Cano martin pena ecosystem restoration project (CMP-ERP) contract 3 phase 1, excavation and stabilization

Award Notice Posted

Solicitation number
W51DQV25RA004
Agency
Awarded
Set-aside
No set-aside

Opportunity facts

Contract number
W51DQVCA007
Place of performance
U.S. Army Corps of Engineers, Caribbean District 383 Franklin D. Roosevelt Ave San Juan, Puerto Rico 00918 00918

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army awarded contract W51DQVCA007 valued at $57,427,000 to Novel Construction LLC for Phase 1 of the Cano Martin Pena Ecosystem Restoration Project, specifically focusing on excavation and stabilization work. The contract encompasses comprehensive site development and dredging operations, including dredging a 3,000-meter access channel across San Jose Lagoon, a 450-meter transition channel, and a 900-meter main channel from the Barbosa Bridge to the San Jose Lagoon transition channel. Additional scope includes debris removal, sheet pile installation, bridge protection measures for the Moscoso Bridge, construction of steel sheet pile walls with concrete caps, and building a 61-meter riprap channel at the Barbosa Bridge to prevent foundation scour. The project also involves establishing a Material Management Area at Ciudad Deportiva Roberto Clemente and managing aquatic disposal operations across multiple designated pits.

Notice text

This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP. Awarded contract W51DQVCA007 to NOVEL CONSTRUCTION LLC for 57427000 on 2025-09-30.

Notice history

Notice Type Posted
This notice Award Award Notice
Cano martin pena ecosystem restoration project (CMP-ERP) contract 3 phase 1, excavation and stabilization Latest solicitation Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors