Building Envelope Repairs, Building 656, Recreation Center, Naval Station Newport.
Award Notice Posted
- Solicitation number
- N4008509B9747
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Awarded
- to Endicott Constructors Corporation
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- N4008509C9747 Federal contract award
- NAICS code
- 238190 Other Foundation, Structure, and Building Exterior Contractors
- PSC
- Not on record
- Place of performance
- Bldg. 656, Recreation CenterNewport, RI., Newport, RI 02841 USA
Notice details come from SAM.gov. Updated .
Notice text
To provide all necessary labor, material, equipment and supervision to complete project; supply all shoring and protection to protect building areas and landscaped areas. Supply chutes, disposal facilities, transportation and dispose of all materials, dirt, and debris off-site. Obtain all necessary permits. Provide all temporary protection, lifts, hoists, manpower and equipment to protect building components. Coordinate demolition and new work with existing utilities as required.Remove brick masonry units, reinforced concrete masonry units and concrete unit bond beams as indicated in drawings. Rebuild brick masonry where damaged during demolition, pin back masonry walls to remain, and rebuild designated reinforced concrete masonry unit exterior pilasters and bond beam as indicated in drawings. Provide new roof access ladder from grade to low roof.Remove all seashells, gravel and debris from roof.Remove existing built up roof, roof wall flashings, rigid insulation and wood blocking down to lightweight concrete topping or metal deck at adjacent insulation height. Provide plywood at masonry rising wall. Install blown-in insulation at metal space assembly. Project includes metal furring channels, and system components, EFIS wall assemblies. Remove existing windows, doors and louvers. Remove and replace drain bowls.Excavate and backfill as required to perform steam line work. Provide new infill and finished surface, (grass, asphalt, etc). Temporary disconnect mechanical and electrical services as required, cap and remove existing steam and condensate piping, including anchors and expansion loops, etc.Clean all of area.
Includes Environmental goals, grading, ersosion, minimal environmental impact.Use renewable energy and materials.Reduce construction waste, etc.
Files
| File | Type | Posted |
|---|---|---|
| N4008509B9747synopsis.doc | DOC document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Award Notice | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity