Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Happy Camp, California, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This notice seeks to procure engineering and construction services to replace two bridges damaged in the 2020 wildfires on the Klamath National Forest in California. The Central Federal Lands Highway Division of the Department of Transportation Federal Highway Administration will replace the Upper Doolittle Creek Bridge and Mill Creek Bridge with prefabricated steel structures. Proposals will be evaluated based on technical qualifications, past performance, and price to award a single contract with a period of performance from May 2022 through October 2022. The anticipated advertisement date is February 2022 with an award date of April 2022.
This procurement has been designated as a HUBZone set-aside. The primary NAICS code is 237990 and PSC code R499. The engineer's estimate is between $1 million to $5 million. Key work includes removal of the existing timber structures, excavation and embankment work, installation of 400 cubic yards of riprap, 400 tons of aggregate, and 400 tons of asphalt pavement across 150 feet of roadway approaches for each bridge. The new bridges will be 70 feet long by 16 feet wide for Upper Doolittle Creek and 60 feet long by 28 feet wide for Mill Creek.
Notice text
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
THIS WILL BE ADVERTISED AS A HUBZONE SET-ASIDE.
PROJECT NUMBER: CA ERFO KLAMATH NF 17N11(1)
PROJECT NAME: UPPER DOOLITTLE & MILL CREEK BRIDGES
PROJECT DESCRIPTION: The Klamath National Forest (KNF) sustained significant damage to transportation facilities, including bridges during the 2020 fire season. The US Forest Service (FS) is requesting that the Central Federal Lands Highway Division (CFLHD) perform engineering and construction services to replace the Upper Doolittle and Mill Creek Bridge structures utilizing Emergency Repair for Federally Owned Roads (ERFO) funds.
The Upper Doolittle Creek Bridge is located approximately 5.9 miles Northwest of Happy Camp on Forest Route 17N11 within Klamath National Forest in Siskiyou County, CA.
The Mill Creek Bridge is located approximately 15.3 miles Northwest of Happy Camp on Forest Route 18N15 within Klamath National Forest in Siskiyou County, CA.
Upper Doolittle Existing bridge information:
- Single span structure 41’ long with clear width 14.1’.
- On tangent with no skew.
- Bridge is single lane bridge built in 1966.
- Bridge designed to H20 design vehicle load. Not posted prior to fire.
- Superstructure is timber glulam girders, deck panels, and railings. No approach railing. Object markers at ends.
- Substructure abutments and wingwalls are timber pile and lagging walls with tiebacks. Bottom of wall approximately 17’ below profile grade. Rock bearing not noted on plans.
Mill Creek Existing bridge information:
- Single span structure 40’ long with clear width 20.25’.
- Bridge is on a horizontal curve alignment of radius 100’ but constructed on tangent chord with no skew.
- Bridge is extra wide single lane bridge, most likely to accommodate turning movements of vehicles along sharp curve.
- Bridge built in 1981.
- Bridge designed to HS20 design vehicle load. Bridge not posted prior to fire.
SCOPE OF THE WORK: The purpose of this project is to fully replace both the Upper Doolittle and Mill Creek Bridges.
Upper Doolittle Proposed Scope/information:
- A 70-ft x 16-ft proposed structure is anticipated for Doolittle Creek.
- Prefabricated steel bridge with rolled girders, structural steel decking and asphalt fill.
- Structural depth would be approximately 36” deep.
- All structural steel girders, diaphragms, and railing components on bridge would be weathering steel. Steel thrie-beam bridge railing.
Mill Creek Proposed Scope/information:
- A 60-ft x 28-ft proposed structure is anticipated for Mill Creek.
- Prefabricated steel bridge with rolled girders, structural steel decking and asphalt fill.
- Structural depth would be approximately 36” deep.
- All structural steel girders, diaphragms, and railing components on bridge would be weathering steel. Steel thrie-beam bridge railing.
The roadway approaches will be reconstructed for up to 150 feet on either end of the bridges. The bridges and short sections of the roadway approaches will be asphalt overlaid to reduce sedimentation into the streams. Bridge rail and guardrail with terminals will be included.
Items worth noting:
- Both existing structures have been completely removed and the timber stacked on site. The FHWA contract will include disposal of the material.
- The work will be listed within a single Schedule (Schedule A) and no options are proposed.
- Adjacent segments of the Forest Routes will remain closed during construction and can be used for contractor staging and storage.
- Access is to both sides of the Doolittle Creek Bridge via by an approximate 8-mile detour.
- Access is to both sides of the Mill Creek Bridge via by an approximate 10-mile detour.
- Deep foundations (micro-piles or drilled shafts) are anticipated
PRINCIPAL WORK ITEMS:
Approximate quantities for major work items:
- 1 LPSM of Removal of Existing Structures and Obstructions
- 400 CUYD of Excavation/Embankment Construction
- 1000 CUYD of Riprap
- 400 TON of Roadway Aggregate
- (1) 70-ft x 16-ft Prefabricated Steel Bridge
- (1) 60-ft x 28-ft Prefabricated Steel Bridge
- 400 TON of Asphalt Pavement
- 300 LNFT of Guardrail
- 160 hours of Equipment Hours
- 160 hours of Labor Hours
- 500 SQYD of Turf establishment
- 1 LPSM of Temporary Traffic Control
ANTICIPATED SCHEDULE:
Advertisement: February 2022
Award: April 2022
Construction: May 2022 – October 2022
ENGINEER’S ESTIMATE:
The proposed project is estimated at a cost between $1 million and $5 million.
Notice history
| Notice | Type | Posted |
|---|---|---|
| CA ERFO KLAMATH NF 17N11(1) Upper Doolittle & Mill Creek Bridges | Award Notice | |
| CA ERFO KLAMATH NF 17N11(1) Upper Doolittle & Mill Creek Bridges | Solicitation | |
| This notice | Pre-Solicitation | |
| CA ERFO KLAMATH NF 17N11(1) Upper Doolittle & Mill Creek Bridges | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Humbolt pacific crest trail bridge replacement | Forest Service | No set-aside | |
| Purchase of 2 or 3 Temporary Road Bridges | Forest Service | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity