Bog Dam 4 Bridge replacement
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 12445524R0008
- Agency
- Forest Service Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Milan, New Hampshire 03588, United States
- Points of contact
-
- Paul A Boucher paul.boucher@usda.gov
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Agriculture Forest Service is seeking a contractor to demolish and remove the existing bridge superstructure, and construct a new superstructure utilizing the existing abutments for the Bog Dam 4 Bridge replacement project. The contractor will be required to furnish all labor, materials, supervision, and other incidentals necessary to complete the work. Proposals will be evaluated on the offerors' experience, past performance, and technical approach, with non-price factors approximately equal to price. Proposals are due by July 29, 2024, and the period of performance will be from August 12, 2024 to June 28, 2025.
This solicitation is set aside for total small business. No incumbent contractor information is provided. The estimated magnitude of the construction project is between $250,000 and $500,000. The project is located in Milan, New Hampshire and involves demolishing an existing 41-foot multi-beam steel stringer bridge and constructing a new 41-foot superstructure using steel stringers, a timber deck, and a wearing surface.
Notice text
The contractor will furnish all labor, materials, supervision, and other incidentals necessary to demolish and remove the existing bridge superstructure, and construct a new superstructure utilizing the existing abutments.
Attachments
| File | Type | Posted |
|---|---|---|
| Sol_12445524R0008.pdf | ||
| Att 01_Schedule of Items (240614).docx | DOCX document | |
| Att 05_Project Location Map (240326).docx | DOCX document | |
| Att 08_Brass Girder (230428).pdf | ||
| Att 04_Plans (240417).pdf | ||
| Att 02_SOW (240419).docx | DOCX document | |
| Att 03_FSSS (240603).pdf | ||
| Att 06_Load Rating (230603).pdf | ||
| Att 07_Design Analysis (230602).pdf | ||
| Att 09_Wage Rates (240105).pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Bog Dam 4 Bridge replacement | Award Notice | |
| Bog Dam 4 Bridge replacement | Solicitation | |
| Bog Dam 4 Bridge replacement | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity