Q&A_10-15-19.pdf

PDF 204 KB Posted

Attached to
CA FTFW MERC 915(1), TRAILS(1), Trail and Parking Area
Solicitation number
6982AF19B000017
Issued by

View the file

Other files

File Type Posted
Bid_Opening_Summary.pdf PDF
Q&A_10-7-19.pdf PDF
Q&A_Oct_1-2019.pdf PDF
QnA_9.24.2019.pdf PDF
Amendment_A00l.pdf PDF
6982AF19B000017.pdf PDF
CA_FTFW_MERC_915(1),_Trail(1)_100__FINAL_Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for CA FTFW MERC 915(1), TRAIL(1), Parking Area & Trails

October 15, 2019

Questions Answers 1 Does the refuge have a water source? Can we get water from the refuge for dust control, fire prevention and compaction?

See subsection 105.02(a) of the SCR’s.

2 Please confirm that the Erosion Control Supervisor, Qualified

SWPPP Practitioner and the Quality Control Manager can be the same person as long as all of the experience requirements are met.

Yes, as long as they have the qualifications to perform all three operations and can meet the requirements of a part time QC as mentioned in 153.

3 The solicitation provides a completion date however does not provide a contract duration. Please clarify when the contractor should anticipate a notice to proceed being issued so that the working days can be established.

Anticipated NTP is November 18, 2019.

4 The detail on sheet A5 for the aggregate parking area notes a 1.5% max slope however there are no contour lines shown on sheet C1, C2, D1. Please provide are of cut and fill in order to meet the project requirements.

No contours are available. Cut and fill is expected to be minimal from existing conditions.

5 Section 204.14 regarding disposal of unsuitable of excess material notes to “secure environmental clearances according to subsection 107.10(d).” Please clarify if there will be any spoils from excavation that will need to hauled off site or if the spoils can be disposed of on site.

Any excavated material from excavation from concrete pads may be spread per the not on sheet A5.

6 The solicitation does not address any delays associated with unsuitable soil conditions which could greatly affect the productivity and cost of the work to be completed. Will additional days be added to the contract period if the soil is unsuitable for work to be completed? An example of the loss of productivity would be having to use a tracked dump truck to transfer material throughout the trail if the soil is unsuitable to allow for a wheeled dump truck to drive the trail without damaging areas of the trail.

This is a means and methods question. No answer other than the contractor is to complete a site visit.

7 As there has been no geotechnical exploration performed at this location, can there be a contingency force account added to the bid schedule for the removal/disposal of inadequate soil and importation/placement of adequate soil if compaction cannot be obtained with reasonable effort.

No geotechnical exploration performed.

8 Please clarify if delivery trucks and construction equipment will be able to drive outside of the construction and reconditioning to pass equipment or turn around.

Contractor is to follow the requirements of Section 107 and 108 all equipment is to stain within the construction limits.

9 Line item A0100 and X0180 includes a lump sum for removal of structures and obstructions. There are no items being shown to be removed in the construction drawings. Please clarify what is to be removed and included in the above-mentioned line item.

The LPSM removal items are to remove existing signs and posts at locations were new ones will be placed, and existing concrete in areas were new concrete pads are to be installed.

10 Are there any seeding requirements in this solicitation? No seeding as part of project.