BLM-CO Cochetopa Canyon Toilet Replacement
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 140L5422Q0002
- Agency
- Bureau of Land Management Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Colorado 114 Gunnison, Colorado 81230, United States
Notice details come from SAM.gov. Updated .
Notice text
BLM-CO Cochetopa Canyon Toilet Replacements
This is a presolicitation synopsis for recreation site improvements in accordance with the attachments. The Government estimates the rough order of magnitude for this project to be between $100,000 - $250,000.
PROJECT DESCRIPTION: The work includes, but is not limited to; demolition of existing toilet buildings, construction of new precast toilet buildings, and site work.
LOCATION: The project is located in Saguache County, Colorado, about 25 miles southeast of Gunnison, CO. Along highway 114, in the Cochetopa Canyon.
Pre-Bid Site Tour: A hosted pre-bid site tour is scheduled for 2 Dec at 10:00. Meet at the at Site 6. We will start there and travel to two other nearby sites.
Basic Contracting Requirements:
1. Active Registration - www.sam
2. Invoicing and Payment - www.ipp.gov - 14 Day Prompt Pay
3. FAR Part 36 - Construction Provisions and Clauses
4. FAR Part 13 - Simplified Acquisition Procedures
5. Davis-Bacon Act Wage Requirements for Saguache County, CO
6. Bonding - Bid (20% of total bid), Performance and Payment
7. Possibility of new COVID-19 Safety Protocols - https://www.saferfederalworkforce.gov/
8. Total Small Business Set -Aside for NAICS 237990 - Size Standard: $39.5M
9. Award Basis - Low Price Technically Acceptable with a through review of your technical response.
Note: For a sufficient technical response, you must provide a detailed and tailored plan addressing this specific project which lists your resources, equipment, personnel, recent and relevant past performance, plan of operations, supervision plan, safety plan, etc. A simple recap of the SOW or blanket statement of "will comply with SOW" is not adequate and will most likely be deemed "not technically acceptable". It does not need to be long or fancy, just needs to adequately explain your plan.
POC: Contracting Officer Robert Hall - rhall@blm.gov - 970-876-9038
Attachments
| File | Type | Posted |
|---|---|---|
| Attachment_2_-_Specifications_1.pdf | ||
| Attachment_3_-_Bid_Schedule_1.pdf | ||
| Attachment_1_-_Plans_1.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| BLM-CO- Cochetopa Canyon Toilet Replacement | Award Notice | |
| BLM-CO- Cochetopa Canyon Toilet Replacement | Solicitation | |
| BLM-CO Cochetopa Canyon Toilet Replacement | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity