Boiler Thermal Efficiency Improvements - Boiler Repairs at 27A, A6, 7CC. Naval Station Newport, Newport RI

Award Notice Posted

Solicitation number
N4008516R4639
Agency
Awarded
to Kisan-Pike
Set-aside
Total Small Business

Opportunity facts

Contract number
N4008514D52480010 Federal contract award
NAICS code
541330 Engineering Services
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Provide all labor, materials, transportation, equipment, supplies

and supervision as required for each relocated boiler @ 27A and A6.

a) Pipe in relocated boiler’s steam supply to existing steam header.

b) Pipe in relocated boiler’s feedwater supply to feedwater supply header

c) Pipe in relocated boiler’s bottom blowdown system to existing bottom blowdown header.

d) Pipe in relocated boiler’s surface blow system to second isolation valve.

e) Pipe in relocated boiler’s gas train to existing gas supply pipe

f) Wire in relocated boiler’s boiler/burner/blower/VFD power supply (A6 and 27A) and control

wiring (27A) where indicated. Wire in feedwater control valve, conductivity sensor, and surface

blowdown valve

g) Pipe in relocated boiler’s Safety valve discharge piping.

h) Connect stack from boiler breaching to existing stack/vent connector.

i) Insulate all mechanical systems equal to adjacent original construction

j) Wire in control system for bldg.

27A and make boiler 100 % operational (27A only)

k) Provide all labor, materials, transportation, equipment, supplies and supervision as required for

piping in Heat Exchanger and Heater Coil located in the boiler 4 area, 7CC

Update #1 ·

Provide all labor, materials, transportation, equipment, supplies

and supervision as required for each relocated boiler @ 27A and A6.

a) Pipe in relocated boiler’s steam supply to existing steam header.

b) Pipe in relocated boiler’s feedwater supply to feedwater supply header

c) Pipe in relocated boiler’s bottom blowdown system to existing bottom blowdown header.

d) Pipe in relocated boiler’s surface blow system to second isolation valve.

e) Pipe in relocated boiler’s gas train to existing gas supply pipe

f) Wire in relocated boiler’s boiler/burner/blower/VFD power supply (A6 and 27A) and control

wiring (27A) where indicated. Wire in feedwater control valve, conductivity sensor, and surface

blowdown valve

g) Pipe in relocated boiler’s Safety valve discharge piping.

h) Connect stack from boiler breaching to existing stack/vent connector.

i) Insulate all mechanical systems equal to adjacent original construction

j) Wire in control system for bldg.

27A and make boiler 100 % operational (27A only)

k) Provide all labor, materials, transportation, equipment, supplies and supervision as required for

piping in Heat Exchanger and Heater Coil located in the boiler 4 area, 7CC.

Files

File Type Posted
Attachment_1_N4008516R4638_Bid_Schedule.docx DOCX document
RFP_N4008516R4638_Boiler_Thermal_Efficiency.docx DOCX document
Attachment_2_Statement_of_Work.pdf PDF
Attachment_4_FY16_Base_Access_Request_.xlsx XLSX spreadsheet