About this opportunity

The U.S. Army Corps of Engineers Portland District is seeking industry input for a comprehensive trashrack replacement project at the Bonneville Powerhouse 1 facility. The project involves removing and replacing 162 existing trash racks originally installed in 1937, along with significant debris and sediment removal from a 20 ft by 1000 ft area at approximately 70 feet water depth. Key objectives include pre-site survey, fabrication and installation of new trashracks, removal of existing racks, and careful debris management within strict environmental and operational constraints. The government will use an Invitation for Bid method to determine best value, with responses due by May 15, 2025. Interested contractors must submit a six-page response detailing their capabilities, project experience, and addressing specific questions about project execution.

The solicitation is open to all business sizes, with a strong emphasis on small business participation, including 8(a) firms, HUBZone, WOSB, SDVOSB, and VOSB businesses. The estimated construction cost ranges from $10 million to $25 million, with a planned contract advertisement in September 2025 and anticipated award in November 2025. The project is classified under NAICS code 237990 with a size standard of $45 million. Work is constrained by an in-water work window from December 1 to February 28, with full project completion expected by the end of 2027. Contractors will need to navigate complex operational requirements, including securing multiple dam units during diving operations and managing potential lead paint abatement during trashrack removal.

Notice text

General. This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2.

This Sources Sought is to gain knowledge of the interest, capabilities, and qualifications of industry so the government can make informed business decisions. We are seeking responses from both large and small business members of industry to include: Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman-Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and Veteran Owned Small Business (VOSB). All interested parties are highly encouraged to respond.

Reponses to this Sources Sought announcement will be used by the Government to make business decisions and to inform potential future solicitations.

The North American Industrial Classification Code (NAICS) for this requirement is:  237990, Other Heavy and Civil Engineering Construction

The related size standard is: $45 million.

Formal Sources Sought Response Due – 15 May 2025 at 3:00 pm Pacific Time.

1.            Project Background.

Bonneville’s 1st Powerhouse has 10 main units and one station service unit requiring new intake trash racks. Each main unit consist of three slots. Each slot has six racks – one bottom and five top racks. The station service unit has one top rack, four intermediate racks and one bottom rack. All main unit trash racks are similar in design. The existing Bonneville Powerhouse I trash racks were originally installed in 1937 and are now 80 years old. As part of annual maintenance, these trash racks are cleaned and inspected, except the lower racks which are left in place to prevent debris from entering the units. The last time the lower trash racks were removed and inspected was 1983.

2.            Project Scope.

a. The following information represents the project objectives:

i.             Pre-site survey.

ii.            Fabrication and installation of 162 - 22'-1 1/4" long, 1'-7 1/2" wide x 12' tall new trash racks.

iii.           Removal and disposal of 174 existing trash racks. Disposal of an additional 29 existing trash racks that are being stored onsite.

iv.           Debris removal or debris relocation (brush, tree trunks, etc.), and relocation of sediment to ensure successful installation of the trashracks. The volume of debris and sediment is approximately 800 cubic yards total in a 20 ft by 1000 ft area, down to a -2 EL., at an approximate water depth of 70 feet.

i.             This large volume is assumed necessary so that the area stays clear long enough for the trashrack installation work to occur. This volume could be reduced if schedule sequencing is in such a way that the trashrack removal/installation can follow quickly behind the debris removal/relocation.

ii.            Debris includes 12"-24" diameter trees. There are some 36" diameter trees that cross multiple units.

iii.           Debris in front of the units ranges 1-15 feet.

v.             Debris removal/relocation behind existing trashracks, as necessary, to install the new trashracks.

i.             The trashracks spacing is 6” on center.

vi.           Installation of 162 new trash racks and 12 additional trash racks that are already onsite.

NOTE: USACE would greatly appreciate input from industry on the best means of clearing the debris and sediment to allow for access to the track racks for replacement. 

Several options have been discussed, including:

1. Removing all debris and sediment from the water and disposing of in accordance with all federal, state, and local laws.

2. Removing only debris and move sediment upstream from the face of the dam, leaving it in the water.

3. Moving the debris and sediment upstream from the face of the dam, leaving it in water.

b. Anticipated Construction Schedule:  CENWP intends to advertise (09-2025) and award (11-2025) a Construction Contract with estimated construction completion by the end of calendar year 2027.

c. Estimated Construction Cost (ECC):  The current ECC is between $10,000,000 and $25,000,000. Ref. FAR 36.204 Disclosure of Magnitude and DFARS 236.204 Disclosure of Magnitude.

d. Number and Type of Contracts: NWP contemplates awarding one (1) Firm-Fixed Price Construction contract. Maximum Small business participation is being sought at both the Prime and subcontracting levels.

e. Anticipated Source Selection Process:  The expected method to determine the best value to the government is Invitation for Bid.

3.            Project Specific Constraints and Challenges:

a.            Debris removal and divers are only allowed during the In-Water-Work (IWW) window, December 1 – February 28. Removal and installation of the trashracks can occur outside of the IWW. This needs to be carefully coordinated as debris may need to be removed behind the trashracks for successful installation of the trashracks.

b.            It is assumed that debris removed from the river would need to be tested for environmental compliance prior to disposal.

c.            When a boat or barge is in the water, assume all units are out of service.

d.            Any diving, at any time of the year, requires at least three main units (unit being dove on and each immediate adjacent unit), including the ITS gates, to be secured & locked-out/tagged-out during dive operations. Depending upon the time of year, river flows and levels have dictated that additional main units may need to be secured and locked-out/tagged-out to ensure the dive location is not only safe but efficient for the divers to work in.

e.            The operating project will provide the gantry crane and operation of gantry crane for installation and removal of the main unit trashracks. The contractor will be required additional mobile crane (90 ton possibly) for station service trashrack installation and other purposes.

f.             The existing trash rack paint is likely contains lead. The Contractor is responsible to perform lead abatement or to dispose in an approved site.

