Boiler Maintenance Goodfellow AFB

Closed Solicitation Posted

Solicitation number
FA303023Q0019
Agency
Air Education and Training Command Air Force, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
J045 Maint/Repair/Rebuild Of Equipment- Plumbing, Heating, And Waste Disposal Equipment
Place of performance
Goodfellow AFB, Texas 76908, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

** Update!!! **

There are 27, not 28 boilers needing maintenance. The solicitation has been extended to 3 May 2023 at 4 PM CST. No further questions regarding this project will be accepted. Answers for everyones questions has been asnwered on the Boiler MX RFI document attached.

**There will be a site visit for this requirement on Friday, 21 April 2023 at 0900 CST at Goodfellow AFB. If you wish to attend, send myself the name of your company, a list of the personnel who is attending along with the last 4 of their SSN, DOB, drivers license # with state associated no later than 20 April at 1200 (noon) CST.**

**If you have questions regarding this requirement, send them via email to sarah.sasseen@us.af.mil and christian.cooper.2@us.af.mil no later than 1200 (noon) CST on 24 April 2023. Asnwers to all questions from all interested parties will be provided on a single request for information response document**

The Contractor shall provide all management, tools, supplies, equipment, personal protective equipment
(PPE), labor and parts necessary to perform Annual Preventive Maintenance (PM) on Forced Draft and
Atmospheric Boilers, listed in Appendix A, at Goodfellow Air Force Base (AFB), San Angelo Texas.

Update #3 ·

24 April 2023

Answers to RFI questions

**Not all the boilers have flow meters. For the ones that don’t have flow meters, pressure drops across the boiler will suffice.

No, not all the boilers can be shut down at once.

If there are 2 crew on base, they can have 2 boilers at one time. They can shut the second boiler down that they will be working on next. If you need me to explain anything, please call me.**

**There will be a site visit for this requirement on Friday, 21 April 2023 at 0900 CST at Goodfellow AFB. If you wish to attend, send myself the name of your company, a list of the personnel who is attending along with the last 4 of their SSN, DOB, drivers license # with state associated no later than 20 April at 1200 (noon) CST.**

**If you have questions regarding this requirement, send them via email to sarah.sasseen@us.af.mil and christian.cooper.2@us.af.mil no later than 1200 (noon) CST on 24 April 2023. Asnwers to all questions from all interested parties will be provided on a single request for information response document**

The Contractor shall provide all management, tools, supplies, equipment, personal protective equipment
(PPE), labor and parts necessary to perform Annual Preventive Maintenance (PM) on Forced Draft and
Atmospheric Boilers, listed in Appendix A, at Goodfellow Air Force Base (AFB), San Angelo Texas.

Update #2 ·

**There will be a site visit for this requirement on Friday, 21 April 2023 at 0900 CST at Goodfellow AFB. If you wish to attend, send myself the name of your company, a list of the personnel who is attending along with the last 4 of their SSN, DOB, drivers license # with state associated no later than 20 April at 1200 (noon) CST.**

**If you have questions regarding this requirement, send them via email to sarah.sasseen@us.af.mil and christian.cooper.2@us.af.mil no later than 1200 (noon) CST on 24 April 2023. Asnwers to all questions from all interested parties will be provided on a single request for information response document**

The Contractor shall provide all management, tools, supplies, equipment, personal protective equipment
(PPE), labor and parts necessary to perform Annual Preventive Maintenance (PM) on Forced Draft and
Atmospheric Boilers, listed in Appendix A, at Goodfellow Air Force Base (AFB), San Angelo Texas.

Update #1 ·

The Contractor shall provide all management, tools, supplies, equipment, personal protective equipment
(PPE), labor and parts necessary to perform Annual Preventive Maintenance (PM) on Forced Draft and
Atmospheric Boilers, listed in Appendix A, at Goodfellow Air Force Base (AFB), San Angelo Texas.

Attachments

Files attached to this notice, newest first
File Type Posted
Solicitation Amendment FA303023Q00190002 SF 30.pdf PDF
GAFB BOILER LIST.xlsx XLSX spreadsheet
Boiler MX RFI.docx DOCX document
Goodfellow Boiler Inspection Form.rtf RTF text file
Base Map Address.pdf PDF
Solicitation Amendment FA303023Q00190001 SF 30.pdf PDF
PWS Boiler Maintenance.pdf PDF
GAFB BOILER LIST.xlsx XLSX spreadsheet
Boiler MX Wage Determinations.pdf PDF
Solicitation - FA303023Q0019.pdf PDF
Boiler Photos.pdf PDF
Show all 11

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity