CA FTNP YOSE 14(5) & 219(2), South Entrance Wawona Road & Mariposa Grove Road

Award Notice Posted

Solicitation number
DTFH6816B00023
Agency
Awarded
to Herback General Engineering LLC
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH6816C00037 Federal contract award
PSC
Not on record
Place of performance
Yosemite National Park Groveland, California 95321, United States

Notice details come from SAM.gov. Updated .

Notice text


THIS IS NOT AN INVITATION FOR BID.  PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE.  THE TENATIVE ADVERTISEMENT DATE IS AUGUST 4, 2016.  THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS.



Project Description:


 


This project will consist of roadway resurfacing, restoration, rehabilitation, and reconstruction of approximately 2.8 miles of roadway on the CA FTNP YOSE 14(5) & 219(2) project in Yosemite National Park, Mariposa County, California.  Work is included on 0.9 miles Wawona Road at the South Entrance, and 1.9 miles of Mariposa Grove Road from the South Entrance to the Lower Grove.  The estimated price range is between $5,000,000 and $8,000,000. The anticipated advertisement date is July 2016.  Construction is anticipated from October 2016 to May 2017.  Mariposa Grove Road will remain closed to the public during construction.


 


Principle work items include 10,000 tons of hot asphalt concrete pavement, 8,000 tons of aggregate base, 5,000 cubic yards of roadway excavation, 2,700 cubic yards of subexcavation, 2.7 miles of full depth reclamation (pulverizing), 4,000 square feet of rockery, 3,100 square feet of mechanically stabilized earth wall (with stone masonry facing) and 14,000 feet of concrete curb.  Work also includes roundabout construction at the intersection of Wawona Road and Mariposa Grove Road and drainage and site improvements.


 


All of the work is occurring in cultural and natural resource sensitive areas.  Construction phasing, temporary traffic control, and timely completion of construction will be very important to minimize disruptions to park visitors throughout construction.  Temporary traffic control will need to accommodate vehicles, bicycles, and pedestrians.


 


Construction Duration: Construction is anticipated from October 2016 to May 2017. Mariposa Grove Road will remain closed to the public during construction.


 


The contracting range for this project is $5,000,000.00 to $8,000,000.00


Files

File Type Posted
00_CA_FTNP_YOSE_14(5)_ _219(2)_SOQ_ _EE.pdf PDF
Bid_Opening_Summary.pdf PDF
Bid_Opening_Summary.pdf PDF
A002.pdf PDF
08_29_2016.pdf PDF
08_22_2016.pdf PDF
YOSE_14(5)_Pre-Bid_sign-in_sheet.pdf PDF
A001.pdf PDF
CA_FTNP_YOSE_14(5)_ _219(2)_Hydraulics_Technical_Memo.pdf PDF
CA_FTNP_14(5_ _219(2)_Geotech_Report.pdf PDF
DTFH6816B00023.pdf PDF
CA_FTNP_YOSE_14(5)_ _219(2)_100__Plans.pdf PDF
Show all 12

Notice history

Notice Type Posted
This notice Latest Award Notice
CA FTNP YOSE 14(5) & 219(2), South Entrance Wawona Road & Mariposa Grove Road Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors