Building 79 demolition and site prep
Closed Solicitation Posted
- Solicitation number
- RFP_NO_MF02_2020
- Agency
- Department of Energy
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 562910 Remediation Services
- PSC
- C1HA Architect And Engineering- Construction: Government-Owned Contractor-Operated (Goco) R&D Facs
- Place of performance
- Berkeley CA 94720 USA
Notice details come from SAM.gov. Updated .
Notice text
Project Location:
Lawrence Berkeley National Laboratory, also referred to as LBNL and Berkeley Lab
1 Cyclotron Road, Berkeley, CA 94720
Project Name: Building 79 Demolition and Site Prep
Building 79 is a 4,056-square-foot metal-clad building, Asset 79B is the compressed gas loading dock west of Building 79. In preparation for the expansion of the adjacent Grizzly Peak electrical substation the RFP contains the following two unpriced options:
Option No. 1: Construction of a temporary 12kV bypass and removal of legacy 12kV duct bank after by-pass install.
Option No. 2: Construction of transformer pads, tower foundations, basic pads, and a utility vault for the electrical substation expansion.
Project Magnitude: est. $7M - $9M
RFP Documents Availability Date: April 20, 2020 at the following Google site for “RFP No. MF02-2020 - B79 Demo and Site Prep”
https://drive.google.com/drive/folders/1h1Mx4bWQvuL_DIuIKFugGkeDqGo0MqYP?usp=sharing
See the RFP document for additional details. The Scope of Work has been provided and additional information, including GFI documents, location dwg, and photos.
Schedule est.: – To Be Revised and Provided
Project Term: Base Scope of Work – 15 months in years 2020 and 2021
Intent: Best Value Source Selection, Single Awardee
Attachments
| File | Type | Posted |
|---|---|---|
| Announcement_B79Demo_and_SitePrep.pdf |