CA FTFW MERC 915(1), TRAILS(1), Trail and Parking Area

Closed Solicitation Posted

Solicitation number
6982AF19B000017
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y Construct Of Structures/Facilities
Place of performance
Merced National Wildlife Refuge Merced County CA 95341 USA

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

THIS PROJECT WILL BE ADVERTISED ON A TOTAL SMALL BUSINESS SET ASIDE BASIS.  

CA FTFW MERC 915(1), Trail(1) Parking Area and Trails.  The project is located in Merced National Wildlife Refuge, which is approximately 15 miles southwest of Merced, CA in Merced County. The project consists of the rehabilitation of 1.1 miles of trail system for Schedule A and approximately 0.84 miles of trails on Option X. Additional work consists of re-gravelling of small parking area, construction of ABA concrete parking pads, concrete sidewalk, signage, and striping.

Proposed improvements include parking rehabilitation and construction, aggregate base, parking concrete pads, signing, pavement markings, and aggregate surface for trails.

Significant quantities are as follows:

 

Schedule A:

2,600 TON of aggregate surface course

1.1 miles of aggregate surface reconditioning

 110 SQYD of minor concrete pavement, plain, 6-inch depth

Option X:

1,150 TON of aggregate surface course

0.84 miles of aggregate surface reconditioning

 

The anticipated advertisement date is September2019.  Construction is anticipated from November 2019 to February 2020.

Update #1 ·

THIS PROJECT WILL BE ADVERTISED ON A TOTAL SMALL BUSINESS SET ASIDE BASIS.  

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

CA FTFW MERC 915(1), Trail(1) Parking Area and Trails.  The project is located in Merced National Wildlife Refuge, which is approximately 15 miles southwest of Merced, CA in Merced County. The project consists of the rehabilitation of 1.1 miles of trail system for Schedule A and approximately 0.84 miles of trails on Option X. Additional work consists of re-gravelling of small parking area, construction of ABA concrete parking pads, concrete sidewalk, signage, and striping.

 

 

Proposed improvements include parking rehabilitation and construction, aggregate base, parking concrete pads, signing, pavement markings, and aggregate surface for trails.

 

Significant quantities are as follows:

 

Schedule A:

2,600 TON of aggregate surface course

1.1 miles of aggregate surface reconditioning

 110 SQYD of minor concrete pavement, plain, 6-inch depth

 

Option X:

1,150 TON of aggregate surface course

0.84 miles of aggregate surface reconditioning

 

The anticipated advertisement date is September2019.  Construction is anticipated from November 2019 to February 2020.

Files

File Type Posted
Bid_Opening_Summary.pdf PDF
Q&A_10-15-19.pdf PDF
Q&A_10-7-19.pdf PDF
Q&A_Oct_1-2019.pdf PDF
QnA_9.24.2019.pdf PDF
Amendment_A00l.pdf PDF
CA_FTFW_MERC_915(1),_Trail(1)_100__FINAL_Plans.pdf PDF
6982AF19B000017.pdf PDF