4.            Questions for Industry:

a.            Is there anything in our SOW that would discourage you from bidding?

b.            Is there anything in our SOW that would cause enhanced pricing uncertainty?

c.            Are there any concerns with schedule or project specific constraints?

d.            Are there any market conditions or industry practices that you feel the government needs to be aware of?

e.            What are the best means of clearing the debris and sediment to allow for access to the track racks for replacement?

f.             What kind of equipment and methodology would be used to move/remove the sediment and debris?

g.            What would be the approximate cost difference of removing debris versus moving debris upstream?

h.            What construction sequence would be utilized for this work?

i.             Approximately how long will it take to fabricate 162 trashracks?

j.             Space onsite is limited. Is it cost prohibitive to store the 162 trashracks off-site prior to installation?

k.            Is there interest amongst contractors to perform the scope of work under one contract or would the trashrack scope and debris scope need to be separate contracts?

5.            Submission Instructions. Formal responses to this Sources Sought notice must be submitted electronically (via email) with SUBJECT: Sources Sought – Bonneville Powerhouse 1 Trash Rack Replacement. Please email to Brandon Lasich, Contracting Officer, at Brandon.M.Lasich@usace.army.mil and Ian Lutjens, Contracting Specialist, atIan.K.Lutjens@usace.army.mil, before response due date.

Interested parties’ responses to this Sources Sought shall be limited to six (6) pages and shall include the following information:

a.            Firm's name, address, point of contact, phone number, e-mail address, CAGE and Unique Entity ID.

b.            Firm's business category and size:  Large Business (include summary of small business participation metrics), Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman-Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and at the subcontracting level, Veteran Owned Small Business (VOSB).

c.            An explanation of the prime firm’s capabilities, special qualifications/certifications and equipment and describe the work to be self-performed as it pertains to the proposed work outlined in the Project Scope.

d.            A description of work performed under similar project constraints and challenges listed under paragraph 3.

e.            Project Examples (for Joint Ventures, please include projects completed by the Joint Venture if available):

•              To be considered for a potential set aside strategy, provide a maximum of three (3), minimum of one (1) similar project(s). These project examples must be similar in size, scope and complexity to the work described in paragraph 3 of this notice, with a description of each project (to include pertinent qualitative and quantitative information about featured scope elements), and include the following:

Project Title     

Contract Number          

Contract award date    

Customer name, phone number and email address    

Prime or Subcontractor             

Initial contract dollar value      

Final contract dollar value        

Initial contract completion date            

Final contract completion date              

Customer satisfaction

The Government may verify information in CPARS or PPIRS.

f.             Firm's Joint Venture information if applicable - existing and potential.

g.            Firm's Bonding Capability in the form of a letter from Surety.

h.            Firm's interest and the likelihood in bidding on the solicitation when it is issued. (Refer to planned advertise and performance dates)

i.             Responses to the government’s questions in paragraph 5 and any other information the contractor feels the government needs to be aware of.

6.            Disclaimer and Important Notes.

a.            This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought or any follow up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's capabilities to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted.

b.            All interested firms must be registered in the System for Award Management (SAM) at https://www.sam.gov to have size status considered. You must remain current for the duration of the source selection process to be eligible for award of a Government contract.

7.            Attachments:

a.            Draft Plans

b.            Bonneville Powerhouse 1 – 2025 Bathymetry Images

c.            Bathymetric data can be made available upon request.

d.            Dive video showing the debris in the vicinity of the trashracks can be made available upon request.

Files

File Type Posted
Bonneville Powerhouse 1 - 2025 Bathymetry Images.docx DOCX document
BON PHI Trashrack DRAFT Plans.pdf PDF

Notice history

Notice Type Posted
Bonneville Power House 1 Trash Rack Replacement Latest pre-solicitation Pre-Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
John day DAM navigation lock tainter valve (TV) repairs TV3 and TV4 Location and Access Details. Oregon Side Physical Access, Near Rufus, OR 97050 accessible via I-84, Exit 109. Washington Side (Closest Town), Goldendale, WA 98620 approximately 20 miles north across the river. River Location, Mile 216.6 on the Columbia River, joining Sherman County, Oregon, and Klickitat County, Washington. 98628 · NAICS 237990 ENDIST Portland No set-aside
LLA Navigation Lock Switchgear Pomeroy, Washington 99347, United States · NAICS 238210 ENDIST Walla Walla Total Small Business
John day DAM unit 10 packing box replacement John Day Dam, Sherman County, Oregonthe John Day Dam On The Columbia River Between Sherman County, Oregon, And Klickitat County, Washington. Rufus, Oregon 97050, United States · NAICS 237990 ENDIST Portland No set-aside
Navigation lock tainter valve (TV) repair, TV1 The Dalles Dam (Washington side), Lyle, WA 98635. 98635 · NAICS 237990 ENDIST Portland No set-aside