CA NP GOGA 469(1) China Beach Access Road

Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
6982AF22B000006
Agency
Responses due
Not on record
Set-aside
HUBZone

Opportunity facts

Place of performance
San Francisco, California, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice is for the reconstruction of the China Beach Access Road parking lot and trail located in San Francisco, California. The Department of Transportation Federal Highway Administration seeks to reconstruct the parking lot, construct new retaining walls along the trail, and perform various utility and landscaping work. Significant items include clearing, excavation, soil nail retaining walls, roadway aggregate, asphalt and concrete paving. The evaluation criteria and contract terms will be detailed in the forthcoming solicitation to be issued in March 2022. Construction is anticipated to last from May 2022 to May 2023.

The set-aside designation for this project is HUBZone. Significant quantities include clearing 1 acre, excavating 716 cubic yards of roadway, constructing 8,771 square feet of soil nail retaining walls, and paving with 230 tons of asphalt and 634 square yards of concrete. The engineer's estimate for the work is between $5-10 million. Key dates include the anticipated solicitation issuance in March 2022 and completion of the one-year construction period by May 2023.

Notice text

THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

THIS PROJECT WILL BE ADVERTISED AS A HUBZONE SET ASIDE.

PROJECT DETAILS: CA NP GOGA 469(1) China Beach Access Road

PROJECT DESCRIPTION:  The project scope includes reconstructing the parking lot for the access to China Beach in San Francisco, California.  The project also includes constructing new retaining walls along the trail from the parking lot to Chin Beach, sewer and water utility work, and landscaping.  The project is within lands owned by the National Park Service (Golden Gate National Recreation Area) and the City of San Francisco.

SIGNIFICANT QUANTITIES:

Significant items include (quantities are subject to change):

  •  1 Acre, Clearing and grubbing
  • 716 Cubic Yards of Roadway Excavation
  • 8,771 Square Feet of Soil nail retaining walls
  • 1,392 Cubic Yards of Roadway Aggregate
  • 230 Tons of Asphalt Concrete Pavement
  • 234 Square Yards of 6” concrete pavement
  • 296 Square Yards of 6” colored concrete pavement
  • 311 Linear Feet of colored concrete curb
  • 1 Domestic and Fire Water System
  • Irrigation system, Lump Sum
  • Sanitary Sewer System, Lump Sum
  • Pump and Sump Pit Sanitary System, Lump Sum
  • 289 Square Yards of colored concrete sidewalk
  • 164 linear feet of fence
  • 1 Gate

ANTICIPATED SCHEDULE:

It is anticipated this project will be advertised in March, 2022. Construction is anticipated between May, 2022 and May, 2023.

ENGINEER’S ESTIMATE: 

The proposed project is estimated at a cost between $5 million and $10 million.

Notice history

Notice Type Posted
CA NP GOGA 469(1) China Beach Access Road Award Award Notice
CA NP GOGA 469(1) China Beach Access Road Latest solicitation Solicitation
CA NP GOGA 469(1) China Beach Access Road Pre-Solicitation
This notice Pre-Solicitation
CA NP GOGA 469(1) China Beach Access Road Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
GOGA 336173 - Repair Conzelman Road NAICS 237310 National Office No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity