disposal or recycling, and install the new carbon per the original equipment manufacturer's instructions. The work covers four paint bays in Building 9696 and one paint bay in Building 6263. Quotes are due by 4:00 PM Alaska Standard Time on April 26, 2024 and will be evaluated solely on price, with the award going to the lowest priced, technically acceptable quote. Delivery and installation must be completed within 90 days of contract award.

This is a total small business set-aside solicitation under NAICS code 335991 with a 900 employee size standard. The estimated value is not disclosed, but the requirement is for 34,000 lbs. of 4mm particle carbon for the filter exchange and replacement at the JBER facility in Anchorage, Alaska. The current incumbent or contractor is not named.

Notice text

3 versions

Update #3 · Latest ·

The 3rd MXS Fab Flight located at Joint Base Elmendorf-Richardson (JBER) AK, requires filter maintenance on Bristol Environmental & Engineering Model CD-6626-PSB-82-ARC spray booth facilities as follows.

  1. Delivery and Installation of 34,000 lbs. of 4mm particle carbon to complete the bulk paint booth carbon filter exchange.
  2. Vendor shall Remove and ship old carbon for disposal or recycling.
  3. Install new carbon in accordance with the original equipment manufacturers (OEM) instructions.
  4. Four (4) paint bays in Building 9696 and one (1) paint bay in Building 6263 require carbon filter replacement.
  5. Vendor is responsible for furnishing all equipment and tools required to perform this maintenance task.

For more information on this requirement please see the attachments "Carbon Filters Combined Synopsis-Solicitation" and "Attachment 1 - Salient Characteristics"

Attachment "Questions and Answers" has been issued and updated for additional clarification on 15 April 2024 in response to questions received for this requirement. Additionally, this solication has been extended to accept quotes until 4:00 PM Alaska Standard Time on 26 April 2024.

Update #2 ·

The 3rd MXS Fab Flight located at Joint Base Elmendorf-Richardson (JBER) AK, requires filter maintenance on Bristol Environmental & Engineering Model CD-6626-PSB-82-ARC spray booth facilities as follows.

  1. Delivery and Installation of 34,000 lbs. of 4mm particle carbon to complete the bulk paint booth carbon filter exchange.
  2. Vendor shall Remove and ship old carbon for disposal or recycling.
  3. Install new carbon in accordance with the original equipment manufacturers (OEM) instructions.
  4. Four (4) paint bays in Building 9696 and one (1) paint bay in Building 6263 require carbon filter replacement.
  5. Vendor is responsible for furnishing all equipment and tools required to perform this maintenance task.

For more information on this requirement please see the attachments "Carbon Filters Combined Synopsis-Solicitation" and "Attachment 1 - Salient Characteristics"

Attachment "Questions and Answers" has been issued on 15 April 2024 in response to questions received for this requirement. Additionally, this solication has been extended to accept quotes until 4:00 PM Alaska Standard Time on 26 April 2024.

Update #1 ·

The 3rd MXS Fab Flight located at Joint Base Elmendorf-Richardson (JBER) AK, requires filter maintenance on Bristol Environmental & Engineering Model CD-6626-PSB-82-ARC spray booth facilities as follows.

  1. Delivery and Installation of 34,000 lbs. of 4mm particle carbon to complete the bulk paint booth carbon filter exchange.
  2. Vendor shall Remove and ship old carbon for disposal or recycling.
  3. Install new carbon in accordance with the original equipment manufacturers (OEM) instructions.
  4. Four (4) paint bays in Building 9696 and one (1) paint bay in Building 6263 require carbon filter replacement.
  5. Vendor is responsible for furnishing all equipment and tools required to perform this maintenance task.

For more information on this requirement please see the attachments "Carbon Filters Combined Synopsis-Solicitation" and "Attachment 1 - Salient Characteristics"

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
Filter,air,electrosta Construction and Equipment Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors