Buckhorn Lake Re-surfacing of Tailwater Area Parking Lot and Maintenance Compound in Perry County, KY.
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912QR24Q0089
- Agency
-
ENDIST Louisville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District Louisville is seeking bids for the resurfacing of the Tailwater Area Parking Lot and Maintenance Compound at Buckhorn Lake in Perry County, Kentucky. The estimated construction cost for this firm-fixed price contract is between $100,000 and $250,000, and it will be awarded to the responsible offeror submitting the lowest quote. Contractors must be registered in the System for Award Management (SAM) database and comply with the applicable representation and certification requirements. The solicitation is set aside for small businesses, and the NAICS code is 237310 (Highway, Street, and Bridge Construction) with a size standard of $45 million.
This is a 100% small business set-aside opportunity. The place of performance is Perry County, Kentucky. No incumbent or current contractor information is provided. The solicitation has a posted date of July 11, 2024, and a due date of August 1, 2024. In lieu of both performance and payment bonds, only a payment bond or irrevocable letter of credit is required.
Notice text
Buckhorn Lake Re-surf acing of Tailwater Area Parking Lot and Maintenance Compound in Perry County, KY.The estimated construction cost is Between $100,000 and $250,000. One firm-fixed price contract will be awarded based on the lowest quote. NAICS Code 237310, Size Standard $45 Million.This is a 100% set-aside for Small Businesses.Contractors must register and complete the representation and certification requirements in the System for Award Management (SAM)database, available at https://sam.gov. Please ensure your annual SAM registration is current. Offerors must comply with the requirements of52.204-7, 52.204-8, 52.232-33, and any other representation and certification requirements in this solicitation through SAM.PLEASE NOTE: SAM is completely free of charge for both registrants and users.Block 12A Below : In lieu of both Performance and Payment Bonds, per FAR 52.228-13 Alternate Payment Protections (2000) and FAR28.102-1(b), only a Payment Bond or Irrevocable Letter of Credit is required. A Performance Bond is not required
Notice history
| Notice | Type | Posted |
|---|---|---|
| Buckhorn Lake Re-surfacing of Tailwater Area Parking Lot and Maintenance Compound in Perry County, KY. | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Asphalt Services at Carr Creek Lake | ENDIST Louisville | No set-aside | |
| Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP) | ENDIST Louisville | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity