CA ERFO PLUMAS NF 23N18(1), Frazier Creek Bridge

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
6982AF22B000029
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
California 95971, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice seeks engineering and construction services to replace the Frazier Creek Bridge in Plumas National Forest, which was damaged in the 2020 wildfires. The Department of Transportation Federal Highway Administration will procure these services to meet the purpose of fully replacing the one-lane, 36-foot bridge with a new prefabricated steel structure measuring 54 feet by 20 feet. Contractors must have the capability to perform excavation and embankment work, install riprap and roadway aggregate, erect the bridge, and lay asphalt pavement. The evaluation will consider the contractor's ability to complete the work between the anticipated dates of January 2023 to September 2023. The last day for questions regarding this notice is September 29, 2022.

The acquisition is set aside for total small business and the primary NAICS code is 237990 with a PSC code of Z1PB. The replacement bridge and approaches are estimated to cost between $700,000 to $2,000,000. Key work items include removal of the existing bridge, 1,000 cubic yards of excavation/embankment, 250 cubic yards of riprap, 400 tons of roadway aggregate, a 54-foot by 20-foot prefabricated steel bridge, 200 tons of asphalt pavement, 150 linear feet of guardrail, 100 equipment hours, and 60 labor hours to complete construction by September 2023.

Notice text

THIS IS NOT A REQUEST FOR BID


PLANS AND SPECIFICATIONS ARE NOT AVAILABLE

The solicitation will be set aside for Small Business

PROJECT NUMBER:  CA ERFO PLUMAS NF 23N18(1)

PROJECT NAME:   FRAZIER CREEK BRIDGE

PROJECT DESCRIPTION AND LOCATION:  The Plumas National Forest (PNF) sustained significant damage to transportation facilities, including bridges during the 2020 fire season. The US Forest Service (FS) is requesting that the Central Federal Lands Highway Division (CFLHD) perform engineering and construction services to replace the Frazier Creek Bridge structure utilizing Emergency Repair for Federally Owned Roads (ERFO) and Forest Service funds.

The project site is located approximately 26 miles southeast of Quincy, CA and 45 miles northeast of Oroville, CA on Forest Service Route 23N18 within Plumas National Forest in Plumas County, CA.

The original bridge was a one-lane, two-way traffic single span structure at 0 degrees skew.  It has an overall bridge length of 36 feet, roadway width (curb to curb) of 18 ft, and deck width (outside to outside) of 19.5 ft.  

SCOPE OF THE WORK: The purpose of the project is to replace the Frazier Creek Bridge in Plumas National Forest in Plumas County, California.  The bridge was completely damaged by fire in 2020 and will be fully replaced with a prefabricated steel bridge. A one-lane, 54-ft x 20-ft proposed structure is anticipated.

The roadway approaches will be reconstructed for up to 150 feet on either end of the bridges. The bridge and a short section of the roadway approaches will be asphalt overlaid to reduce sediment from reaching the stream. Bridge rail and guardrail with terminals will be included.

Items worth noting:

  • The work will be listed within a single Schedule (Schedule A) and no options are proposed.
  • Adjacent segments of Forest Route 23N18 will remain closed during construction and can be used for contractor staging and storage. 
  • Access is to both sides of the bridge is possible by an approximate 20-mile detour.
  • Deep foundations (micro-piles or drilled shafts) are anticipated

PRINCIPAL WORK ITEMS:

Approximate quantities for major work items:

  • 1 (LPSM) of Removal of Existing Structures and Obstructions
  • 1000 CUYD of Excavation/Embankment Construction       
  • 250 CUYD of Riprap
  • 400 TON of Roadway Aggregate
  • 54-ft x 20-ft of Prefabricated Steel Bridge
  • 200 TON of Asphalt Pavement                     
  • 150 LNFT of Guardrail, including terminals
  • 100 hours of Equipment Hours          
  • 60 hours of Labor Hours

ANTICIPATED SCHEDULE: 

Advertise:  October 2022

Award:  December 2022 

Construction:  January 2023 – September 2023 

The anticipated cost range is between $700,000 and $2,000,000. 

Notice history

Notice Type Posted
CA ERFO PLUMAS NF 23N18(1), Frazier Creek Bridge Award Award Notice
CA ERFO PLUMAS NF 23N18(1), Frazier Creek Bridge Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Humbolt pacific crest trail bridge replacement Bridgeport, California 93517, United States · NAICS 237310 Forest Service No set-aside
Purchase of 2 or 3 Temporary Road Bridges Duluth, Minnesota 55808, United States · NAICS 332312 Forest Service No set-aside
Acadia National Park Maine, United States · NAICS 237310 Federal Highway Administration Total Small Business
GRSM 321788 - Oconaluftee River Trail NAICS 237310 — No set-aside
WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 Forks, Washington, United States · NAICS 237310 Federal Highway Administration No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors