Boiler Retubing, NAS Meridian

Awarded Award Notice Posted

Solicitation number
N6945014Q5330
Agency
Naval Facilities Engineering Command Department of the Navy, Department of Defense
Awarded
to Burton Construction Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
N69450--14-M-5330 Federal contract award
NAICS code
238290 Other Building Equipment Contractors
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

Added: Jun 06, 2014 5:41 pm Al l measurements are estimates only and must be field verified. There are 60 tubes to be replaced, approximately 2” in diameter.

Boiler technicians that are performing the work on the boiler shall provide documentation of (R-Stamp) certification that is required in UFC 3-430-07, chapter 8 sect 2.

The contractor shall remove all tubes from boiler and replace with new. The contractor shall clean holes and dye check for cracks. If minimal cracks are found, contractor shall repair the cracks in accordance with the NBIC code with all proper documentation to be turned in to contracting officer. The tubes shall be flare rolled and free of leaks. After the tubes have been replaced the contractor shall hydrostatically test the boiler.

The pressure test should be 1-1/2 times the safety valve popping pressure or 1-1/2 times the (MAXIMUM ALLOWABLE WORKING PRESSURE) whichever is less. Testing shall be verified by contracting officer in charge of project.