This notice seeks engineering and construction services to replace the Upper West Branch Bridge on Forest Route 18N31 in Siskiyou County, California, which was damaged in the 2020 wildfires. The U.S. Forest Service and Central Federal Lands Highway Division will replace the existing 79-foot steel truss bridge with a proposed 90-foot concrete bridge incorporating wood cellulose nano-crystals in the concrete mix design for precast girders. Proposals are due March 22, 2022, with award anticipated in April 2022 and construction to be completed between May and October 2022. Evaluation will consider technical approach, schedule, and price.

This project is set aside for HUBZone small businesses. Principal work items include removal of existing structures, excavation/embankment, riprap, aggregates, asphalt paving, guardrails, and turf establishment. Oregon State University will advise on the concrete mix design. The anticipated cost range is $1-4 million. Deep foundations and a 6-mile detour route will be required.

Notice text

THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

PROJECT DESCRIPTION AND LOCATION:  The Klamath National Forest (KNF) sustained significant damage to transportation facilities, including bridges during the 2020 fire season. The US Forest Service (FS) is requesting that the Central Federal Lands Highway Division (CFLHD) perform engineering and construction services to replace the Upper West Branch Bridge structure utilizing Emergency Repair for Federally Owned Roads (ERFO) and Forest Service funds.

The project site is located in Siskiyou County. CA., approximately 1/3-mile northwest on Forest Route 18N31 from Grayback Road.

The original bridge was a 79-foot x 11-foot, single-lane, steel truss bridge with concrete abutments and timber decking.

SCOPE OF THE WORK: The purpose of this project is to fully replace the Upper West Branch Creek Bridge on Forest Route 18N31. This bridge was damaged by fire in 2020 and will be fully replaced with a proposed concrete bridge utilizing wood cellulose nano-crystals (CNC) incorporated in the concrete mix design for precast concrete girders. A 90-ft x 16-ft proposed structure is anticipated. Portions of the existing abutments are proposed to remain, but will not be used to support the new bridge.

The roadway approaches will be reconstructed for up to 150 feet on either end of the bridges. The bridge and a short section of the roadway approaches will be asphalt overlaid to reduce sedimentation into the stream. Bridge rail and guardrail with terminals will be included.

Items worth noting:

  • Oregon State University (OSU) is a project partner and will be providing concrete mix-design advice with the inclusion of CNCs.
  • The work will be listed within a single Schedule (Schedule A) and no options are proposed.
  • Adjacent segments of Forest Route 18N31 will remain closed during construction and can be used for contractor staging and storage. 
  • Access is to both sides of the bridge is possible by an approximate 6-mile detour.
  • Deep foundations (micro-piles or drilled shafts) are anticipated

PRINCIPAL WORK ITEMS:

Approximate quantities for major work items:

  • 1 (LPSM) of Removal of Existing Structures and Obstructions
  • 300 CUYD of Excavation/Embankment Construction         
  • 500 CUYD of Riprap
  • 200 TON of Roadway Aggregate
  • 90-ft x 16-ft of Concrete Bridge
  • 200 TON of Asphalt Pavement                     
  • 150 LNFT of Guardrail
  • 80 hours of Equipment Hours
  • 80 hours of Labor Hours
  • 300 SQYD of Turf establishment
  • 1 (LPSM) of Temporary Traffic Control      

ANTICIPATED SCHEDULE: 

Advertise:  March 2022

Award:  April 2022 

Construction:  May 2022 – October 2022 

ESTIMATE: 

The anticipated cost range is between $1,000,000 and $4,000,000. 

Notice history

Notice Type Posted
CA erfo klamath NF 18N31(1) upper west branch bridge Award Award Notice
CA erfo klamath NF 18N31(1) upper west branch bridge Latest solicitation Solicitation
This notice Pre-Solicitation
CA erfo klamath NF 18N31(1) upper west branch bridge Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Humbolt pacific crest trail bridge replacement Bridgeport, California 93517, United States · NAICS 237310 Forest Service No set-aside
Purchase of 2 or 3 Temporary Road Bridges Duluth, Minnesota 55808, United States · NAICS 332312 Forest Service No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors